S.Movchan Straw manufacturing and QC

Slides:



Advertisements
Similar presentations
Davide Piccolo INFN Napoli Muon Annul Review Cern 15 September 2003 Chamber Production QA/QC MUON ANNUAL REVIEW On RESISTIVE PLATE CHMABERS CERN, 15 September.
Advertisements

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
G. Olry, H-M Gassot, S. Rousselot (IPN Orsay) EuCARD-SRF annual review 2011, 4-5 May, IPN, Orsay Unité mixte de recherche CNRS-IN2P3 Université Paris-Sud.
Aluminum bellows for experiments
18-Sep-15S.Movchan Straw manufacturing and QC1 Remove metallization from tape by laser. Part 2 laser mode optimization for Hostaphane RNK 2600 samples.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th february 2011 CERN1 Straw Material and development.
16-Oct-15S.Movchan Straw manufacturing and QC1 Straw machine status polished anvil new welding configuration software for on-line seam quality control.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
20-Nov-15S.Movchan Straw manufacturing and QC1 Straw machine status straw fabrication option 1: removing metallization from tape edges by laser study straw.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
 YE+4 disks = 2 Nos. (12 Sectors each)  Support Structures = 2Nos.  AISI 1045 steel bar = 1 No. for checking dimension of 680 mm (0/-0.5)  Fasteners.
Qualification of the longitudinal weld of thin wall PET tubes of the straw tracker of the NA62 experiment Master thesis presented 28 th of june 2011 by:
Status of Activities at CERN
Straw manufacturing current status T.Enik, S.Shkarovskiy, I.Polenkevich,Yu.Potrebenikov
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
N. Dixon PH / DT CERN 12 July Straw Material, weld line latest news and plans.
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
Straw manufacturing current status T.Enic, Yu.Potrebenikov
4-Jan-16S.Movchan Straw manufacturing and QC1 Straw tracker manufacturing procedure Dubna: assembly halls procedure conclusion Presented by S.Movchan.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
N. Dixon PH / DT Straw working group meeting Monday 14 December 2010 CERN1 Straw Material and development.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
26-Feb-16S.Movchan Straw manufacturing and QC1 Dubna NA62 straw tracker assembly area (milestone) halls plans conclusion Presented by S.Movchan.
28-Feb-16S.Movchan Straw manufacturing and QC1 Straw machine status straw welding machine QC by microscope control by computer straw welding speed optimization:
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status 01_09_2010 machine alignment check by laser level control device machine set up after.
8-Mar-16S.Movchan Straw manufacturing and QC1 Straw machine status anvil new welding configuration software for on-line seam quality control conclusion.
Neil Dixon PH/DT Dubna July 1010 Straw Material latest news and plans 1.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
10-Jun-16S.Movchan Straw manufacturing and QC1 Straw manufacturing conditions and QC tape and straw parameters specification conditions of straw production.
Report from the straw working group H. Danielsson 8/29/13Plenary Liverpool, H. Danielsson.
N. Dixon PH / DT Vladimir Elsha JINR Straw working group meeting Monday 6th April 2011 CERN1 Straw Material and development.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
The drift chamber with a new type of straws for operation in vacuum
Status of the PANDA Solenoid Magnet Production in BINP
Quality assurance for Manufacturing Dressed Cavities for SPS prototype cryomodule C. Parente (HL-LHC Technical Quality Officer) Date:
Stress and cool-down analysis of the cryomodule
Production ad Quality control of RPCs for the CMS muon barrel system
new straw end plug: D=10.6 mm straws support frame Levan option
HO Corrector Magnets: decapole test and future plans
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Status of design and production of LEP connection cryostat
Quality Control in Straw Production
S.Movchan Straw manufacturing and QC
S.Movchan Straw manufacturing and QC
Status of straw production straw module assembling
CMS WEEK Sept. 24 Opening session CMS MUONS: Barrel Drift Tubes
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
Structure and etc Shoji Uno (KEK) at B2GM
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
“MUON” Collaboration meeting
BMXP Operation Memo Taper Cutting --Laid abnormity.
Design of Distribution Feedbox at LHC P7
Status of the PANDA Solenoid Magnet Production in BINP
STAR TOF MRPC Mass Production & Q.C. (USTC)
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Status of the PANDA Solenoid Magnet Production in BINP
SksMinus status 04 HB meeting 2008/5/09 白鳥昂太郎.
Presentation transcript:

S.Movchan Straw manufacturing and QC Dubna status Straw machines Assembly halls and tooling Presented by S.Movchan 1-May-18 S.Movchan Straw manufacturing and QC

Continuous straw fabrication Straw fabrication one by one Common view NEW machine Continuous straw fabrication Machine in operation Straw fabrication one by one ready 1-May-18 S.Movchan Straw manufacturing and QC 2

S.Movchan Straw manufacturing and QC Sonotrode + anvil 1-May-18 S.Movchan Straw manufacturing and QC 3

S.Movchan Straw manufacturing and QC Round shape formation by 4 rollers 1-May-18 S.Movchan Straw manufacturing and QC 4

Straw seam quality control 1-May-18 S.Movchan Straw manufacturing and QC 5

O-ring sample tensile test Seam quality control O-ring sample tensile test Visual check 1-May-18 S.Movchan Straw manufacturing and QC 6

Straw bar code + DB NA62 straw label: NA62TASTDU003525 NA62 – NA62 experiment TA – Tracker ST - straw DU– JINR, Dubna, Russia СE – CERN, Sefar, Swiss 003525 – straw serial # (000001-999999) 1-May-18 S.Movchan Straw manufacturing and QC 7

S.Movchan Straw manufacturing and QC Plans “Old” straw machine – READY for straw manufacture (needed tape from CERN) “NEW” straw machine: Tuning – September Tests and improvements - September (add on-line monitoring) Machine certification - end of September - pre-production series: N=100 pc, September (1-2 days) - send to CERN – 3 weeks - tests a lot of straws at CERN – 2 weeks - approval Start of straw manufacture – October 1-May-18 S.Movchan Straw manufacturing and QC 8

S.Movchan Straw manufacturing and QC Dubna 806 straws 1-May-18 S.Movchan Straw manufacturing and QC 9

Mass-production of 806 straws 1-May-18 S.Movchan Straw manufacturing and QC 10

Straw machine parameters after sonotrode reparation: (for straws with serial # ≥180) clean room: T=+(21±1) degree, H=(70±5)% some straw machine parameters: sonotrode angle: about 20 degree anvil diameter: 9.73 mm fixture diameter: 9.90 mm rollers position: right roller – 42/5 mm, left roller – 45/4 mm, gap – 18 mm dust removing from anvil: ON straw welding parameters: ultrasonic generator: clock F=(39750±50) Hz, P = (60÷100) a.u. => about 60% sonotrode head temperature: (27±1) degree (cooling ON) ultrasonic head pressure to tape: 210 g spool pretension: (150-200) g tape friction: (300÷400) g manufacture speed: 7 mm/sec 1-May-18 S.Movchan Straw manufacturing and QC 11

S.Movchan Straw manufacturing and QC 806 straws Tapes number Straw tubes A1-9 58 A1-11 73 A1-17 62 A1-10 84 A1-12 77 A1-8 93 A1-18 96 A1-4 (300 m) 98 A1-2 (300 m) 100 A1-7 (180 m) 65 806 ~90 straws/spool 1-May-18 S.Movchan Straw manufacturing and QC 12

S.Movchan Straw manufacturing and QC BLUE – straw start RED – straw end 806 straws Diameter Elongation Min = 1 mm Resistance Seam width 1-May-18 S.Movchan Straw manufacturing and QC 13

Load max F vs elongation dL: 3-D presentation Dubna 806 straws N Cut: F≤3.7 kG F (kG) dL(mm) 1-May-18 S.Movchan Straw manufacturing and QC Cut: dL≤1 mm 14

Zoom of BAD region near “0” 7 straws F=(0÷3.7) kG @ dL=(0÷1) mm 8 straws N F (kG) dL(mm) F=(3.7÷8) kG @ dL=(0÷1) mm F (kG) dL(mm) 1-May-18 S.Movchan Straw manufacturing and QC 15

dL > 1 mm @ Load max > 3.7 kG (for Dubna 806 straws) Blue – start straw Red – end straw dL=1 mm GOOD straws F=3.7 kG Total rejected straws N=28+7 = 35 straws Dubna straw rejection criteria: elongation dL ≤ 1 mm @ L ≤ 3.7 kG Total rejected straws: N = 35 straws (~ 4 %) and all good straws have elongation more than dL > 1 mm @ L > 3.7 kG 1-May-18 S.Movchan Straw manufacturing and QC 16

S.Movchan Straw manufacturing and QC Conclusion Both CERN and Dubna proposed criteria for straw rejection were tested on Dubna straws. Was shown that: - rejection criteria Load max F ≤ 3.7 kG (Strength=100 Mpa) is wrong: ~ 1 % of straws (7 straws out from 800) have elongation less than dL=1 mm - rejection criteria dL < 1 mm is correct. Number of rejected straws are N = 15 straws ( ~ 2 %) - combine criteria dL < 1 mm @ Load max F < 3.7 kG was tested too. Number of rejected straws are N = 35 straws ( ~ 4 %) 2 criteria and are tested and acceptable ------- Sefar straws: Straw sample elongation was not fixed during tensile test. So, straw rejection criteria can not be correctly tested. Elongation must be measure too. wrogn “soft” “hard” “soft” “hard” 1-May-18 S.Movchan Straw manufacturing and QC 17

S.Movchan Straw manufacturing and QC Conclusion Dubna 806 straws were manufactured (February-April 2011): ~ 20 straws/shift ~ 100 straws per spool (L=300 m). Efficiency of mylar tape used is about 90% Straw parameters: - diameter Dav = 9.78 mm - sample elongation dLav= 7.0 mm (o-ring 5 mm width tensile test) - visible ultrasonic track width Wav=0.725 mm - resistance Rav=61.8 Ohm (L=2600 mm) Straws rejection: - out of parameter specification ~ 0.7% ( 6 straws) - dL < 1 mm @ Load max F < 3.7 kG ~ 4.3% (35 straws) (and data lost for 34 straws) Dubna straw quality is adequate to NA62 requirements 1-May-18 S.Movchan Straw manufacturing and QC 18

S.Movchan Straw manufacturing and QC NA62 straw modules assembly site 1-May-18 S.Movchan Straw manufacturing and QC 19

S.Movchan Straw manufacturing and QC Bld. 217: common view Entrance gate 1-May-18 S.Movchan Straw manufacturing and QC 20

Straw module 3 assembly halls Frame assembly Vacuum test Wiring Connectivity Gas tightness HV test Assembly Area Cosmic test 1-May-18 S.Movchan Straw manufacturing and QC 21

S.Movchan Straw manufacturing and QC 3 halls Crane: 1.0 tone height ~ 4.5 m S ~ 150 m2 ( 9 x 16.6 m) Condition system S ~ 50 m2 ( 5.4 x 9 m) 1-May-18 S.Movchan Straw manufacturing and QC 22

Module assembly tooling Support frame + scaffolding Module tilter Delivery - 20 September 1-May-18 S.Movchan Straw manufacturing and QC 23

Vacuum pump and pressure sensors for module tests 1-May-18 S.Movchan Straw manufacturing and QC 24

S.Movchan Straw manufacturing and QC Conclusion Dubna NA62 straw modules assembly halls (S ~ 250 m2) – ready Module assembly tooling delivery - 20 September Module assembly tooling installation at hall – Sept.-Oct. 2011 Vacuum pump and pressure sensors – ok! Vacuum table – tender started Due to Module-0 assembly is in progress: Manufacture straw assembly tooling – postpone 1-May-18 S.Movchan Straw manufacturing and QC 25