PBN Performance Based Navigation

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
Copyright 2006 EUROCONTROL1 PBN Performance Based Navigation - Implementation Challenges - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium.
Navigation Applications perspective on ADQ
International Flight Inspection Symposium
PUBLIC PROTECTION AND ETHICAL GEOSPATIAL DATA DISSEMINATION AN INITIATIVE OF GEOIDE (PROJECT IV-23) Legal aspect related to aeronautical information Pascale.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
Flight Validation of Instrument Flight Procedures
NextGen GA Fund, LLC A Fund to Accelerate NextGen Equipage Benefits for the General Aviation Operator Community.
Flight Validation and Pilot Training
Applications from packages I to III
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
PBN OVERSIGHT IN AUSTRALIA
Applying Innovation Dubai Airport Show 2015 – Innovation podium Tuesday 12 March 2015, Session 1, 10:15 – 10:45 Laurent Delétraz.
PBN Airspace Concept Process
Area Nav: RNP Evolution
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Computerised Air Traffic Management Tools - Benefits and Limitations OMAR BASHIR (March 2005)
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
Briefer: John Charles Angermayer Briefer: John Charles AngermayerESC/GA Electronic Systems Center Hanscom AFB, MA Date: 5 Oct 2004 Date: 5 Oct 2004 Briefer:
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
ICAO-AFPP Quality Assurance for Instrument Flight Procedure Implementation. (Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P. 1.
Overview of the PBN Airspace Implementation Processes
ATS Route and Waypoint Implementation:
FAA NAVAID Rationalization / Resiliency Overview
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
Modernising the System
Introduction to Navigation Specifications
PBN OVERSIGHT IN AUSTRALIA
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Overview of Continental En-route Navigation Specifications
Workshop on preparations for ANConf/12 − ASBU methodology
Airline PBN Operations & Desired Entry Competency
(Nairobi, Kenya, 3-6 Nov, 2015) By Chinyama, P.
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
PBN Performance Based Navigation
Performance Based Navigation: Navigation Specifications
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
4 - 8 November 2013 AIM relevant - Assembly conclusions
Workshop on preparations for ANConf/12 − ASBU methodology
ATSEP training - general SJCS Latvijas Gaisa Satiksme (LGS) Latvia
SVY207: Lecture 16 GPS Field Procedures and Computations
Oceanic and International Operations
Basics of RNP.
Trajectory-Based Operations(TBO) Saulo Da Silva
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
ASEAN PBN Routes Objectives:
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV and RNP Strategy in Japan
Oceanic and International Operations
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
ICAO PBN Symposium Regulatory and Certification Forum
AIS Manual (Doc 8126) Air Navigation Procedures for AIM Seminar
ICAO SAM PANS AIM Seminar Data Quality – Jeppesen Perspective Lima, Peru November 2018 John Moore, Jeppesen, Industry Relations & Standards Good afternoon.
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
1 Ranjan Senaratne. After studying this session, you will be able to: Explain the responsibilities of the AIS. Identify the users of Aeronautical Information.
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Aerodrome Certification Workshop
Presentation transcript:

PBN Performance Based Navigation Implementation Challenges - ICAO Performance Symposium March 2007 Federal Aviation Administration Presented by: Lex Hendriks, EUROCONTROL Copyright 2006 EUROCONTROL

Overview Safety Case Why needed Application to PBN Data integrity WGS 84 Surveying Maintaining data quality

Safety Cases - When and Why When a significant change is going to be made to and operation, service and/or system To confirm that the resulting system: Is safe Can Remain safe and Can be implemented safely

Safety Assessment Considerations (1) Aircraft Performance Normal performance: Lateral accuracy - navigation specifications Non-Normal Performance: RNAV system failures, “blunder” errors e.g. wrong route selection Are single systems allowed – what happens if it fails Is RNP required – if not how to detect position errors? Identify mitigations e.g. Crew procedure and training, Surveillance or additional separation.

Safety Assessment Considerations (2) Infrastructure Navigation aids impact of failure Single Navaid – eg DME Loss of GNSS over large area (eg Jamming) Mitigations Radar Increased separation Requirement for carriage of backup

Safety Assessment Considerations (3) Infrastructure – Comms, Surveillance. Important factor determining route spacing Consider Coverage Redundancy Effectivity ATC Workload Nature of comms

Overview Safety Case Why needed Application to PBN Data integrity WGS 84 Surveying Maintaining data quality

The Problem Identified ANSP (AIS) DB Providers Aircraft Operators AIP ADB/DB If unclear or ambiguous procedure description Aircraft fly different tracks Lack of Integrity

Example of Data Coding NAV32516.3617

Example of Data Coding NAV32516.3618

An Example of a Chart Error ? .5 .5 .4 .4 .3 .3 .2 .2 .1 .1 .0 50º 31’.0

Tailoring Requirements Who is Involved? Communications Service Provider Aerodrome Air Traffic Procedure & Airspace Designer Aeronautical Information End Users NOTAM AIP FMS Data Applications Flight Planning End Users Simulator Navigation Data Tailoring Requirements Navigation Data Processor Other Government Sources RNVREQ_1097

Navigation Data Process Collect Process Publish Distribute Basic Data Sources Users Every player must establish a Navigation Data Process in order to ensure the quality of data delivered to the users RNVREQ_1101

Data Chain Processes and Standards Origination Derive and Publish eg States’ AIPs State’s Responsibility Preparation by Data Service Provider Receive Assemble Translate Select Format Distribute DO-201A/ED-77 Application Integration Link to target equipment in required format DO-200A/ED-76 End Use Load and Maintain current cycle DO-200A/ED-76 DO-178B/ED-12B JARs

Data Exchange after Publication in AIC Jeppesen - DE EAG - UK Jeppesen - US Data Houses Lufthansa Systems - CH FMS Packed Data CMC Canada Rockwell Garmin Smiths Honeywell Data Packers Compiled Data

What is Data Quality? Quality is ability to meet requirements Characterised by: Accuracy Resolution Assurance Level Traceability Timeliness Completeness Format RNVREQ_1100

Managing Data What is Data Integrity? Exchange The assurance that a data item retrieved from a storage system has not been changed since the original data entry or latest authorised amendment Data Same? Data RS56869_1005

ICAO Requirements Critical (10-8) Essential (10-5) Data Routine (10-3) User requirements in ICAO Annex 15 Critical (10-8) Essential (10-5) Data Routine (10-3) RS56869_1006

Some Specific Requirements Data Configuration Management – know data origin and what has happened to it during its life Software Tools Qualification – Tools validated to ensure they do what they should do Quality Management – well defined procedures capable of ensuring quality Compliance – do what the quality procedures require Audit – demonstrate that they have been used RNVREQ_1104

Issues to be Addressed Survey – does it meet accuracy and integrity requirements Is there means to guarantee that data not corrupted RNAV coding – has the data house correctly interpreted the design? Traceability – can you validate to confirm whether process working RNVREQ_1105

Global Geodetic System Only accurate to 1-2 Metres WGS 84 Global Geodetic System Only accurate to 1-2 Metres International Terrestrial Reference System (ITRS) Precise geodetic system : 1-3 cm over 5,000 km Maintained by the International Earth Rotation Service Addresses Plate Tectonic movements. ITRF – globally distributed network with defined epoch (date), position and velocity

How to survey GPS Observation Techniques Connection to the geodetic reference frame Stations with defined ITRF coordinates Control Stations clear line of sight away ensure no interference Redundancy of data collection to allow validation Hardware selection – e.g. impact of mixed receiver network – antenna phase centre differences etc. Survey Marking

Surveys What to Survey Survey Survey 20

Surveys How to mark (Monumentation)

AFN/NAV/DAT/ORG/DOC001-150404 Data Origination EUROCONTROL Guidance Material Integrity of Aeronautical Information - Aeronautical Data Origination AFN/NAV/DAT/ORG/DOC001-150404 Survey and procedure Design Requirements FAA Guidance Material FAA Specification 405 Standards for Aeronautical Surveys and Related Products FAA Order 8260.19 Flight Procedures and Airspace

Requirements Addressed Survey –WGS84 Training for designers Software Tool Qualification Data management Quality Assurance Verification of Procedure Designs Publication Validation tests Flyabilty – under range of wind conditions for appropriate aircraft types Navigation aid coverage