CCSDS Security Credentials Blue Book

Slides:



Advertisements
Similar presentations
MOSS 2007 Document Management Adam McCarthy 1 st April 2009.
Advertisements

CCSDS Security Working Group Spring 2014 Meeting 10 November – 13 November 2014 London, England Okechukwu Mezu, Charles Sheehe NASA/Glenn.
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
CCSDS IPsec Compatibility Testing
CCSDS IPsec Compatibility Testing 10/28/2013 OKECHUKWU MEZU CHARLES SHEEHE CCSDS GRC POC.
Reviewing Technical Papers Online Information for Paper Reviewers.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/SPARTA (a Parsons Company) April.
Project CIM Test Development Process Author Name John Simmins Weekly Status and Planning Meeting 1/25/2011.
Lean & Green Overview: Month One Day 1: Get Your Feet Wet – Overview Both Lean and Green Wastes – Project Charter Training and Outline – In Class: Draft.
© 2015 TM Forum | 1 V V2.2 Step 1: Setting to Review Publishing in Confluence.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
Security WG: Status Briefing Noordwijkerhout, The Netherlands) 31 March 2014 Howard Weiss NASA/JPL/PARSONS
Day 3 in the pmProject Management Project Management (PM) ADJUST.
NDIA PMCS May Rosslyn, VA Earned Value Management System Acceptance Working Group Buddy Everage Working Group Lead.
1 CCSDS Security Working Group Spring 2014 Meeting 31 March – 1 April 2014 Noordwijkerhout, The Netherlands Howard Weiss NASA/JPL/PARSONS* Identity crisis:
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
Security WG: Status Briefing BSI, London UK 10 November 2014 Howard Weiss NASA/JPL/PARSONS
Security WG: Report of the Spring 2014 Meeting NH Hotel Leeuwenhorst Noordwijkerhout, The Netherlands 3 April 2014 Howard Weiss NASA/JPL/PARSONS
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
CCSDS IPsec Compatibility Testing 05/4/2016 CHARLES SHEEHE, CCSDS GRC POC OKECHUKWU MEZU, Test Engineer 1.
Security WG: Report of the Spring 2004 Meeting May 13, 2004 Howard Weiss, NASA/JPL/SPARTA.
IPDA Standards Identification Project - Report B Gopala Krishna Elizabeth Rye Dan Crichton Steve Hughes Dave Heather Navita Thakkar.
Security WG: Status Briefing Cleveland, Ohio USA 15 October, 2012 Howard Weiss NASA/JPL/SPARTA skype: hsweiss.
CCSDS IPsec Compatibility Testing
CCSDS USLP Activities April 2016
The CCSDS Security WG is chartered to:
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
SOIS Area Report Wireless WG Primary Objectives for the fall meeting
Security WG: Status Briefing
Colorado Springs, CO, USA, 24 April 2009 Deputy – David Giaretta
Network Layer Security Update
CCSDS Systems Engineering Area: Security Working Group
Security WG: Report of the Spring 2016 Meeting
Physical Layer Security
CCSDS IPsec Compatibility Testing
CCSDS Physical Layer Security White Paper
Inputs Outputs Tools and Techniques.
Security WG: Report of the Fall 2013 Meeting
Delta-DOR WG: Report of the Fall 2010 Meeting
Concept of ACSF TAN (Type Approval Number)
Aligning for sustainability: Making the most of your resources
Implementation Strategy July 2002
SDLS Protocol Green Book initiation
SPACECRAFT ONBOARD INTERFACES SERVICES
CCSDS Navigation Working Group
eSCRIBE Contributor Training
SPACE LINK AREA MID-TERM REPORT
NASA Independent Reviews -Lessons Learned-
Website Content Management System
Registration Process for new messages
Fast Track Maintenance Process (for existing messages)
WGISS Working Group for Information Systems & Services
EVOSS Walkthrough.
Special Education Maintenance of Effort
Submitting to a subscription-based journal
E-Lock ProSigner ProSigner means “Professional Signer” signifying the software that can apply legally enforceable Advanced electronic signatures to electronic.
Classified IT EvalS Flow Chart
Privacy Requirements and HSPD-12
Knowledge Base.
CONCEPT TITLE Category Overview: Graphic: Description: Value to NASA:
Registration Process for new message variants
While the audience is gathering. During breaks etc
Emir Imamagić University Computing Centre (Srce)
Bill Yau HKU Grid Certificate Authority (HKU Grid CA) Self Audit & Status Report Bill Yau
Earned Value Management System Acceptance Working Group
Ready?.
DSC CoMC Switching Programme Update 17th July 2019
Presentation transcript:

CCSDS Security Credentials Blue Book 05/08/2017 CHARLES SHEEHE, CCSDS GRC POC

Security Credentials Project Overview Document Simple log in utilized in SLE Develop Security Credentials for IPsec Document Security Credentials for IPsec (White book/Blue book) Vet Security Credentials structure for IPsec Locally validate Security Credentials for IPsec Perform Compatibility testing Security Credentials for IPsec (Yellow book) NASA & CNES Provide feed back to (White book /Blue book) Publish yellow book Publish Blue book

CCSDS Security Credentials Project Process Authority to proceed Evaluate IPsec and Certificate management related standards Define CCSDS/IPsec Security Credentials needs Develop work plan Develop document outline Develop draft document Refine draft document Develop Test Plan Approval of Test Plan Perform independent testing Modify test plan Connection between agencies Started compatibility testing Completed compatibility tests Documentation of test results Document Lessons Learned Present results to CCSDS working group Update Blue book and publish yellow book Key deliverable Yellow book Blue book

Update Current Status Blue Book: is ready for a draft status when approved. Comments Have been received: and in the process of integration.

Lessons Learned

We at NASA Glenn would like to thank; Julien Airaud and the team from CNES, it will be a pleasure working with them again.

Backup

Questions