Summary of discussions

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

LHC HARDWARE COMMISSIONING REVIEW May 2005 CRYOGENIC VACUUM SYSTEM Paul Cruikshank for AT/VAC.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
SCUs for the LCLS-II HXR FEL SCUs for the LCLS-II HXR FEL P. Emma, et. al. July 9, 2014 Hard X-Ray (HXR) FEL for LCLS-II must cover 1-5 keV (4-GeV) SASE.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
Felix Wamers, Technical Coordination Meeting, 12 th -13 th of May CERN-GSI Technical Coordination Meeting Felix Wamers, Yu Xiang,
1 SOFTWARE LIFE-CYCLES Elements and Definitions. 2 Requirements System Design Detailed Design Implementation Installation & Testing Maintenance The WATERFALL.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
1 Hi-Lumi WP3 meeting Update on the Q1 to D1 cryostat Jan 28, 2014  Outline  Cryostat cross section options  Elliptical interconnect.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Presented by, Brett Parker, BNL-SMD QD0 Prototype Status.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
30 May 2007 DESY Cryomodule Discussion 1 Type 4 Cryomodule Technical Discussion Tom Peterson Compiled from various previous meeting notes and many sources.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
X LCLS SCU NbTi Prototype Schedule Version: February 12, 2015 Update 23JUN2015 X X System complete and ready for test X System complete & tested w/Hall.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Vacuum, Surfaces & Coatings Group Technology Department 22 nd January 2015 C. Garion2 Beam Line Interconnection: snapshot of present design principles.
The integration of 420 m detectors into the LHC
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Proposed LCLS-II SCU Schedule Soren Prestemon (LBNL) SCU 3-Lab Review Meeting December 16, 2014.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC Michigan State.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
Cryogenics for SuperB IR Magnets J. G. Weisend II SLAC National Accelerator Lab.
ColUSM #63 18 th September, 2015 D. Ramos, C. Mucher, L. Gentini, H. Prin, Q. Deliege, A. Bastard, J. Hrivnak.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Closing Session Report
LCLS-II Technical Requirements
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
FEL SCU development at APS/ANL
2K Cold Box FDR Introduction
Summary of Session: Magnets and undulators for light sources 2
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Challenges of vacuum chambers with adjustable gap for SC undulators
BDS Cryogenic System RDR Status and EDR Plans
Status of the PANDA Magnet
The 11T cryo-assembly: summary of design and integration aspects
Communication and Documentation Needs exemplified on WP 71
Summary of discussions
Integration and IR Hall
SCU Next Phase Meeting July 8, 2014.
Testing Workshop on Survey and MM
Technical Summary - ANL
Optimum cryomodule length at the ESS
HIE-LINAC status report
A Cold SCU Phase-Shifter
Isotropic View Conceptual Design for MONALISA setup at CERN Magnet
Experimental equipment Edgar L. Black February 17, 2019
Cryostats Some ideas for the new Q1 to Q3 Hi-Lumi WP3 meeting
as a prototype for Super c-tau factory
Linac Diagnostics Commissioning Experience
IR Magnet Design and Engineering Considerations
Presentation transcript:

Summary of discussions Modularity: agree to focus on modular approach due largely to: Emma requirements document Risks - do not want an issue with one magnet to bring FEL down

Features and characteristics good agreement on key features/characteristics concept of three 1.5m units on a rigid cold strong back: 1.5m cold mass assembly=>test=>fiducialization&K-value assembly of 3x1.5m assemblies on a cold strongback via (fixed) mechanical alignment installation of cold mass on a rigid warm structure compatible with longitudinal shrinkage of cold mass on cooldown Agree on concept of sliding beam chamber through aligned magnet system, then weld transition piece on (need to verify that this is possible technically); This constitutes “Plan A”, and its feasibility should be a major focus of the next phase (phase II prototype) At this level the new end-loaded cylindrical cryostat concept shown by Joel, and bottom-loaded box concept developed by Matthaeus, are compatible. plan B is to provide mechanism for independent transverse positioning of the 1.5m sections; concept is envisioned

Additional considerations Details of cold mass support system should be engineered after a review/survey of concepts used on other projects, e.g. FRIB (as shown by Matthaeus), JLAB, FNAL, etc. Should consider windows for cold fiducial access to support verification of cold mass position after installation on the FEL.

Measurements and Alignment Agreed on magnetic alignment concepts: 1.5m measurements used to determine K-value and assure phase errors meet requirements; important that these are done based on mechanical center determined from poles and/or magnetic center, and that cold fiducials are determined 1.5m segments are mechanically aligned on strongback based on the cold fiducials measurements on complete system are used to calibrate end correctors and phase shifters This process needs to be verified/demonstrated in the prototype phase. The assumptions is that the K-value calibration established on the 1.5m sections continues to hold for each (this is much more challenging to do on the 5m object).

Distribution system High-level concept identified need to identify space requirements functionality needs to be documented Sizing has yet to be established, but basis exists from other systems

Segmented SCU Design Satisfies Physics Layout: Layout Is Space Effective And Provides Flexibility

Vertically loaded box concept

Cylindrical end-loading concept

Present Status of our two concepts Common ground: tunnel layout (modular approach) cold mass layout (strongback) cryogenic connections (external dist. sys.) Two alternative packaging concepts: Vertically-loaded box End-loaded cylinder Selection criteria: ease of assembly cost …