Mandate Priorities Other tasks Membership Forthcoming reports to CTC

Slides:



Advertisements
Similar presentations
Lau Gatignon / CERN for MDI team. MDI is very different between ILC and CLIC:  Organization wise (ILC in experiments, CLIC on machine side)  QD0 technology.
Advertisements

Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
Hybrid QD0 Studies M. Modena CERN Acknowledgments: CERN TE-MSC CLIC Magnets Study Team: A.Aloev, E. Solodko, P.Thonet, A.Vorozhtsov “CLIC/ILC QD0” Meeting.
H IGH L UMINOSITY LHC WP1 - CERN S AFETY R EQUIREMENTS Stefan Roesler - Phillip Santos Silva – Ralf Trant EDMS# HSE Unit April 2011.
Machine Detector Interface for the HL (MDI) CERN, April 15, 2011 Austin Ball, Helmut Burkhardt, Marzio Nessi.
Machine Detector Interface Lau Gatignon / CERN-EN.
Our way to the CLIC CDR 1.Definition of CDR and TDR 2.CLIC feasibility items 3.Organization of technical preparation - CTC (=CLIC technical committee)
1 M. Modena for the CLIC MDI magnet study Team (A. Aloev, P. Thonet, E. Solodko, A. Vorozhtsov) CLIC MDI Meeting,16 January 2015.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Beam Physics Work D.S List of Workpackages Area packages Main beam electron source (Steffen Doebert) Main beam positron source (Steffen.
About L* i.e. the distance between the end of the last quadrupole “QD0” and the IP Until now, L* has been different for SiD and ILD, -> due to detector.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1http:// 22/4/2010 Introduction WG4 Outline: Mandate of the WG Timescale How to proceed? Vertex detector requirements Collecting input on.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Recommendations on the scientific programme The PAC endorsed the main lines of the proposed long-term programme. The draft document is expected.
Agenda : CLIC Civil Engineering and Services (CES) WG.
Draft MDI Action plan Presented by Lau Gatignon 25 September 2009.
First calculations of the CLIC Antisolenoid system A. Bartalesi, M. Modena - CERN.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
E. GschwendtnerMDI, 18 Feb Post-Collision Line and Dumps Working Group The PCLD Working Group shall co-ordinate the design and experimental work.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Our way to the CLIC CDR 1.Basic Concepts of the CLIC CDR Present layout of the CDR chapters 2.Possible Time Scale 3.Organization of technical preparation.
MDI towards technical design Lau Gatignon. Very preliminary ! To trigger discussions.
MDI Status and Plans Lau Gatignon / EN-MEF On behalf of the MDI working group.
Introdcution to Workpackage/Activity Reflection D. Schulte.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
MDI Action plan Presented by Lau Gatignon 6 October 2009.
8/12/2010Dominik Dannheim, Lucie Linssen1 Conceptual layout drawings of the CLIC vertex detector and First engineering studies of a pixel access/insertion.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
ATLAS Forward Project (AFP) Technical review outcome Review done on (morning) September 2013, see agenda
O. Kester, NuSTAR annual meeting, 27/02/2013
HL-LHC Review of WP 1 Lucio Rossi – CERN 3rd general meeting for application 20 October 2010.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
CTC Work Packages ver 2.1 HS for CTC. CTC-001SC wigglers Cooling design, hor. or ver. Racetrack coil Nb3Sn or NbTi cable Prototypes construction Experimental.
Summary of IAP comments from 2007 EURISOL Town Meeting
FCC-ee Interaction Region design
Machine Detector Interface
CLIC module working group
CLIC / ILC Collaboration for CFS works
Beam Delivery Systems and the Machine-Detector Interface Terms of Reference for the CLIC-ILC Collaboration Working Group B. Parker (BNL), D. Schulte.
Layout of Detectors for CLIC
M.Jonker CTC MPO-WG status
CLIC detector at SiD meeting 28/3/2010
CLIC Study Aim Conceptual design report in 2010
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Upgrade Strategy for the Experimental Vacuum Systems
CLIC-ILC BDS & MDI work.
MACHINE DETECTOR INTERFACE WORKING GROUP STATUS
SCU Next Phase Meeting July 8, 2014.
CLIC Detector CERN Status + plans
Andrei Seryi Materials for discussion TILC-08
Interaction Region Design Options e+e- Factories Workshop
CLIC damping rings working plan towards the CDR
Summary of Washington DOE Review
Crab Crossing Named #1 common technical risk (p. 6 of the report)
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Presentation transcript:

Mandate Priorities Other tasks Membership Forthcoming reports to CTC The MDI Working Group Mandate Priorities Other tasks Membership Forthcoming reports to CTC Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities Role of the MDI The MDI is the part of the CLIC facility (approximately) inside the detector cavern, i.e. the area in which there is a strong coupling of technical subsystems of the machine and of the physics detectors. The lines for the spent beams shall also be considered part of the MDI. Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities In general the CLIC Machine Detector Interface (MDI) Working Group shall provide a meeting forum between people working on the CLIC accelerator and people working on the CLIC physics detectors. For this purpose the WG shall have permanent members from both study teams. For certain subjects of more general interest the WG shall propose speakers for CLIC Friday meetings or the LCD meetings. The MDI working group shall oversee the detailed technical work needed for the conceptual design (CDR) of the MDI until end 2010 and later for the detailed technical design phase (TDR). The MDI WG is responsible for documenting the concept of the accelerator components in the CDR write-up. Some of the technical work shall be elaborated within the MDI WG, but most results will be obtained in other WGs (beam dynamics WG, LCD, CES WG, Stabilization WG) The MDI WG reports to the CTC and to LCD. Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities Highest priority for the work until end 2010 are those subjects linked to the “CLIC critical feasibility items”, nota bene: Choice of the magnet technology for the FF magnets Integration of these magnets into the detectors, and their alignment Feasibility study of sub-nm active stabilization of these magnets Luminosity instrumentation Spent beam disposal Beam background backsplash from the post-collision collimators and dumps into the detector Intrapulse-Beam feedback systems in the interface region The MDI WG shall respond to the cost WG on request. Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities Examples of further items that will be discussed in the MDI WG: Issues where the beam delivery system (BDS) influences the beam/background conditions for the detector Issues where the BDS physically impacts on the detector Beam background and its impact on the forward (det.+accel.) elements, including backsplash of background particles from one hardware element to the surrounding elements Beam pipe, beam vacuum and vacuum infrastructure in the interface region Radiation environment and radiation shielding in the interface region Cryogenic operational safety issues in the interface region Magnetic environment in the interface region (shielding of FF quadrupole, correction coils, anti(-DID), stray fields from the detector, etc.) Overall mechanical integration (including the routing of services) in the interface region Pull-push elements and scenarios (detector-to-detector interface) Cavern layout and services (handled principally under CES WG) Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities

MDI - Mandate, members, priorities ORGANISATION: Typically I propose to have a full meeting every month, If necessary additional meetings in case those are needed to meet specific deadlines. Occasionally restricted meetings could be organised with working group leaders, in particular if these deadlines concern resources. The next deadline is a report to the CTC on what can be achieved and what cannot be done for the CDR with the resources availabe and what extra resources are required. Report on October 6th. For that reason I propose to have a next MDI meeting in the second half of September, e.g. Friday 25th of September 14 PM? Lau Gatignon, 27-08-2009 MDI - Mandate, members, priorities