UK Performance-based Navigation (PBN) Implementation Status

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

MINIMUM NAVIGATION PERFORMANCE SPECIFICATION AIRSPACE (MNPS)
1 Welcome Safety Regulatory Function Handbook April 2006.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Javier Perez Diestro Air Navigation International Director
PBN ICAO HQ Activities Overview
UK Performance-based Navigation (PBN) Implementation Status
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
22 May 2007OST EASA Transposition of JAA TGL No. 10 (Precision RNAV) Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Future Airspace Strategy (FAS) Heathrow Airport Consultative Committee 31 st March 2010 Phil Roberts Assistant Director of Airspace Policy 1 1.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN Plan Development Aviation Industry Forum 18 November 2009.
ICAO Provisions for Safety Management
Mr. Hooper Harris FAA/JAA Annual Meeting Phoenix, AZ June 3 - 7, 2002
Applying Innovation Dubai Airport Show 2015 – Innovation podium Tuesday 12 March 2015, Session 1, 10:15 – 10:45 Laurent Delétraz.
Farnborough Airspace Change Proposal Briefing to FACC 7 th March 2013.
1 Airspace Change Process & Airspace Trials in the context of Modernising UK Airspace Darren Rhodes Civil Aviation Authority.
Performance Based Navigation Industry Forum Issues Workshop Presentation to Industry Forum 18 November 2009.
17 January 2014 United Kingdom Future Airspace Strategy FAS VFR Implementation Group Launch Meeting Phil Roberts – SARG Hd AAA.
Introduction to PBN Seminar ICAO PBN Implementation 1.
FASVIG Introductory Meeting
PBN Deployment – New Zealand Domestic Airspace CAA PBN Forum November Auckland.
Performance Based Navigation (PBN) Canadian Implementation Presentation to Air Transport Association of Canada 9 November 2010.
ICAO Requirements on Certification of Aerodromes Module - 2
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
1 PBN Performance Based Navigation - Concept & Change - Presented by: Lex Hendriks, EUROCONTROL ICAO Performance Symposium March 2007 Federal Aviation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Sustainable Aviation: Cleaner, Quieter, Smarter
Gatwick Airspace Seminar Emma Simpson Principal Airspace Regulator Civil Aviation Authority 10 May 2016.
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
APAC PBN Seminar F.LECAT (ICAO)
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
FAA NAVAID Rationalization / Resiliency Overview
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
Flight Validation Process of RNP APCH Procedures: Thailand Case Study
PlaneWrong AGM Thursday 13th October
Overview of Continental En-route Navigation Specifications
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
The Norwegian PBN Implementation Plan Arne Lindberg Inspector ANS
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
PBN Performance Based Navigation
Continuous Climb Operations (CCO) Saulo Da Silva
ALLPIRG/4 MEETING PARTICIPANTS (Montreal , 8 February 2001)
Airspace Change Summary
Workshop on preparations for ANConf/12 − ASBU methodology
Mr. Kevin Lam Director of Airport Infrastructure & Air Navigation
Performance Based Navigation at London Stansted
IAOPA 29th IAOPA World Assembly Queenstown, NZ March 2018 PBN and the Benefits for GA.
Continuous Climb Operations (CCO) Saulo Da Silva
ASEAN PBN Routes Objectives:
PBN and the benefits for GA
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.
AIXM and AIRM Analysis Results Summary.
RNAV and RNP Strategy in Japan
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Balanced Approach to Noise Mitigation
Balanced Approach to Noise Mitigation
PBN ICAO HQ Activities Overview
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

UK Performance-based Navigation (PBN) Implementation Status Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace Policy 02 July 2012 ICAO-EUR PBN TF/7

PBN Regulatory Enablers 1 PBN Regulatory Enablers 02 July 2012 ICAO-EUR PBN TF/7

Delivering a Future Airspace Strategy (FAS) The FAS Industry Implementation Group (FASIIG) Objective: “To work collaboratively across the aviation industry (NATS, CAA, Airports, Airlines, Military, GA) to develop and agree an implementation plan to deliver the CAA’s Future Airspace Strategy for the 2015-2020 timescale. The FASIIG will work within a fixed two year timescale in order to deliver an implementation plan which delivers a set of tangible benefits within the 2015-2020 timescale or earlier where possible.” 02 July 2012 ICAO-EUR PBN TF/7

Delivery of FAS Develop a FAS Implementation Plan by end of 2012 Align it to near and longer term SESAR objectives Monitor & manage the action plan to ensure timely progress The FASIIG will provide the opportunity to develop cross industry positions for input to government and regulatory policy making Identify key airspace, technical and policy constraints to realisation of the FAS PBN seen as a key element of the FAS implementation plan 02 July 2012 ICAO-EUR PBN TF/7

PBN Regulatory Enablers UK Air Navigation Order (CAP 393) Articles 124/125 Area navigation and required navigation performance capabilities Aircraft registered in the UK (124) Aircraft registered elsewhere than the UK (125) Policy for the Application of PBN in UK/Irish Airspace 02 July 2012 ICAO-EUR PBN TF/7

ANO Articles 124/125 An aircraft must not fly in required navigation performance airspace unless it is equipped with area navigation equipment which enables the aircraft to maintain the navigation performance capability notified, prescribed or otherwise designated for that airspace The equipment must be approved, installed in an acceptable manner, maintained and operated in accordance with approved procedures An aircraft need not comply with these requirements if ATC, having been made aware of the lack of compliance, authorises the flight or the aircraft complies with any ATC instructions 02 July 2012 ICAO-EUR PBN TF/7

Policy for the Application of PBN in UK/Irish Airspace Approved at FAB Supervisory Committee Meeting in Dublin on 13 October 2011 Comprises 12 high-level policy statements The PBN Policy sets out a specific framework with guidance and support to ANSPs and operators to help facilitate implementation Subject to review and update in late 2012 02 July 2012 ICAO-EUR PBN TF/7

PBN Caveats PBN is only one element of technological and operational enhancements providing enablers for FAS Environmental policy, cost and business drivers will have an impact on how quickly PBN can be moved forward The PBN Policy does not contain all of the answers to implementation issues, these will have to be developed separately through the UK/Irish PBN Implementation Working Group 02 July 2012 ICAO-EUR PBN TF/7

AIC - Application of PBN in UK Airspace Approximates to a UK PBN Implementation Plan A roadmap for ANSPs and Airports seeking to introduce PBN as part of their airspace changes Intended to provide framework for LAMP and NTCA Link to Air Navigation Order (ANO) Articles 124 and 125 Still very much an enabling AIC Sets out 2014, 2016 and 2018 objectives based on anticipated aircraft capabilities AIC needs to be read in conjunction with PBN Policy document Yellow 023/2012 refers 02 July 2012 ICAO-EUR PBN TF/7

2 Current Status 02 July 2012 ICAO-EUR PBN TF/7

Current Status En-route From 7 April 2011, B-RNAV (RNAV 5) became applicable on all UK ATS routes at all levels/altitudes in controlled airspace as promulgated in the UK AIP 02 July 2012 ICAO-EUR PBN TF/7

Current Status Terminal Airspace Still no P-RNAV (RNAV 1) SIDs or STARs implemented, although STARs are largely covered by the extension of the B-RNAV mandate NATS London Airspace Management Programme (LAMP) and Northern Terminal Control Area (NTCA) Projects Gatwick RNAV 1 SIDs (transposing trials to permanent procedures) Newcastle RNAV 1 SIDs, Leeds/Bradford RNAV 1 SIDs and STARs 02 July 2012 ICAO-EUR PBN TF/7

Current Status RNP APCH implementation today High levels of interest to implement RNAV (GNSS) Approaches APV Demand may exceed IAP design and regulation capacity Profile raised by EC 7th Framework Funding call for LPV implementation (ACCEPTA) 14 aerodromes successful in UK All will include LNAV Reversion CAA encouraging inclusion of LNAV/VNAV Minima on charts where beneficial Runway ends LNAV LNAV/VNAV LPV In Service 18 9 2 In Design 2012/13 44 38 02 July 2012 ICAO-EUR PBN TF/7

Other Developments SID and NPR Working Group: Define the components of instrument departure procedures promulgated either conventionally or utilising PBN (RNAV/RNP) Identify and clarify the issues surrounding the replication of conventionally promulgated Standard Instrument Departures (SID) and any associated Noise Preferential Routes (NPR) Propose possible solutions to any issues identified above 02 July 2012 ICAO-EUR PBN TF/7

Trial of RNP 1 Departures with RF Conducting feasibility assessment for potential RNP 1 with Radius to Fix (RF) Departure trials at London Stansted RWY 04 DVR and RWY 22 CLN Trial commencement – after the London 2012 Olympics 02 July 2012 ICAO-EUR PBN TF/7

RNAV Holding Policy Objective: To publish RNAV Holding Policy Ensure that the RNAV hold and STAR is at least as safe as the current conventional procedures Hold separation standards Hold to adjacent hold Hold to route or edge of Controlled Airspace 02 July 2012 18 April 2012 ICAO-EUR PBN TF/7

CAA Policy Regarding Instrument Approach Procedures To Aerodromes Without an Instrument Runway and/or Approach Control Development of Policy and Guidance (CAP) Consultation over the summer of 2012 Publication by end of 2012 02 July 2012 ICAO-EUR PBN TF/7

Navaid Rationalisation NATS programme to “right-size” the UK conventional navigation infrastructure compatible with a PBN environment Consistent with changes to require RNAV 5 on all UK ATS routes since April 2011 and AIC Yellow 107/2011 allowing Routes and Procedures to be flown with an equivalent to ADF Removal of 8 en-route NDBs by 2018 Reduction of en-route VORs from 46 to 19 by 2018 VOR dependencies: Terminal airspace conventional procedures e.g., SIDs Instrument Approach procedures Use for training (civil and military) Means of procedural separation Mitigation against controlled airspace infringements Fragmented ownership of airports/procedures 02 July 2012 ICAO-EUR PBN TF/7

Proposed Rationalised VOR Network and Coverage 02 July 2012 ICAO-EUR PBN TF/7

CAA Web Page Refresh Web page refresh in progress – 1st phase complete High level PBN pages with pointers to internal and external material Access to RNAV (GNSS) Approach pages Dedicated contact point: pbn@caa.co.uk 02 July 2012 ICAO-EUR PBN TF/7

3 Summary 02 July 2012 ICAO-EUR PBN TF/7

Summary PBN is a key enabler for the Future Airspace Strategy (FAS) and indeed, the CAA Environmental Strategy CAA PBN Policy in place Industry implementation programme now being developed by the FASIIG AIC (Y) 023/2012 sets out the application roadmap leading into the introduction of the SES PBN IR RNP APCH offers access for all types of aircraft and to all aerodromes* Processes established to assist in deployment and CAA working to smooth the approval path * Emerging CAA policy for Non-Instrument Runways and where No-Approach Service available 02 July 2012 ICAO-EUR PBN TF/7

Summary Navigation infrastructure is part of the PBN solution NATS VOR replacement programme is therefore an opportunity to “right-size” UK navigation infrastructure through rationalisation Through FAS, the CAA is seeking to modernise and future-proof UK airspace and infrastructure 02 July 2012 ICAO-EUR PBN TF/7

Questions? Point of contact: geoff.burtenshaw@caa.co.uk 02 July 2012 ICAO-EUR PBN TF/7