IOC Diagram for Backer Roll Design Optimization:

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Proposal for 3D evaluation test plan in VQEG Dec Jun Okamoto (NTT)
Measurement Systems Analysis with R&R INNOVATOR Lite TM The House of Quality presents.
Is Feature Critical to Product Performance OR Responsive to Variation? Develop Complete List Screening Study Varying Machine / Material Designate as Key.
Measurement Systems Analysis with R&R Procedure The House of Quality presents.
Six Sigma Quality Engineering
Your Catapult Team Do the following:
WM Software Process & Quality Generic Processes - Slide #1  P. Sorenson SPiCE Reference Model - how to read Chapter 5 Capability Levels (process.
Questions: Choice the correct answer: 1-Capability Maturity Model for Software (SW-CMM) is used to: a- increase software process capability. b- increase.
CP methodology adapted to Stockholm Convention Swedish International Development Agency S ESSION 9.C United Nations Environment Program Division of Technology.
IE 355: Quality and Applied Statistics I Short Run SPC
Six Sigma Programs Students should be able to: Describe the key elements of a Six Sigma program and how they can be applied to any business process. Explain.
Company Confidential 1 Copyright 2009 Bell Helicopter Textron Inc. All rights reserved Voice of the Process Panel Discussion Lee Tait, Vice President Quality.
This material is approved for public release. Distribution is limited by the Software Engineering Institute to attendees. Sponsored by the U.S. Department.
1 On Rate for Fuel Oil Equipment. 2 Purpose To insure that the equipment is delivering the correct heating value Oil fired equipment must fire within.
1 Design and Analysis of Engineering Experiments Chapter 1: Introduction.
Procedures for managing workflow components Workflow components: A workflow can usually be described using formal or informal flow diagramming techniques,
Project Storyboard (Page 1 of 2)
CPE741: Distributed Systems Course Project Collaborative Family Tree Organizer.
Six Sigma 6s.
DESIGN OF EXPERIMENTS SOFTWARE INJECTION MOLDING
Planning Planning is the establishment of objectives, evaluation and selection of policies, strategies tactics and action required to achieve them. A Forecast.
Monte-Carlo based Expertise A powerful Tool for System Evaluation & Optimization  Introduction  Features  System Performance.
Substation Maintenance
1 Prof. Indrajit Mukherjee, School of Management, IIT Bombay Bill Smith’s findings…. Bill Smith’s paper concluded that if product was found defective and.
MECHATRONICS Group # Group Members’ Names MENG 483 Project Title of the Project Spring 20XX.
Robust Systems BGO/XIG/Wilson Center/Micro Systems & Media/Robust Systems X James Casella Example Optimization Study 04/14/07 Slide 1 IOC Diagram for Backer.
Roberto Silva #65330 February 13,2016 Prof. Eduardo Cabrera.
Intro to Industrial Technology Unit # 1 INTRODUCTION TO TECHNOLOGY Chapter 2 Notes.
Product Lifecycle Management
Manufacturing Simulation Case Studies
Practical Assessment Project Template – DMADV

Lean Six Sigma Road Map Improvement Process Road Map
Algebra 2/Trigonometry Name: _____________________________
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Life Cycle Logistics.
METHODOLOGY (Chapter 3)
IENG Lecture 05 Process Tools:
Six-Sigma : DMAIC Cycle & Application
Chapter 04 Tutorial Using StateCAD
Six Sigma Approach.
MSA / Gage Capability (GR&R)
Achieving High Software Reliability
Summary: The Systems Development Life Cycle
Software Requirements
DESIGN OF EXPERIMENTS SOFTWARE INJECTION MOLDING
Access to HE Standardisation Event Maths, Physics and Engineering Wednesday, 6th December 2017, 9.30 am to pm.
Performing What-if Analysis
OPS/571 Operations Management
Fundamentals of a Business Impact Analysis
Enron Energy Services Energy Management Outsourcing Overview
BPM in E-Gov <An Empirical Study in Europe>
CHAPTER 6 Control Charts for Variables
Access to HE Standardisation Event Social Work, Social Care and Counselling Tuesday, 5th December 2017, 1.30 pm to 4.30 pm.
Implementing Six Sigma Quality
The S0S1 Taskforce: an Example of the Complexity for the ILC R&D Environment Lutz Lilje DESY Beijing ILC Workshop Global Design Effort.
DMAIC STANDARD WORK TEMPLATE
Access to HE Standardisation Event Level 2 and Level 3 Study Skills Wednesday, 1st November 2017, 9.30 am to pm.
Access to HE Standardisation Event General Session - Evening Thursday, 1st December 2016, 4 pm to 7 pm.
The Quality Control Function
VCE IT Theory Slideshows
DMAIC STANDARD WORK TEMPLATE
Access to HE Standardisation Event Chemistry, Biochemistry, Core Science Session Tuesday, 21st November 2017, 9.30 am to pm.
Access to HE Standardisation Event General Session Tuesday, 14th November 2017, 4.00 pm to 7.00 pm.
Access to HE Standardisation Event Humanities, including English Tuesday, 7th November 2017, 1.30 pm to 4.30 pm.
Software Effort Estimation
What is a WebQuest? Guided search for information
WISEds Implementation plan: proposal
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

IOC Diagram for Backer Roll Design Optimization: Summary: 18 factors and 9 responses (transfer functions) investigated. Of the 18 factors, there are 2 CP’s and 2 Noises.

Introduction (continued) Response Descriptions, Weights and Limits for Backer Roll Design Optimization: Empirical Equation Closed Form Equations

Procedure (using DFSS application Software): Create the IPO design sheet (DFSS/Create Design Sheet): Enter all factors, distribution types and distribution parameters for the existing factor set points. Enter transfer functions and other equations necessary to enable the process flow represented in the system IOC diagram. For each response, enter the LS & US limits. Run EVA (DFSS/EVA): Run an Expected Value Analysis to establish a latitude baseline for all responses under investigation. Look for unacceptable low Cpk and high DPM results. Run Parameter Design Optimization (DFSS/Parameter Design): For each factor, enter the range for which it’s mean will be investigated. For each response, enter the weighting (priority) for optimizing each response latitude. The parameter optimization will reset the factor nominals to achieve target results. Re-run EVA for new baseline latitude performance. Repeat for various weightings if necessary. Run Tolerance Design (DFSS/Tolerance Design): If necessary, reduce tolerances (or open if possible) to enable cost effective system performance goals. Re-run EVA to establish new baseline.

Results – Baseline Evaluation: Summary: Initial factor set points generate poor process capability for 4 out of 7 critical responses.

Results - Parameter Design Setup: Inputs show factor ranges enabled to explore design optimization opportunities.

Results - Parameter Design Optimization: