by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison

Slides:



Advertisements
Similar presentations
Presenters Scott Gaudineer, Program Executive Caldwell Flores Winters
Advertisements

1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
Effectively Structuring and Managing Design- Build Projects Timothy John Murphy and Jason J. Annibale Wednesday November 25, 2009.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
A Match made in Heaven? Connecting you with a builder.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
Construction Engineering 221 Drawings and Specifications.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
Procurement and Construction Management and Oversight What Board Members Need to Know Jerry Smiley, AICP 24 July 2013.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Construction Contracts and Project Delivery Methods
TOPIC-9- PROJECT ORGANIZATION
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Agency Construction Management :CM NOT AT-RISK
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
TOPIC-9- PROJECT ORGANIZATION
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
UTILIZING CONSTRUCTION MANAGER AT RISK IN GREENSBORO, NORTH CAROLINA.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
BCN 4708 Fall 2008 Chapter 1 The Construction Industry.
The Design/Build Contract. What Is A Design/Build Contract? Contract that combines design & construction into one agreement The design/build team provides.
CAPITAL PROJECT DELIVERY METHODS APRIL 20, 2015 – SACUBO Annual Conference By Al Stoverink, AVC for Facilities Arkansas State University.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Project Delivery And The Changing Roles Of Contractors
PWGSC - KOREA 2nd JCC Meeting Canadian Federal Real Property Construction Contracting Presentation by Bruce Fletcher Director General – CASMS - PWGSC November.
CHANGING PROJECT DELIVERY SYSTEMS
Nepal administrative staff college
What Small and Emerging Contractors Need to Know Understanding the Basics of Contract Surety Bonds © Copyright 2016 NASBP.
2016 SAME Small Business Conference - Atlanta
What Small and Emerging Contractors Need to Know Introduction to Project Delivery Methods © Copyright 2017 NASBP.
Lease-Leaseback Project Delivery Method
What’s New in School Construction?
Contractor Review and Prequalification
NHCA Education Series Contractor Pre-Qualification CSST
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
9/18/2018 Bids CONTRACTING Khamis…..
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery Systems
Nepal administrative staff college
What Will You Learn 1. How To Plan Projects
Design-Bid-Build (Ch. 149) vs. Construction Manager at Risk (Ch. 149A)
PROJECT DELIVERY METHODS
Construction Project Delivery Methods
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Single Source PROJECT DELIVERY SYSTEMS: Engineer/Procure/Construct and Design-Build by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental Engineering Construction Engineering and Management Program Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Single Source Project Delivery System Outlines: Introduction and definition of terms Advantages and disadvantages to owners and contractors Importance of involving major specialty contractors and vendor up front in the project development Required conceptual designs and assemblies cost data Value engineering studies Prequlaification, proposal evaluation, and insurance and bonding Ⓒ Prof Awad S. Hanna

Traditional Method (Design_then _Build) Also known as design_bid_build or hard money or competitive bid contract. Has three sequential phase design - bid - construction. Architect-Engineer hired Architect- Engineer hired Bid/Award Design Phase Construction Phase Single Construction Contract Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Traditional Organization Owner A/E General Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor Sub Contractor The owner contracts separately with designer and a contractor Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Estimating Needs for Design-Bid-Build Complete set of drawings Specification Other contract documents General conditions Special conditions Addenda Others (soil report) Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Single Source Delivery 1. Design Build 2.Engineer/Procure/Construct (EPC) EPC model#1 ( CM agency “pure” ) EPC model#2 ( CM at Risk ) Other Multiple prime contractors Owner design construct Integrated teams or strategic alliance Design-Build-Finance and Design-Build-Develop Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Fast Track or Phased Construction Method CM and A/E or DB hired Concepts Working Drawing Design Phase Construction Phase Variable separate construction contracts Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Level of Influence Time Project Cost Influence Ability to Influence Ⓒ Prof Awad S. Hanna Prof Awad Hanna

1. Design Build Owner Design-build entity Own force Subcontractors work Single firm performs both design and construction under single design-build contract. Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Advantages of Design & Build for Owners Owner only has to communicate with one entity for the entire project Total project duration can be reduced because phased construction is easier to implement,(Fast tracking) Integration of construction planning and design phases Claims reduction (reduction of adversary relationships) Innovation in design and construction can be encouraged Risk assigned to party best able to manage that risk Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Disadvantages of DB for Owners Fewer checks and balances, owner must rely on integrity of the design-build firm All your eggs in one basket Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Advantages to a design-build organization Improved constructibility through design/construction integration A specialized organization can be developed that has a specific expertise which will be attractive to specific market areas Reduction of negligence claims between the Architect/Engineer and the construction contractor since they are under one umbrella firm Ability to react rapidly to change in scope Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Disadvantages for the design-build firm Acceptance of additional project risk Scope of work changes can be difficult to identify under DB/ fast track construction Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Summary of average differences between project delivery systems (CII-133) Ⓒ Prof Awad S. Hanna

Importance of Involving Specialty Contractors up front in the Project Development Specialty works represent 60% to 70% of the project cost Specialty works control the pace of construction Integration of electrical and mechanical systems early in the design stage Specialty works are labor intensive (high risk for cost overrun) Ⓒ Prof Awad S. Hanna

2. Engineer/Procure/Construct Model#1 (EPC) Pure CM (CM agency) Owner In-House Design or Engr. Firm CM Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #1 Ⓒ Prof Awad S. Hanna Prof Awad Hanna

2. Engineer/Procure/Construct Model#2 (CM at Risk) General Contractor acting as CM Owner Engineering/Procure Construct Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor Specialty Contractors and Vendor EPC Model #2 Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Estimating Needs for Single Source Delivery Conceptual Design General idea about the proposed quality Assemblies cost data Update your estimate as the design develops Value engineering studies Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Value-Engineering Study Ⓒ Prof Awad S. Hanna

Required Conceptual Design and Assembly Cost Data Example of assembly cost data Ⓒ Prof Awad S. Hanna

Design-Build Issues 1. Prequalification The reduction of the number of possible bidders to a small group of serious, qualified bidders improves the effectiveness of the selection process. Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Design-Build Issues (cont.) 2. Proposal Evaluation Cost only Cost and time Multiparameter (quality, safety…etc.) Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Design-Build Issues (cont.) 3. Legal a. Insurance and bonding The contractor should have the proper insurance to cover design deficiencies or cover construction errors. b. Conflict of interest Design-build eliminates the checks and balance of the traditional methods. Ⓒ Prof Awad S. Hanna Prof Awad Hanna

Critical Success Factors for Design-Build Project team selection; Pre-qualification of contractors; Level of design complete prior to engaging construction team; Individual experience of team members with similar facility type; Individual experience of team members with the project delivery systems; Team’s prior experience as a unit; Project team communication; Owner type (public or private); Owner/project team relationship (first time, partnering or repeat); Owner’s ability to define the project scope; Project complexity; Ⓒ Prof Awad S. Hanna