L.Vitale INFN and Univ. Trieste

Slides:



Advertisements
Similar presentations
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
Advertisements

Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
PXL Electronics Status update for HFT TC meeting on May 11, 2010 at LBNL 1HFT TC 05/11/ LG.
Thermo-mechanical infrastructure: Environmental Monitoring with FOS AIDA WP9.3 meeting November 21 th DESY, Hamburg. David Moya Martin Instituto de Física.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Octobre MPI Munich -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
SVD Environmental Monitoring and VXD Radiation Monitoring L.Lanceri & L.Vitale INFN and Univ. Trieste L.Lanceri & L.Vitale, 6th VXD103/10/14.
JRA1 Magnet and Test Beam Infrastructure  Superconducting Magnet (PCMAG)  Mechanics  Cooling  Telescope Simulations  Measuring DESY Tobias.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
SVD Environmental & Radiation Monitoring L.Vitale on behalf of monitoring group INFN and Univ. Trieste & others L.Vitale - VXD Workshop1Trieste - Sep.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
1 FANGS for BEAST J. Dingfelder, A. Eyring, Laura Mari, C. Marinas, D. Pohl University of Bonn
Readiness of the FOS monitor for DESY’s thermo-mechanical mock-up. Kloster Seeon, May 19 th DEPFET Workshop D. Moya, I. Vila, A. L. Virto., J.González.
Location of SVD Temperature and Humidity Monitors L.Vitale & L.Lanceri INFN & Univ. Trieste 6 th VXD Workshop, 02/10/2014 SVD parallel for discussion Sep.
Monitoring hardware for SVD (VXD) L.Lanceri, L.Vitale /INFN Trieste VXD Workshop, 01/10/2014 Slow Controls discussion session 1 1.Radiation & beam abort.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
Readiness of the FOS monitor for the thermal mock-up and recent activities. PRAGUE, January 7 th VXD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
Beam Abort in BEAST2 phase 1 L.Vitale on behalf of INFN and Univ. Trieste L.Vitale - 8th VXD Workshop1 Trieste,
R&D LINE ON ACTIVE PIXEL DETECTORS P1.6 Fiber optic enviromental and structural vertex monitor. Ciemat, October 27 th D. Moya, I. Vila, A. L. Virto., J.González.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
3/9/20131BEAST KEK CAD style figures needed For NIM paper: 1.Dcube-micro sideview (Marc) 1. for BEAST.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
Readiness of the FOS monitor for the thermal mock-up and recent activities. Pisa, 6 th PXD SVD Workshop E. Currás, D. Moya, I. Vila, A. L. Virto., J.González.
Commissioning of the Fiber-Optical-Sensor (FOS) environmental and structural monitor AIDA 3nd Annual meeting WP9.4 Iván Vila Álvarez Instituto de Física.
Florian Buchsteiner (HEPHY Vienna)
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
WBS 1.05 Commissioning Detector Specifications & Design
Summary of Strasbourg Meeting
Interlock L.Lanceri /INFN Trieste VXD Workshop, Pisa 03/10/2014
Belle-II VXD radiation monitoring and beam abort with sCVD diamond sensors Lorenzo Vitale, Belle-II SVD collaboration INFN and Univ. Trieste, ITALY Requirements.
Slow Control Servers C. Irmler SVD 27th B2GM, KEK 21 June 2017.
Fast Luminosity Monitoring JENNIFER Mid-Term Review
Update on the SVD construction
SVT – SuperB Workshop – SLAC 6-9 Oct 2009
7th Belle II VXD Workshop, Prague
KEK news ( ) S.Tanaka.
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Report on WP2 Activities
TileCal upgrade EVO meeting Demonstrator tesks
Readiness of the FOS monitor for the thermal mock-up and recent activities. Kloster Seeon, 16th DEPFET Workshop E. Currás, D. Moya, I. Vila, A. L. Virto.,
Prologue: Strasbourg Interest in BEAST
Vertex Detector Mechanical R&D Design Questions and Issues
Contact Persons Yutaka Ushiroda proposed to set up a matrix of responsible persons (contacts) for the various subdetector tasks. He plans to have meetings.
Work packages status in Torino and perspectives
Flavour Physics Belle II experiment at SuperKEKB Tsukuba, Japan
SVD Mechanics Group Organization & Work packages
Mark McKinnon EVLA Project Manager
Electronics Sub-Group
Teleconference ACS – FREIA 19th June 2017
Accelerator NCFE Liaison Officer
SVD group organization, schedule, milestones
Presentation transcript:

L.Vitale INFN and Univ. Trieste VXD Monitoring and Interlock Sub-group organization, tasks and schedule L.Vitale INFN and Univ. Trieste Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Outline SVD organization Sub-group organization Initials Tasks and modifications Work packages Financial plan Schedule Documentation Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization SVD organization Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

Initial tasks and modifications SVD Radiation monitoring Fast ~10um monitoring to protect SVD (beam abort) Keep track of the Long Term accumulated dose SVD Environmental monitoring Temperature Humidity Evolved including PXD radiation monitoring (VXD general task as Humidity) BEAST2 participation both phase1&2, FOS to monitor more points interlocks Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

Work packages and people involved VXD radiation monitoring and Beam Abort (L.Vitale) Sensors (LV, LB, LL) RO Electronics (Elettra + LL LV) Simulations (Gianluca Inguglia?) Software EPICS (Simon Bacher?) SVD Temperature with NTC (L.Lanceri?) Hardware and lab software (PC, LL) SVD Temperature with FOS (L.Vitale) Hardware, lab software + calibration (LV, LL, TS techn, + help from PXD) VXD Humidity (L.Lanceri?) Hardware and lab software (LL, LV) Pipes (MPI, DESY, KEK) Interlock with PLC (L.Lanceri?) BEAST2 (L.Vitale) Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Interactions SVD Monitoring Sub-group SuperKEKB, Other BELLE2, SVDSub-groups VXD radiation monitoring and Beam Abort SVD Temperature with NTC SVD Temperature with FOS VXD Humidity Interlock with PLC BEAST2 SuperKEKB BEAST2 Outer Detector mechanics VXD mechanics SVD mechanics SVD commissioning SVD software (slow control, simulation, ect.) SVD electronics (Power supplies, …) Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Interactions Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Financial plan and WBS We have already prepared a WBS (Work Breakdown Structure) in excel to plan, foresee and keep track all activities and money flows (INFN Trieste side) Need few updates Other financial supports for specific activities For BEAST2 (Carlos, Katsuro) Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

Approximate schedule (as ~Oct.2014) Radiation 2014   2015 2016 What 1 2 3 4 Specifications, sign up Simulations Dosimetry, characterization Diamond sensors choice Mechanics & cabling design Electronics specifications Electronics design & proto. Overall design, sign up Components, procurement "final" prototypes (4 ch.) BEAST, 1 preliminary tests BEAST, 2 complete test (4 ch) electronics production & test sensors installation & cabling electronics installation Temperature & humidity 2014   2015 2016 What 1 2 3 4 T&H Specifications, sign up Fibers, mechanical layout Fibers, assembly tests (SVD) Fibers, multiplexing scheme Fibers design sign up Procurement, assembly installation (PXD & SVD) Thermistors, lab tests Mechanics & cabling design Procurement assembly, installation

Approximate schedule (Jan.2015) TBU Radiation 2014   2015 2016 What 1 2 3 4 Specifications, sign up Simulations Dosimetry, characterization Diamond sensors choice Mechanics & cabling design Electronics specifications Electronics design & proto. Overall design, sign up Components, procurement "final" prototypes (4 ch.) BEAST, 1 preliminary tests (mod.) BEAST, 2 complete test (4 ch) electronics production & test sensors installation & cabling electronics installation Temperature & humidity 2014   2015 2016 What 1 2 3 4 T&H Specifications, sign up Fibers, mechanical layout Fibers, assembly tests (SVD) Fibers, multiplexing scheme Fibers design sign up Procurement, assembly installation (PXD & SVD) Thermistors, lab tests Mechanics & cabling design Procurement assembly, installation = needs SVD Sign off = internal milestone = just ✓ or in progress = shifted

L.Vitale - VXD Radiation & Env. Monitoring Organization Documentation Wiki page: existing, TBU Internal documentation: General requirements: ✓ Mechanics and Cabling: TBD Progress on diamonds sensors: TBD Radiation Electronics: TBD (some material) SVD NTC: ~✓ SVD FOS: TBD (only initial project) VXD Humidity: TBD (only initial project) VXD interlock: TBD (only initial project) WBS: ✓TBU Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Meetings Specific Parallel SVD sessions at VXD workshops and B2GM Reports at B2GM Background session Specific meetings when needed (need at least monthly updates on progress, issues, etc.) Periodic reports at SVD weekly meeting Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization

L.Vitale - VXD Radiation & Env. Monitoring Organization Back-up slides Prague, 22-01-2015 L.Vitale - VXD Radiation & Env. Monitoring Organization