IEC FDIS 2016 Worked Examples Ellie Weyer, AWS True Power

Slides:



Advertisements
Similar presentations
Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
Advertisements

PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
Inflow angle and Energy Production Jørgen Højstrup Wind Solutions / Højstrup Wind Energy Power Curve Working Group, Louisville 6 October 2014.
TOWARDS BANKABLE LIDARS - HOW STABLE ARE LIDARS OVER TIME?
Parameterised turbine performance Power Curve Working Group – Glasgow, 16 December 2014 Stuart Baylis, Matthew Colls, Przemek Marek, Alex Head.
PCWG meeting Louisville CO USA October 2014 Maintenance team MT12-1 Revision of IEC : Wind Turbines – Part 12-1: Power performance measurements.
Power Curve Working Group Overview
1 PCWG Peter Stuart 02 September Agenda (1) 2 Morning Session: 10am-1pm – “Welcome” Peter Stuart (RES) – “Review of Actions.
PCWG 9 th Meeting: 12 December Glasgow Proposed PCWG Data Sharing Initiative.
PCWG 9 th Meeting: 12 December Glasgow Round Robin 4 Results: Conditions Specific Power Curves.
LiDAR analysis at a site with simple terrain Alex Clerc, Lee Cameron Tuesday 2 nd September
The Remote Sensing of Winds Student: Paul Behrens Placement and monitoring of wind turbines Supervisor: Stuart Bradley.
3D Power Deviation Matrix PCWG Meeting – New Orleans, LA. September 14, 2015 Alex Head.
Power Curve Working Group Update New Orleans 15 th September 2015.
© 2013 OSLC Steering Committee1 Proposal to Create OSLC Affiliated Technical Committees OSLC Steering Committee Meeting: 1 PM EDT, 8 July 2013 Open Services.
Revision of IEC PT Power performance measurements on electricity producing wind turbines TC88 meeting March 2010 Troels Friis Pedersen.
AWS Truewind Methodology Timeline of AWS Truewind participation Key points Wind resource modeling Estimation of plant output Validation and adjustment.
Power Curve Working Group Update Roskilde 26 th June 2015.
A New Theoretical Basis for Describing Low Turbulence Wind Turbine Performance Peter Stuart PCWG Meeting – 26 June 2015.
Experience of Modelling Forested Complex Terrain Peter Stuart, Ian Hunter & Nicola Atkinson 30 th October 2009.
PCWG 15 th Meeting December 2015 – Kings Langley PCWG 2016 Roadmap: Detailed Survey Results.
PCWG-Share-01 Initial Results PCWG Meeting Kings Langley 9 th December 2015 Peter Stuart (RES), Lee Cameron (RES), Alex Clerc (RES) & Andy Clifton (NREL),
8th October Aarhus PCWG-Share-01 Introduction.
PCWG-Share-01 Current Status PCWG Meeting Hamburg 10 th March 2016 Peter Stuart (RES) and Andy Clifton (NREL), on behalf of the Power Curve Working Group.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
IEC series restructure Proposal to TC88 MT12-1/PCWG Meetings – Frankfurt May 2016 Alan Derrick, RES Frank Ormel, Vestas.
API 19 CI Chemical Injection Devices for Downhole Applications
Risk-based Global Insurance Capital Standard Version 1
PCWG 2016 Update 20th May 2016 Peter Stuart.
IEC FDIS 2016 Worked Example Industrial Project
IEC FDIS 2016 Consensus Analysis Project
Performance verification
PCWG 2016 Update Wednesday, 13 December 2016 Glasgow, Scotland
Future Organisation of the PCWG
PCWG Intelligence Sharing Initiative Update
PCWG Intelligence Sharing Initiative Update 13 December 2016
Upflow correction method
IEA Task 32 Power Performance Uncertainty Round Robin
North Carolina Council on Developmental Disabilities
Contents Cumulating of uncertainties across site calibration and power curve test Cumulating of uncertainties across wind speed bins Order of uncertainty.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
PCWG 2016 Roadmap & Meeting Overview
Results from the Offshore Wind Accelerator (OWA) Power Curve Validation using LiDAR Project Lee Cameron, Alex Clerc, Peter Stuart, Simon Feeney, Ian Couchman.
IEC TC93 Liaison Report to DASC Alex Zamfirescu IEC USNC TA TC93 Convener IEC TC93 WG2 September 2004.
PCWG Intelligence Sharing Initiative
Turbulence and Heterogeneous Wind
Road Manager Module National Heavy Vehicle Regulator
ATML Status January 2007 Issue 9
Global Inventory of Statistical Standards
Marcel van Kints United Nations Statistics Division/DESA
SCC P2P – Collaboration Made Easy Contract Management training
Artur Andrysiak Economic Statistics Section, UNECE
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
High Resolution Turbine-Specific Matrix
Validation & conformity testing
TI measurement techniques for pulsed Lidars – the Current Status
HL7/College/University Internship Program
5-beam Avent demonstrator
Potential Milestones A timeline to finish in one year
ATML ATML’s mission is to define a collection of XML-based schemas and services that allows ATE and test information to be exchanged in a common format.
SPR&I Regional Training
Lidar Measurement Accuracy under Complex Wind Flow in Use for Wind Farm Projects Matthieu Boquet, Mehdi Machta, Jean-Marc Thevenoud
The Importance of Reforecasts at CPC
Road Manager Module National Heavy Vehicle Regulator
North Carolina Council on Developmental Disabilities
A New Tool for Evaluating Candidate PM FEM and PM2.5 ARM Monitors
Capacity Access Review
Green Document for WG 47 on Fires in Tumble Dryers
CFARS - Science Working Group Update
Presentation transcript:

IEC 61400-12-1 FDIS 2016 Worked Examples Ellie Weyer, AWS True Power 29th September 2016 Minneapolis, US Ellie Weyer, AWS True Power

PCWG Industrial Placement The first PCWG Industrial Placement was completed by Andrew Lawrence of Cambridge University during July and August 2016. The placement was sponsored by SSE, RES & Senvion. The placement was hosted at RES’s office Kings Langley and managed by Lee Cameron (RES). Andrew was tasked with completing a set of work examples of the uncertainty methodology of the new IEC 61400-12-1 standard. This project is intended to be complimentary to the IEA Task 32 Uncertainty Round Robin Many thanks to our supporting members who made this industrial placement possible

IEC 61400-12-1 Edition 2 Status Document Stage Document Stage Description Status CDV Committee Draft for Voting Feedback Stage: Document is sent to the various National Committees for comment. Once the feedback is received the TC (Technical Committee) integrated the feedback and prepares the FDIS. Completed FDIS Final Draft International Standard Approval Stage: Document is sent to the National Committees for voting. At this stage no comments or requests for change are accepted although typographical errors can be pointed out for correction by IEC prior to publication. Translation of FDIS to French followed by issue of English/French FDIS to national committees for voting in October. Publication of IS (International Standard) Final Stage: The IEC generates the cover pages and prepares the document for publication. The document is published and put on sale in the IEC Web Store. Note that editorial errors not captured prior to publication can still be issued as corrigendum by IEC throughout the life of a specific publication. Expected Late 2016/Early 2017 Current Status The PCWG in collaboration with IEA Task 32 are seeking to build industry understanding of the new Power Performance Standard. www.pcwg.org.

IEC Task 32 & PCWG Collaboration Overview The PCWG & IEA Task 32 are collaborating on a round robin exercise and associated set of spreadsheet worked examples: IEC Task 32 is running a round robin on the application of IEC61400-12-1 Ed 2 using LiDAR data. The round robin will have particular focus on the uncertainty methodology of the new standard. The PCWG is seeking to develop a set of worked examples showing how to apply the uncertainty method defined in the new standard. Once complete these worked examples will serve as both an educational tool and as a benchmark for the PCWG analysis tool. Expected Outcome: The combination of the round robin and supporting work examples are intended to build industry understanding and consensus of the new edition of IEC 61400-12-1.

IEA Task32 & PCWG Activities Timeline (2016) Round Robin Worked Examples Distribution of round robin dataset and instructions to participants. Initial round robin results presented at Pamplona and Minneapolis PCWG meetings. Second round robin initiated, results due by end of October. Collation of final results Presentation of final results at PCWG meeting in Glasgow. Preparation of work examples. Presentation of full suite of worked examples at September PCWG Meetings. Release of worked examples on PCWG DropBox. IEA32 & PCWG members to review worked examples and provide feedback. Public publication of work examples after Dec PCWG meeting (www.pcwg.org) Jul & Aug Sept Oct Nov Dec

IEC 61400-12-1 FDIS 2016 Worked Examples

Worked Examples Objective We aim to demonstrate the proper implementation of the new IEC power performance testing standard, with focus on the uncertainty calculation. We aim to do this by creating a collection of Excel spreadsheet calculations for key sections. The calculations will be modular in structure, each showing the method for a small section.

Worked Examples Objective We aim to demonstrate the proper implementation of the new IEC power performance testing standard, with focus on the uncertainty calculation. We aim to do this by creating a collection of Excel spreadsheet calculations for key sections. The calculations will be modular in structure, each showing the method for a small section.

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty This is the AEP uncertainty. It is what we need to calculate!

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty Hours in a year. This turns our uncertainty in power into and uncertainty in energy

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty Many components vary with wind speed so the combination is performed across all bins of the power curve

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty Relative occurrence of each wind speed bin (to account for long term wind speed distribution)

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty Category A uncertainties Statistical uncertainties, based on the data. Due to statistical scatter, do not account for potential bias. Category B uncertainties To reflect potential bias in instrumentation and due to methodology.

Power Curve Uncertainty Calculations Uncertainty combination Equation E.8 in the standard gives the method for combining separate uncertainty contributions to give overall uncertainty Category A uncertainties Statistical uncertainties, based on the data. Due to statistical scatter, do not account for potential bias. Category B uncertainties To reflect potential bias in instrumentation and due to methodology. We have a made spreadsheet demonstrating the calculation of each category A and B uncertainty component

Power Curve Uncertainty Calculations Category A - Power “Power Curve Measurement Using The Method of Bins.xlsx” Simple and well understood Related to the standard deviation in each power curve bin

Power Curve Uncertainty Calculations Category A - Site Calibration “Site Calibration Using Linear Regression.xlsx” New in this issue of the standard Based on “K-Fold Analysis”: Break the site calibration filtered dataset into 10 subsets (“folds”) Predict turbine mast wind speed for each subset using the calibration data from the other 9 folds Uncertainty is based on the standard deviation of prediction error in each fold

Power Curve Uncertainty Calculations Category B - Power “E.5 Category B Uncertainty in Electric Power.xlsx” Uncertainties due to: Current and voltage transformers Power transducer Data acquisition Depends on the classification of voltage and current transformers IEC 60044-1 gives uncertainties for different class of current transformers IEC 60688-1 gives uncertainties for different class power transducers

Power Curve Uncertainty Calculations Category B – Wind Speed “due to hardware used”, i.e. WS measurement instrumentation For cup or sonic anemometer: Components due to: Pre-test calibration, post-test calibration Classification Mounting Lightning Finial Data acquisition system REWS is not a piece of hardware, rather it is a definition of wind speed measurement. You can measure this using either mast or RSD in theory, although only RSD is practical.

Power Curve Uncertainty Calculations Category B – Wind Speed “due to hardware used”, i.e. WS measurement instrumentation For RSD: Components due to: Verification test vs mast In-situ comparison to mast RSD classification Mounting Flow variation in the measurement volume Monitoring of the RSD REWS is not a piece of hardware, rather it is a definition of wind speed measurement. You can measure this using either mast or RSD in theory, although only RSD is practical.

Power Curve Uncertainty Calculations Category B – Wind Speed Uncertainties due to: Hardware used "E.13.4 Category B uncertainty in wind speed from cup or sonic.xlsx" "E.13.5 Category B uncertainty in wind speed from RSD.xlsx" "E.13.6 Category B uncertainty in wind speed from REWS.xlsx" Note that REWS can in theory be measured with mast or RSD, in reality only RSD is practical Terrain "E.13.11 Category B uncertainty in wind speed from flow distortion due to terrain.xlsx“ Related to the site calibration (or lack thereof) Air Density Correction "E.10 Category B uncertainty in Air Density.xlsx" Related to air density correction ` "E.13.3 Category B Uncertainty in the Wind Speed Measurement.xlsx" REWS is not a piece of hardware, rather it is a definition of wind speed measurement. You can measure this using either mast or RSD in theory, although only RSD is practical.

Power Curve Uncertainty Calculations Category B – Temperature, Pressure and Relative Humidity "E.10 Category B uncertainty in Air Density.xlsx" Relative humidity was not included in the previous standard Same components, but sensitivity factor has changed in this issue of the standard All informed by manufacturer specs with extra penalties if measurement is far from hub height Temperature: Calibration Shielding Mounting Data acquisition Pressure: Calibration Mounting Data acquisition Relative Humidity: Calibration Mounting Data acquisition

Power Curve Uncertainty Calculations Category B – Method related components "E.13.15 Category B Uncertainty Calculation for Method related components.xlsx" Many new sub-components in this issue of the standard Uncertainties due to: Uncertainty in calculation of wind shear & veer Uncertainty due to lack of knowledge of upflow angle & turbulence Uncertainty due to unquantifiable seasonal effects Uncertainty due to cold climate Uncertainty due to turbulence normalisation

REFERENCES PCWG Drop Box Folder Email PCWG@res-ltd.com for access. [1] Lawrence, A., (2016), Power Curve Measurement Using Method of Bins, RES CALCULATION, TC01-037758, Issue 01 [2] Lawrence, A., (2016), Site Calibration Using Linear Regression [3] Lawrence, A., (2016), E.5 Category B Uncertainty in Electric Power [4] Lawrence, A., (2016), E.13.3 Category B Uncertainty in the wind speed measurement [5] Lawrence, A., (2016), E.10 Category B Uncertainty in Air Density [6] Lawrence, A., (2016), E.13.15 Category B Uncertainty for Method related components PCWG Drop Box Folder Email PCWG@res-ltd.com for access. Email Feedback to PCWG@res-ltd.com.

Worked Example Feedback Tracker Feedback Tracker Spreadsheet can be found in DropBox next to the worked example spreadsheets. Email Your Feedback to PCWG@res-ltd.com.

Join the Power Curve Working Group at: www.pcwg.org