Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam

Slides:



Advertisements
Similar presentations
VALUE ENGINEERING Mohammed A. Us Shan Saleh H. Al-Mutairi Sagar M. Al-Anazi Samir A. Sulaiman Saleh S. Al-Abbas REFINERY FACILITY.
Advertisements

The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Oil Analysis Implementation Strategy J. Mike Weiksner BSME - Auburn University Years in Industry (EMO) Hold Certifications in Vibration & Oil.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
CEM-512 Value Engineering Highway Project: South Interchange.
VALUE ENGINEERING Prepared By Mohammed Abdul Hafeez Us Shan PLUMBING OF A VILLA In Relevance to CEM 512 This Project is Prepared for Honorable Dr. SAADI.
The System Development Life Cycle
Objectives: Understand importance of utility and maintenance system in industry/plant.
VM SAVE International providing value ….. to the world VM Briefing SAVE International introduces “ Value Methodology ” Presentation version 1.
Systems Development Life Cycle
ENERGY CONSERVATION TEAM (Facility Audits and Recommissioning )
CE HYDRAULICS ENGINEERING
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
Value Engineering Value Engineering is the conscious, systematic application of a set of techniques that identify the needed functions, establish values.
Energy Efficiency Office, EMSD
Water Supply.
Value Analysis Prepared by Bhakti Joshi July 11, 2014.
District Heating Technology Improvement of district heating systems efficiency starts at the consumer New calculation tools help consumer and district.
Don’t Scrub When You Can Be Clean A Mobile CNG Pipeline Operational in 6-12 months Low capital expense Relatively short contract duration Phased-in approach.
How Rising Energy Prices Can Affect Your Portfolio Common Sense on Complex Issues.
15 Water Supply. 2 Objectives Describe the sources of water for a municipal water supply system. Explain the purpose of a water treatment facility. Describe.
Reducing Waste and Energy Consumption Neil Evan Peterson Advisor: Paul Pagel.
Sustainable Design Group 4 Becca Bogdan Ines Aline Ilektra Kiriakos.
CVE 4070 Construction Engineering Value Engineering Prof. Ralph V. Locurcio, PE.
Flow Planner Presentation Selected Case Studies. Internet / Intranet based Process Engineering Flow Planner Features Analyze an unlimited number of flow.
Convert Gas Pneumatic Controls to Instrument Air Lessons Learned from Natural Gas STAR Partners EPA’s Natural Gas STAR Program, Pioneer Natural Resources.
A MAJOR PLAYER IN ENERGY EFFICIENCY AND RENEWABLE ENERGY SOURCES The District Heating Network, the most modern and adapted tool to develop renewable energy.
An Introduction to Transportation Systems
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Energy Efficiency in Public Buildings in Brazil – Guidelines for Implementation Anand Subbiah, Nexant Inc. April 30, 2002, Kubitschek Plaza Hotel, Brasilia,
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Alternative Rate Structure Paul Smith Vice President, Rates Duke Energy Ohio June 20, 2006.
PRESENTSITS Sanitary Wastewater Concentrator. A Shortcut to Reusable Clean Water From Sanitary Wastewater!
Vickers Energy Group Introduction to the Vickers Energy Management System.
Principle of ongoing improvement
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Sanitary Engineering Lecture 8. Water Reuse Water reuse describes the process whereby wastewater (it's include storm water which is a term used to describe.
The System Development Life Cycle
Systems Development Life Cycle
Burton Elementary School
Sub Station.
Solar Power Applications
Seminar On Energy Audit Submitted To: Submitted By:
POWER PLANT ENGINEERING( )
Process Layout Chapter #6.
Introduction to Methods Engineering
UNC Modification Proposal 0202 National Grid Distribution
Energy Savings Projects
UNIT INJECTOR SYSTEM.
Industrial Assessment Center Database
Wastewater Surcharge Reduction for Manufacturing Processes
(Additional materials)
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
It can be as easy as turning down a thermostat.
The System Development Life Cycle
Design of Electric Power Systems and Utilities
Transportation of oil BY DR. GHULAM ABBAS.
Transportation of oil BY DR. GHULAM ABBAS.
Term Project: Challenges in supplying Energy to Central Region
Calibrated Energy Models: One New Change
Dynamic Chiller Optimization The Next Level of Retro-Commissioning
Alabama Industrial Assessment Center
Solar Water Heating System Group 6 Meghan Hanington, Alex MacDonald,
Burton Elementary School
Systems Development Life Cycle
UNIT No- III- Leverging Information System ( Investing strategy )
Module 4: Storage and Dispensing Locations
Fueling the Future of the Fairbanks North Star Borough
Uinta Basin Industry BMPs Stuart Siffring
Petro Data Mgt III- Facilities
Presentation transcript:

Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam Refinery facility Group 8 David Boley, Deneb Bosch, Nathen Miller, Thanh-an Sam

Introduction Three Value Engineering teams Teams had 15 members Professionals from the oil company Potential initial savings of $55 million $1 million annual saving if the changes were implemented

Team 1: Project Layout Team 2: Process Team 3: Electrical/Mechanical/Piping

Team 1: Layout IMPLEMENTING VE Purpose: Value engineer (VE) the layout space of refinery facility by rearranging of pipe to reduce $. Result: After the VE study, it is estimated that the potential savings would be 8.5 million in initial costs due to reduction of interface cost and size of building to meet the project objective rather than desired future requirement.

TOOLS Team One conducted the VE based on function analysis using the Function Analysis System Technique (FAST) Diagram to help it determine which component meets its project objective. Team One implemented the Weighted Evaluation to narrow down on the less important focus in the VE study.

IDEAS At the beginning of the study, the team came up with many ideas for development, four were selected. Twelve suggestions were also developed. Team One had four proposals for VE study, one of which was the main focus for the team to recommend was the revise layout of site.

ORIGINAL LAYOUT OF REFINERY FACILITY

PROPOSED LAYOUT OF REFINERY FACILITY

ORIGINAL DESIGN *(costs all $x1,000) ADVANTAGES DISADVANTAGES Not known Unnecessary quantity of piping used High in present worth costs of $6,028 High in annual cost of $642

PROPOSED DESIGN *(costs all $x1,000) ADVANTAGES DISADVANTAGES Low in quantity of piping used Not known Low in present worth costs $3,368 Low in annual costs of $364 Life cycle present worth savings of $2,938 Result- Reduction in on-site piping from $7,847 meters to 4,499 meters.

Team 2: Process proposals P-14 Use Seawater for Process Cooling] P-17 Eliminate/Reduce Seawater pumps P-25 Product Pipeline Scrapers P-36 Combine/Reduce Size of Storage Tanks

Implemented Proposal P-36 Combine/Reduce Size of Storage Tanks Feeding the Process Product Storage By-Product Storage

Feeding the Process Original Design Two Stock Tanks One filling while the other feeds the system Proposed Design Directly feed the process One stock tank available for off-spec product, catch feed if the process is down or to feed the system if pipeline is down

Product Storage Original Design Intermediate tanks to test the product before it is pumped to the port Proposed Design No on-site storage the product is pumped directly to the port Product is tested continuously by taking frequent samples directly from the process

By-Product Storage Original Design By-product stored in day storage until shipped to the port Proposed Design By-product pumped directly to the port

Actual Reductions/Savings Reduced the quantity of the monitoring wells Eliminated storage tanks Eliminated concrete pads for 9 tanks Eliminated 14 pumps Replaced 5 miles of 10”, 12” and 14” pipes with 4”, 6”, and 8” pipe Reduced energy consumption Increased Reliability

Summary of Cost Savings Original Design Total Initial cost $60.9 million Total Annual Cost $830,000 Total PW Cost $67.973 million Total Saving Proposed Design Total Initial cost $27.1 million Total Annual Cost $145,000 Total PW Cost $28.334 million $39.6 million

Team 3: Electrical/Mechanical/Piping M-10 Eliminate One Loading Arm. M-17 Combine Wastewater & Off-Plot Tank feed. M-21 Eliminate Tank Area Fill E-2 Reevaluate Substation E-3 Revise 115 KV Plant Feed

Implemented Proposal E-3 Original Design: 115 KV Plant Feed Installed Underground Proposed Design: Install 115 KV Plant Feed Above Ground Note: Local utilities require 115 KV feed to be installed underground. VE team felt that above ground service is suitable for this industrial application. Waiver must be requested.

Functional Analysis Proposed Design offers the same function as the original design of delivering the 115 KV plant feed.

Cost Worksheet Cost Reduction for Proposal E-3 Cost Additions for Proposal E-3

Present Worth Cost Savings Initial Cost Savings: $4,299,696 + Annual O+M Cost Savings: $0 ______________ Total PW Cost Savings: $4,299,696