planning and zoning committee presentation September 19, 2016

Slides:



Advertisements
Similar presentations
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Advertisements

January 23, 2006 FAIRFAX COUNTY PEDESTRIAN TASK FORCE FAIRFAX COUNTY PEDESTRIAN TASK FORCE FINAL REPORT.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
What’s Happening? What’s happening in Tysons? A lot!
Planning & Community Development Department East Green Street Predevelopment Plan Review City Council Meeting November 4, 2013.
Public Hearing June 4, Case: CDR Project: Winegard Road South PD LUP - Substantial Change Applicant: Hugh M. Lokey, P.E., Hugh M. Lokey.
Twinbrook Sector Plan A New Community in the Technology Corridor
Twin Cities Case Study: Northstar Corridor. ●By 2030, region expected to grow by nearly 1 million, with 91% to 95% of new growth forecast to be located.
TRANSPORTATION CORRIDOR OVERLAY DISTRICT ROUTE 29.
Pacoima Town Center UP 273 Fall 2008 Lauren Ahkiam, Matthew Parrent, Beverly Wong, Nally Guo, Carlos Morales.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Comprehensive Plan for Tysons Corner 1. 2 Land Use Categories 1.Transit Station Mixed Use: the overall percentage of office uses throughout all of the.
Indian Trail Town Council Planning Board January 17, 2012.
1 RTD TOD Program University of Denver November 2004.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Study for the Community of Winchester May 21, 2012.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Land Market Monitoring: Beyond Land Supply Gerrit-Jan Knaap Professor and Director National Center for Smart Growth Research and Education University of.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Land Use Study for the Community of Winchester July 9, 2012.
September 24,  Preliminary Development Plan  Location: North side of NW 39 th Avenue in the 8300 to 9099 block  Zoning Districts: R1-B, HM, PD,
Planning & Community Development Department 277 North El Molino Avenue Predevelopment Plan Review City Council Meeting May 5, 2014.
JAMESBURG, NEW JERSEY Edward J. Bloustein School of Planning and Public Policy.
Tools for a Transit Oriented Community Mt. Lebanon From Plan to Practice.
Planning & Community Development Department 1336 and 1347 East Colorado Blvd. Pre Development Plan Review City Council Meeting January 28, 2013.
The Dulles Corridor 1. Wiehle Avenue 2 Joint development - Fairfax County and Comstock 3.5 acre Comstock parcel and 9.0 acre County parcel Mixed-use,
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
County of Fairfax, Virginia 11 Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee September 17,
County of Fairfax, Virginia Department of Transportation VDRPT Route 1 Multimodal Alternatives Analysis: Recommendations for Next Steps Board Transportation.
County of Fairfax, Virginia Department of Transportation Urban Street Standards Progress Report Board of Supervisors Transportation Committee December.
Request: rezone 32 acres from PD-OP (Office Park) to R-16 (Residential) & PD-CC-CC (Commercial Center) – 128 multifamily units & 260,000 sf retail and.
Board of County Commissioners Second Public Hearing August 10, /10/
Railroad Ave eBART Station Area Specific Plan TOD MarketPlace, September 29, 2006 C I T Y O F P I T T S B U R G.
SITE. ZOM CPA ZOM R-1B R-1A PD A A.
July 13, 2010 Board of County Commission Transmittal Hearing.
1 Regional Activity Centers and Clusters Presentation to National Capital Region Transportation Planning Board Paul DesJardin Department of Human Services,
County of Fairfax, Virginia Dulles Corridor Air Rights Study Investigation Fairfax County Board of Supervisors Transportation Committee December 10, 2013.
OLDE TOWN ARVADA TOD Update to RTD Board September 3, 2013
EASTSIDE ACTIVITY CENTER DRAFT MASTER PLAN Board of County Commissioners January 22, 2008.
1 Temporary Construction Staging Area Licensing Agreement for Peabody Hotel April 1, 2008 Orange County Convention Center.
County of Fairfax, Virginia Policy on Level of Service in Activity Centers Board Transportation Committee December 17, 2013 Department of Transportation.
EASTSIDE ACTIVITY CENTER MASTER PLAN PROPOSED COMPREHENSIVE PLAN AMENDMENT CPA Board of County Commissioners Hearing May 13, 2008.
The Concept for City Center – The Power of TOD TOD Advisory Committee Meeting 3 December 10, 2009 The Premier Place for a Premier City.
Prepared by: Alex Fisch Planning Services Division.
site analysis A2D2 Zoning Changes “Core Downtown” D1 District Assumed 180’ Height Limit 400% FAR 700% FAR with premiums - Green construction - Parking.
DeSoto Hampton Corridor Revitalization Overview of Mixed Use Development.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
G & A Lloyd, LLC ZOM Location Map. G & A Lloyd, LLC ZOM Aerial.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission Design Recommendation LU MS Conway’s NW.
ULI Presentation – Shifting Suburbs OLDE TOWN ARVADA TOD August 29, 2013.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
County of Fairfax, Virginia Department of Transportation Update on Transportation Activities in Fairfax County Transportation Roundtable Dulles Area Transportation.
1 Villa Laguna MXD3 Site Plan Review. 2 Request: The applicant is requesting site plan review of a proposed mixed-use project pursuant to the recently.
Council for Quality Growth North Fulton Advisory Meeting
Ashita Gala & Augustus Haney Seaport City Zoning Proposal
Plan Goals: Improve walkability and pedestrian safety Preserve and celebrate neighborhood character and sense of place Address code violations Improve.
CFT Gateway Center ( E. Foothill Blvd
Harrison Community Center - October 12, 2017
Gateway Specific Plan Concepts
Bonanza Park Area Plan and Form-Based Code
Marina Del Palma Comprehensive Plan & Zoning Map Amendment
Valley & Third Streets Redevelopment
Emeryville Marketplace is a 14-acre mixed-use commercial and residential development located at the eastern terminus of the Bay Bridge in the small city.
July 20, 2015.
ROOSEVELT CITY GENERAL PLAN 2010
Next Steps for Urban Street Standards
Proposed City of Wenatchee Comp Plan Update: Impact on Olds Station
2016 Longview comprehensive plan update
New Urbanism Concepts for Community Redevelopment Nicholas Zaferatos
Presentation transcript:

planning and zoning committee presentation September 19, 2016 Reston crescent planning and zoning committee presentation September 19, 2016

Property overview

property overview Approximately 36 acres. Located in the Reston Town Center Station Transit-Oriented Development District. Zoned I-4, Medium Intensity Industrial (.70 FAR). 1,109,608 SF of office approved; 386,000 existing and to remain.

existing conditions existing ingress/egress

Comprehensive Plan recommendations “Transit Station Mixed-Use”, with FAR between 2.0 and 3.0, with urban design. Key elements for the area include the introduction of new streets to provide a more grid-like pattern to the road network. New urban parks and a well-connected public open space network are also encouraged.

Proximity to metro

Proposed Development Total of 3.88 million square feet of development (PDC). RESIDENTIAL – 2,546,578 SF (2,260 units) OFFICE – 1,180,555 SF RETAIL - 63,979 SF HOTEL (OPTIONAL) - 89,790 SF The proposed FAR is 2.45, with an effective FAR of 2.2 when Workforce Dwelling Units are considered. Five distinct parks and open spaces ranging in size, function and tone.

street network

illustrative plan

use plan

pedestrian and bike circulation

landscape plan Park Corniche

CRESCENT PARK 55,000 SF

gateway plaza

triangle park

multi-use rec park

streetscapes

streetscapes

streetscapes

sections

sections

sections

sections

massing

massing

massing

massing

transportation TIA submitted to VDOT and FCDOT for review (ongoing). Reston Network Analysis to evaluate local and regional improvements to address key intersections: Sunrise Valley Drive and Reston Parkway Sunrise Valley Drive and Fairfax County Parkway Soapstone Drive Connector Town Center Parkway underpass Streetscape improvements along Sunrise Valley Drive and Reston Parkway under review. Onsite grid constructed concurrent with development.

planning and zoning committee presentation September 19, 2016 Reston crescent planning and zoning committee presentation September 19, 2016