DOM & DU tendering and assembly

Slides:



Advertisements
Similar presentations
CDR Feb 2006Mar 2008Dec 2009 Mar Design Study Preparatory Phase TDR tendering construction data taking governance legal entity pre-production.
Advertisements

Profitability and Risk Management 1 Theory of Constraints Let’s go back to the CVP model: What “constrains” your profit? If you can choose X to be arbitrarily.
WP F/L Development of the Dom support and rope- and cable management for KM3-Net. KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef Edward Berbee.
Rope & Cable management A vertical electro-optical backbone cable for KM3NeT Gertjan Mul On behalf of the km3net collaboration Nikhef.
The Multi-PMT Optical Module P.Kooijman, University of Amsterdam University of Utrecht Nikhef.
Notes and questions from a first integration in Catania of the DOM top hemisphere
Hamamatsu Photonics K.K. Electron Tube Division R for ICECUBE 1.Delivery Record and Plan 2.Specification of R Test Result at Hamamatsu.
LUCOEX Large Underground Concept EXperiments 2011 – 2014 Work Package 5 KBS-3V Emplacement tests in ONKALO Progress and Plans Project Progress Meeting.
Cost Engineering Solutions Ltd 1 C€$ “DETAILED” ESTIMATING Dave Lewis European Aerospace Cost Engineering Working Group 18th April 2002.
WP F/L A mechanical design for a detection unit for a deep- sea neutrino telescope VLVnT11 - Edward Berbee - Nikhef.
Work Breakdown Structure (WBS) Development
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
String mechanics and production P.Kooijman,NIKHEF/UU Pylos, april 2007.
OMG 402 LAB 4 HP Video EOQ. HP Video What can you say about such an award- winning performance? As illustrated in The Goal, idle hands are not necessarily.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
M. Circella, Technical and Planning issues, KM3NeT SC meeting, 29 July In this talk Preparation of mass construction (including DOM and DU integration)
Catania Integration site 5/11/15 Integration meeting 5 Nov 2015 Latest activities in Catania site 1.
Nayda G. Santiago Oct 28, 2009 ICOM/INEL Poster Session Provide a forum to show off work and discuss research in an informal setting May be the.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
DOM INTEGRATION MEETING DAAN VAN EIJK 1 OCTOBER 2015.
Combinational Logic Design. 2 Combinational Circuits A combinational logic circuit has: ♦ A set of m Boolean inputs, ♦ A set of n Boolean outputs ♦ n.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Steering committee Mechanics 29/07/ KM3NeT steering committee Edward Berbee - nikhef 2 DU-1 pictures at CPPM.
1 Motivations KM3Net VEOC Based on developments on solid cable at NEMO and Antares project and proto cable of Seacon. Optimizing properties like; flexibility.
Combinational Logic Design. 2 Combinational Circuits A combinational logic circuit has: ♦ A set of m Boolean inputs, ♦ A set of n Boolean outputs ♦ n.
Progress on the Vertical Electro- Optical Cable P.Kooijman UU/UVA/Nikhef.
Agenda Mededelingen PMT – Measurements of Hamamatsu PMTs, Erwin – New persons Dorothea – Test area, euipment, etc. VEOC/String – debriefing meeting at.
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
WP F/L Dom production. KM3Net meeting 2012 Erlangen - Edward Berbee - Nikhef22/06/20121.
DOM assembly KM3NeT collaboration meeting Assembly Edward Berbee The cooling mushroom is put in place with tooling, a minimum amount of.
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
KM3NeT WPF/L NIKHEF- MECABAR 1 A.Cosquer on behalf of the KM3NeT consortium MECABAR PROJECT PLAN 1- Context 2- 3D views and responsibilities 3-
VEOC for the String DU Objectives Design Properties Trends Break out Box Penetrator Production Cost review Status Vertical Electric Optical Cable /eh.
Agenda Mededelingen – equipment for rope stretch test arrived – ropes SK78 40 m for tests arrived – rope DM20 offer asked (6 x 1 km) (1 euro / m, deliverty.
Mechanical design of the Pre-Production Detector Unit Model of KM3NeT Mario MUSUMECI and Riccardo PAPALEO KM3NeT PP DU subgroup coordinators.
Organizing future KM3NeT production 06-July-2010.
The PPM project. The PPM PPM-DOM in Antares (already presented) Tests of the Vertical Electro-Optical cable Deployment of a small scale production model.
Dom mechanics.. Earlier design; Reflector-ring mounted to the Pmt before the assembly of the complete Pmt foam-support. The support was made of milled.
Electronic department 5/7 July 2010, KM3NeT meeting at Nikhef - Mar van der Hoek et.al. Status and experiences with oil-filled Pressure Balanced backbone.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
DOM acceptance and calibration
Sampling.
Budgeting and Cost Estimation
KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef
DOM integration meeting
Pasquale Migliozzi INFN Napoli
HF Test station at P5 A.Mestvirishvili.
11 ii. Develop a plan for aDSM
Reviewing the concept of the UNECE Statistical Yearbook
DOM integration meeting
Purchasing supplies at CERN
WF Sports and Entertainment Marketing I
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
Protocol References Section Title 6.2 Entry Visit 5.1
PPM-DOM. SPM DOM LCM SS-part ILxx
DOM integration meeting
Manufacturing system design (MSD)
Budgeting: Estimating Costs and Risks
Constructive Cost Model
PRODUCTION PLANNING AND CONTROL
Business Practices.
St. Edward’s University
Software life cycle models
Fractions.
General Data Protection Regulations (GDPR) Training
Carrying out Practical Tasks
Labour
Amplifier Project.
Item 5 Modernisation of the EU-SILC Production
On FAD’s Mechanics 17/04/2019.
Presentation transcript:

DOM & DU tendering and assembly 21/02/2012 KM3Net General meeting 2012 Catania - Edward Berbee - Nikhef

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Estimation of the total costs for the DU’s in m€. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef Organizing future KM3net production 2

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 European public tendering; -Tendering procedure necessary > 192 k€. (2011) -Tendering can be done as a consortium -Including preparation approximately 6 months, minimum 4 months. -Delivery time has to be added! Lowest price <-> economically best offer ???? 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 3 Organizing future KM3net production 3

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Mechanical parts; Tendering procedure relatively simple, narrow constrains (drawings) and much competition. If the drawings are 100% clear the tendering procedure can be done on “lowest price” -A total of 20 M€ of mechanical parts. -All pure mechanical parts in one European public tendering document, a complete package divided in lots, each part 1 lot, possibility of obtaining an order for any amount of lots. -Producing such a tender 4 times, starting with 10% (2 M€) of the total amount, subsequently another 3 tenders of 30 % (6 M€) of the total amount. -Bigger amounts will not reduce the prices drastically. -Estimated delivery time 2-3 months. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 4 Organizing future KM3net production 4

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Delivery of glass spheres; Tendering procedure relatively simple, enough competition and production relatively easy to expand. If the requirements are completely clear the tendering procedure can be done on “lowest price”. -A total of 3 M€ of glass spheres can be expected. -Tendering procedure could be done by asking prices for batches of e.g. 4.000, 8.000 and 13.000 pieces. -Conical holes to be decided. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 5 Organizing future KM3net production 5

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Delivery of the electronic boards; Tendering procedure relatively simple, but more attention needed for quality of work at the producer and proof of this, also much competition, the tendering procedure can not be done on “lowest price” only. A total of 35 M€ for electronic boards; -6 M€ for the bare boards, probably to be tendered in one document with 6 lots and a small (5%) preproduction series. -29 M€ for assembly and components, also 6 lots, probably better to divide in lots than to use different producers for one kind of board (so one producer for 12800 boards) -Estimated delivery time 3 months for the boards and 3 months for assembly of a small (5%?) preproduction series. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6 Organizing future KM3net production 6

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Delivery of the VEOC’s and BEOC’s; Tendering procedure quite complicated due to lack of competition and high risk component. It is under discussion if the VEOC’s should be made external or internal, BEOC’s probably should be produced externally. If European public tendering is chosen for the VEOC, more firms should be contacted to interest them. The for this kind of product high earning rates and lack of competition make this mandatory. For the VEOC’s the aim should probably be only one external firm due to the special production line that has to be build for it. For the BEOC tendering procedure could be done by asking prices for batches of e.g. 4.000, 8.000 and 13.000 pieces. A total amount of 12 M€ for the VEOC’s can be expected if externally produced, another 5 M€ for the BEOC’s . 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 7 Organizing future KM3net production 7

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Tendering procedure complicated due to lack of competition, the tendering procedure could be done by asking prices for batches of e.g. 100.000, 200.000 and 300.000 pieces. Afterwards the optimal combination of producers could be chosen (if there is more than one producer). A total amount of 50 M€ for the PMT’s can be expected; Delivery of the PMT’s; 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 8 Organizing future KM3net production 8

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 9 Organizing future KM3net production 9

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Gel-filling for top-and bottom hemisphere + test before filling. Storage for components, sufficient for one day. Storage-buffer for ready and partly ready products. Assembly of bottom hemisphere, pmt’s with bases and signal collection board Test setup for both top and bottom- hemispheres. Two assembly-tables for top hemisphere, pmt’s and electronics. Assembly of dom’s, simple end check. Storage-buffer for empty (rolling) tables. Packaging and transport. Tasks: packaging, gel-filling and Functional test before filling. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 10 Organizing future KM3net production 10

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 As an example; three sites to assemble OM’s, and one site that exclusively produces complete DU’s. DOM production, 6 sites, per site; -8 Fte -250 m2 production and testing. -100 m2 storage. For DU production at 1 site; -11 Fte -1000 m2 assembly and testing. -storage (750 m2) 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 11 Organizing future KM3net production 11

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 “Reminder” Total manpower needed (for production, assembly and quality control at production); 60 fte during four years A bit more specified on the next slide; 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 12 Organizing future KM3net production 12

KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef 6-July-2010 Estimation of the assembly-hours in Fte years for the DU’s. OM-assembly is incl. electronics. 140 Du’s ready 230 Du’s ready 320 Du’s ready 50 Du’s ready 5 Du’s ready Fte. 21/02/2012 KM3Net General meeting 2012 Catania- Edward Berbee - Nikhef Organizing future KM3net production 13