Collaborative Decision Making (CDM) Saulo Da Silva

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Information Management The ICAO Perspective
Continuous Climb Operations (CCO) Saulo Da Silva
International Civil Aviation Organization Performance Framework for Efficiency H. Sudarshan SIP/ASBU/2012 -WP/5 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization AIM - implementation Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Measurement of environmental benefits Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Environmental Management System Definitions
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau Agenda Item 1.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Dynamic wake turbulence separation Saulo da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
Performance Framework for Efficiency H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Economic issues Formulation of Business cases H. Sudarshan
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
System Wide Information Management
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Remotely-Piloted Aircraft Systems
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
COLLABORATIVE DECISION MAKING CONFERENCE
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Introduction of TBO within OptiFrame
Workshop on preparations for ANConf/12 − ASBU methodology
Measurement of environmental benefits Saulo Da Silva
AIM Operational Concept
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
OPTIFRAME : Project Overview
SIP/2012/ASBU/Nairobi-WP/7
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Global ATM Operational Concept
OptiFrame WP2: State-of-the-art and Stakeholders Expectations
Agenda Item 1 A Vision Based on Achievable Expectations Jack Howell Director / Air Navigation Bureau.
Workshop on preparations for ANConf/12 − ASBU methodology
Dynamic wake turbulence separation Saulo da Silva
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ANConf/12 – Agenda H. Sudarshan
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Descent Operations (CDO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Trajectory-Based Operations(TBO) Saulo Da Silva
Measurement of environmental benefits Saulo Da Silva
Aviation Innovation for Regional Integration
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Performance Framework Concept
Dynamic wake turbulence separation Saulo da Silva
Presentation transcript:

Collaborative Decision Making (CDM) Saulo Da Silva SIP/ASBU/2012-WP/22 Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, 21-25 May 2012)

ICAO SIP 2012 - ASBU workshops Objective Introduce the steps for the application of the CDM concept. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops Overview The need What is CDM Requirements Articulating a CDM process Development and operation Benefits ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops The need Global ATM Operational Concept evolution to a holistic, cooperative and collaborative decision-making environment expectations of the members of the ATM community would be balanced to achieve the best outcome based on equity and access. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops The need Come to an agreed vision on the expected results Ensure that everyone delivers their part of (their contribution to) the required performance Ensure that everyone uses a compatible approach, method and terminology Ensure that everyone’s data can be integrated and aggregated to calculate overall indicators and assess system performance at a higher aggregation level. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops What is CDM? A supporting process always applied to other activities such as Demand/Capacity Balancing It is not an objective but a way to reach the performance objectives of the processes it supports Allows all members of the ATM community to participate in ATM decisions that affect them Any member can propose a solution ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops What is CDM? Is not limited to any specific domain such as airport or En Route May apply to all layers of decision from longer-term planning activities through to real-time operations Requires pre-defined and agreed procedures and rules to ensure that collaborative decisions will be made expeditiously and equitably. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops What is CDM? Increase level of collaboration when commitment to implementation or understanding of needs has to be high. High decision value and complexity are clear pointers toward more collaboration. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops ATM Requirements Ensure that airspace users are included in all aspects of airspace management via the collaborative decision making process [R15] Manage all airspace, and where necessary, be responsible for amending priorities relating to access and equity that may have been established for particular volumes of airspace. Where such authority is exercised, it shall be subject to rules or procedures established through collaborative decision making [R18]  ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops ATM Requirements Establish a collaborative process to allow for efficient management of the air traffic flow through use of information on system wide air traffic flow, weather, and assets [ R112] Modify the airspace user’s preferred trajectory: when required to achieve overall ATM system performance requirements; and/or collaboratively with the airspace user, in a manner that recognizes the airspace user’s need for single-flight efficiencies [R203]. ICAO SIP 2012 - ASBU workshops

Articulating a CDM PROCESS Identification of: Actors – who is participating in the collaboration? Roles & responsibilities – what functions do the actors perform and how do they interact? Information requirements – description of requirements and standards imposed on information exchanged as part of the above interactions Making the Decision – how is a decision made? Rules – what are some rules constraining the behavior? ICAO SIP 2012 - ASBU workshops

Development and operation of a CDM Follows the following typical phases: CDM need identification CDM analysis CDM specification and verification CDM Performance Case CDM Implementation and validation CDM operation, maintenance and improvement (continuous) ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops CDM need identification Ability to influence performance in all 11 KPA Provides a mechanism specifically well-suited to addressing Access and Equity and Participation by the ATM Community frequently difficult to quantify. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops CDM analysis Should make clear what decisions are to be made Which community members are involved (or affected) Which information is used in support of taking the decision(s) Which process(es) are followed How and through which means the decision making process can be improved and How such an improvement could contribute to a better performance. ICAO SIP 2012 - ASBU workshops

CDM specification and verification The decisions to be taken, how they are reached and finalized The community members involved and their roles/responsibilities in the decision(s) Agreement on objectives (e.g., resolve congestion while minimizing impact to my operation) Decision making rules, processes and principles Information requirements including data standards, quality, frequency and deadlines. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops CDM Performance Case Justify the decision to implement the CDM process and to make the necessary investments It should clearly specify what the costs are and the benefits (in the relevant KPA’s) that will result from the operation of CDM. ICAO SIP 2012 - ASBU workshops

CDM Implementation and validation Includes all steps to bring CDM into operation Includes training and informing staff Implementation/adaptation of systems and information networks, etc. ICAO SIP 2012 - ASBU workshops

CDM operation, maintenance and improvement Continuous and shared review, maintenance and improvement process. ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops Areas of application ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops References Global ATM Operational Concept, ICAO Doc. 9854, 1st Edition 2005 Manual on Air Traffic Management System Requirements, ICAO Doc. 9882, 1st Edition 2007 Manual on Global Performance of the Air Navigation System, Part I – Global Performance and Part II- Performance-Based Transition Guidelines, ICAO Doc. 9883, 1st Edition 2008 Manual on Flight and Flow Information for a Collaborative Environment (FF-ICE), ICAO Doc 9965 CDM Manual (under review) ICAO SIP 2012 - ASBU workshops

ICAO SIP 2012 - ASBU workshops