I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014

Slides:



Advertisements
Similar presentations
LPA Time Extension Guidance. The Department will grant time extensions when Work on the critical path is delayed and impacts the completion date Contractor.
Advertisements

TRB BRT Workshop July 22, 2008 ECTP Project Oversight Grantee Perspective.
Project Management 6e..
Oklahoma Department of Transportation Susan McClune Regulatory Services.
1 Canyonero Parkway Cost Estimate Review Close out presentation October 5, 2007.
New York State Department of Transportation Kendrick Road Bridge Over I-390 Design-Build Project Request for Qualifications Informational Meeting June.
Simplified Risk Management Planning for A Risk Management Process Overview presentation, which should take about.
Alternative Project Delivery
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Project Cost Management Estimation Budget Cost Control
Determination of Construction Contract Duration for Public Projects in Saudi Arabia By: Ahmed Saleh Al-Sultan, June 1989 Presented by Sameh Elish January.
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Quiz#1 Chapter 5: Estimating Project Times and Cost
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
How RISKY Is This??. How RISKY is This?? Buy a lottery ticket Only 3 will be sold Cost for a ticket $80 million Jackpot $2,000,000,000 Where is the
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
2 Preliminary  Pre-Design & Design  Prior to Bid Letting  For funding allocation and bid comparison Final  Construction  Post Award  For contractor.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
PREPAREDBY: PREPARED BY: Ahmed Al Tayeb Saed Al Qeshawe Tareq Amen Abdalla Syiam SUPERVISED BY: Dr. Kamalain K. Shaat CHAPTER8: Application Of Controls.
Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
PROJECT MANAGEMENT TRACKING SCHEDULES Audrey Demeter, PE,PM Casey Unrath, EIT.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
OTC Pres: Bid & Award Phase 4 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Eryca McCartin, Office.
ECE2799 Project Management Prof. Mazumder Prof. Bitar Updated 3/18/2016.
Freight Forum RTC Washoe March 31 st, The reliable, cost effective, and safe movement of goods and products across the State of Nevada and.
Project Management 6e..
Project Management 6e..
Estimating Project Times and Costs
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
2016 SAME Small Business Conference - Atlanta
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Estimating Project Times and Costs
Transportation Conference Jason Voigt, P.E., NDOT Resident Engineer
Procuring Professional Services
The Alabama Transportation Rehabilitation and Improvement Program
CSP 25th November 2010 Technical agreement number 3: overview
Interstate 15 North Phase 4 8/19/2015 Update
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Construction Project Management
Total Reinforcment Solution “So you can work on something else”
Construction Project Management
Estimating Project Times and Costs
Phase 2 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
Estimating Project Times and Costs
Phase 3 Tollgate Review Discussion Template
Phase 2 Tollgate Review Discussion Template
Phase 1 Tollgate Review Discussion Template
Phase 3 Tollgate Review Discussion Template
System Development Life Cycle
Budgeting: Estimating Costs and Risks
External Independent Review (EIR)
ERE653 Final Project Saratoga State Parks Comfort Station
Proposed Budget for FY10 – FY12 December 10, 2009
Project management Lecture 9
CIS12-3 IT Project Management
Phase 2 Tollgate Review Discussion Template
Construction Projects
Resource Planning, Cost Estimation and Budgeting
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Cost Containment Working Group June 20, 2018
FlexFile 101 MARCH 2019.
Conventional Facilities
Estimating Projects Estimating Types of Estimates
Estimating Project Times and Costs
Chapter 2 – Review ‘construction management’
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Where We Are Now. Where We Are Now Estimating Projects Estimating Types of Estimates The process of forecasting or approximating the time and cost.
Design and Engineering Services
Presentation transcript:

I-15 North Phase 4 Preliminary DRAFT CRA Results July 2014

Contents of this Presentation Base Schedule (Flowchart) Base Schedule by Flowchart Activity Base Cost with Uncertainty by Flowchart Activity Allocated Overhead Escalation Assumptions Risk Register Count Risk Analysis Results S-Curve Project Cost 70th Percentile Risk Profile – Stacked Bar Top Cost Risks – Tornado Chart S-Curve Completion Date Top Schedule Risks – Tornado Chart

Base Schedule

Base Schedule by Flowchart Activity Activity ID Activity Start Date End Date Duration 400 Phase 4 Preliminary Engineering - Scoping 10/1/14 3/31/15 5.98 410 Phase 4 Environmental Re-Evaluation 4/1/15 3/31/16 12.02 420 Phase 4 Right-of-Way / Utilities 4/1/16 12/31/17 21.03 425 UPRR Railroad Coordination 430 Phase 4 Final Design 33.05 440 Phase 4 Construction 1/1/18 12/31/21 48.00

Base Cost with Uncertainty by Flowchart Activity Activity ID Activity Total (CN + CE + PE + ROW) Low Base High 400 Phase 4 Preliminary Engineering - Scoping $1,900,000 $2,000,000 $2,200,000 410 Phase 4 Environmental Re-Evaluation $0 420 Phase 4 Right-of-Way / Utilities $2,495,000 $2,775,000 $3,055,000 425 UPRR Railroad Coordination $90,000 $100,000 $120,000 430 Phase 4 Final Design $9,849,184 $11,674,076 $13,305,322 440 Phase 4 Construction $142,043,332 $168,331,329 $191,832,488   Total $156,377,516 $184,880,405 $210,512,810

I-15 North (Phase 4) Allocated Overhead Support Costs per Month of Calendar Delay Activity Number Activity Name Agency Contractor Total 400 Phase 4 Preliminary Engineering - Scoping $166,667   430 Phase 4 Final Design $176,880 440 Phase 4 Construction $226,996 $259,424 $486,420

Escalation Assumptions Escalation Rates Year Construction PE ROW 2014 3.19% 3.41% 4.02% 2015 3.33% 2.96% 4.12% 2016 3.72% 2.83% 4.35% 2017 3.94% 2.73% 4.58% 2018 3.80% 3.13% 4.75% 2019 4.01% 2.90% 4.83% 2020 4.05% 2.75% 5.28% 2021 4.28% 4.11% 2022 + 4.51% 2.74% 2.94% Note: Escalation forecasts were developed utilizing a combination of national and Nevada data. Forecasts for Engineering were based on the growth rate of civil engineering salaries, ROW on the change in real estate prices, and Construction on changes in various materials and construction labor indices, such as, concrete, steel, asphalt, and machinery.

I-15 North (Phase 4) Risk Register Count NDOT RBS Category I-15 North (Phase 4) Active Inactive Retired Total Environmental & Hydraulics 5 2 7 Right-of-Way 4 Utilities 1 Design / PS&E 6 14 Structures & Geotech Railroad Partnerships and Stakeholders Management / Funding Contracting and Procurement 3 Construction 30 13 44

I-15 North (Phase 4) Risk Analysis Results

I-15 North (Phase 4) Risk Analysis Results

I-15 North (Phase 4) Risk Analysis Results

I-15 North (Phase 4) Risk Analysis Results

I-15 North (Phase 4) Risk Analysis Results