Investment project on construction of OSB factory

Slides:



Advertisements
Similar presentations
GOVERNMENT OF KHANTY-MANSIYSK AUTONOMOUS OKRUG - YUGRA Creation of a pilot cluster for the effective APG and the low-pressure gas usage in the Khanty-Mansiysk.
Advertisements

Energy saving and energy efficiency programs of grid organizations of the Russian Federation Maxim Egorov Director of the Department for regulation in.
MoscowMoscow Chuvash Republic Territory – square km Territory – square km Capital – city of Cheboksary Capital – city of Cheboksary Population.
INVESTMENT PROJECT “Modernization of Poultry Complex LLC «Agro Holding “Yurma” The Chuvash Republic INVESTMENT PROJECT “Modernization of Poultry Complex.
UZBEKISTAN INSURANCE AND REINSURANCE MARKET: trends and dynamics Dilshod Sultanov Director of Department of financial analysis and rating.
2 PRESENTATION “ECONOMIC POLICY UNDER CONDITIONS OF REFORMING MARKET OF POWER AND ELECTRIC ENERGY AND IMPLEMENTATION OF INVESTMENT PROGRAM” Archangelskaya.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
The Komi Republic (KR)is the subject of the Russian Federation, a part of the North-West Federal District. Area thousand sq. km. Population -
2012 Brick plant construction with annual capacity of 60 million pieces in Buj municipal district of the Kostroma region.
2012 Investment project of integrated house- building factory construction in Chyukhloma municipal district.
New anti-crisis changes to Russia's tax legislation come into force from 01 January 2009.(Under the Federal law № 224-FZ “On Amendments to Part 1 and Part.
Russian Trading System Stock Exchange Opportunities of Derivatives market for foreign investors.
Furniture shield production in Sharja municipal district of the Kostroma region.
Москва, ул. Пятницкая, д. 31/2, строение 1 тел.: (095) , факс: (095) © 2003 ЗАО АКБ "ЦентроКредит"
JSC “OGK-6” 2009 Financial Results (IFRS) April, 2010.
THE HEART OF INNOVATIONS “ZHIGULI VALLEY” TECHNOPARK IN THE SPHERE OF HIGH TECHNOLOGIES.
2012 Investment project of wasteless timber processing production in Vokhma municipal district.
THE MINISTRY OF ECONOMIC DEVELOPMENT OF THE RUSSIAN FEDERATION The Sixth (6 th ) Meeting of the SME and enterprise policy Subgroup for the EU-Russian Dialogue.
An investment project Creation of a demonstration object of energy effective office building.
Russian Housing Development Foundation as a partner in housing construction sector in Russia.
Investment project of ONIKS Joint Stock Company Mr. Abubakir Uskenbaev Deputy Director General.
STATE SPECIALIZED RUSSIAN EXPORT-IMPORT BANK (EXIMBANK OF RUSSIA) FINANCIAL AND GUARANTEE SUPPORT OF RUSSIAN NON-COMMODITY EXPORT MOSCOW 2015.
1 RAO UES of Russia: Investment Phase of the Reform A. B. Chubais Chairman of the Management Board RAO UES of Russia 10th Annual Investor Conference "Russia:
Construction of tourist complex and yacht club (Stage I) in Kherson. Improvement of recreational and coastal urban beach area in Hydropark (Stage 2 ).
April, Investor presentation.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise for pollution-free fuel (pellets) production in Sharya municipal district.
Production of construction materials: Production of the construction materials on the basis of the equipment MULTIMAT RH 300 (V) A, produced by German.
Creation of industrial complex for extraction and complex waste-free processing of peat with acquisition of soil modificator «AridGrow» for production.
Project “Belkomur” The complex industrial and infrastructural development program of Komi Republic, Perm Territory and Arkhangelsk area.
Conference “RAO “UES of Russia” is an Open Company. On the Threshold of the Reform” 11 December,2001 Moscow Vice-Chairman of the Management Board, RAO.
2012 Investment project of OSB production in Buj of Kostroma region.
September, Investing in Russian Telecoms.
TOMMOT INDUSTRIAL PARK TOMMOT INDUSTRIAL PARK PROJECT GOAL – CREATING NEW PRODUCTION CAPACITY BASED ON INTEGRATED PROCESSING OF LOCAL RAW MATERIALS.
Investment perspectives of localization of Russian and foreign enterprises for mining service equipment and techniques production on the territory of Kirovsk.
L ESSON 9 – S UMMARY Methods of evaluating Investments The Net Present Value (NPV) approach Internal Rate of Return (IRR) Profitability Index (PI) Discounted.
PRESENTATION OF SMOLENSK REGION. Geographical location The total area of the region: 49,8 thousand square kilometers 2 The population size 975,2 thousand.
1 CONFIDENTIAL Project information Contact Construction of Solar Power Plant “Kapshagay Solar” 50MWt in Almaty Region Project profitability for the period.
1 CONFIDENTIAL Acquisition and greenfield investment opportunities in pharmaceutical and medical equipment industries in Kazakhstan November 2015 This.
การบริหารการเงิน และงบประมาณโครงการ Financial and Budget Management for Project Thanapat Pisutsin 1.
1 «BM SAKHALIN» OJSC Sakhalin oblast Complex woodworking operation in the Sakhalin oblast CONSTANTINE EDUARDOVICH BEZNOSYUK General Director at “BM SAKHALIN”
PRESENTATION OF SMOLENSK REGION
2013 Investment project on plywood production in Antropovo municipal district of Kostroma region.
Federal Energy Service Company (FESCO). The potential of power consumption decrease at different stages of energy efficiency projects implementation Existing.
1. Initiator and goals of the project Initiator of the project – the Investment Promotion Agency of Novosibirsk region – a specialized organization for.
ALFRED NOBEL UNIVERSITY DNIPROPETROVS’K THE DEPARTMENT ECONOMY OF ENTERPRISE Performed: student of the V course, group OM-10m Specialty economy of enterprise.
Moscow, 2015 Special investment contract as a new instrument for the stimulation of the production localization Vasily Osmakov, Director of the Department.
Foreign investments into Russia. Tax consequences.
Kostroma, 2014 Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region.
1 Construction of the waste incineration plant with the mini-CHP in Izhevsk 2015 Preliminary presentation.
STRATEGY OF LOCAL GOVERNMENT IN THE WASTE MANAGEMENT IN KIEV
Project Evaluation and Programme Management
Tyumen Region  .
Association "Uzbekcharmpoyabzali"
Operations to Manage Balances in the Treasury Single Account
SPECTR (LLC) Creation of an enterprise for the collection and processing of Sphagnum (peat) moss Project manager: Vladislav L. Malugin.
Feasibility Study for Thermoforming Production Plant
IR NEWSLETTER Company Profile Key Facts Key Messages
Investment proposal on creation of wood processing enterprise in Manturovo municipal district of Kostroma Region Kostroma, 2014.
KVARTS QVARTZ.
For financial institutions
JSC «TASHGIPROGOR».
PRIORITY NATIONAL PROJECT
“ZHIGULI VALLEY” TECHNOPARK IN THE SPHERE OF HIGH TECHNOLOGIES
September 24, 2004 Helsinki, Finland
Construction of Balkhashskaya TPS
Long-term Capacity Market
INVESTMENT - PURCHASE SALES-SHARE PROJECTS USA
JSC «TASHGIPROGOR».
The Role of Private Sector in Capital Budgeting
System of independent assessment of qualifications in the field of AML/CFT Godina Elena Head of the Center for Assessment of Qualifications in the field.
Presentation transcript:

Investment project on construction of OSB factory

Information of JSC «Ugra-Plit» Joint stock company «Ugra-Plit» was established by the Government of Khanty-Mansiysk Autonomous Okrug – Ugra with the purpose of creation an enterprise on added-value wood processing in Sovetskiy Region of KhMAO-Ugra. Capital stock of the company is amounted 1 bln. 250 mln. rubles. The one shareholder of the company is the Government of the Okrug.

The Government of KhMAO-Ugra(100% shares) 1 этап – создание производства ДСП мощностью 150 тыс. м3 в год, в настоящее время данный этап завершен полностью, стоимость составила 2.9 млрд. руб., профинансировано за счет проекта акционерного капитала в размере 1.25 млрд. руб. и кредита ЗАО « ЮниКредит Банк» на сумму 30 млн. евро. 2 этап – расширение производства ДСП и увеличение мощность до 265 тыс. м3 в год, сейчас идет реализация данного этапа. Стоимость этапа составляет 780 млн. рублей, финансируется частично за счет кредитных средств ОАО «Сбербанк России», частично за счет собственной выручки. Срок окупаемости данного этапа – 5,5 лет. 3 этап – дальнейшее развития предприятия, создание производств OSB и смол для плитной промышленности. Management structure The Government of KhMAO-Ugra(100% shares) The Board of directors The General director The governing board of the company is formed and operated in accordance with the Federal Law «On joint-stock companies» The highest management body is the one shareholder – the Government of Khanty-Mansiysk Autonomous Okrug – Ugra, represented by the Department of the management of public property. Also the Board of directors is elected and functioned in the company. The management of current activity is carried out by the one executive authority– the General director. Terms of reference of the governing board are shared in accordance with the charter of the company.

Production site JSC «Ugra-Plit» presents modern production of chip plates with the capacity of 265 thous. m3 per year and the quantity of workers more than 200. The site, on which the production is situated, has significant potential for further development – big square, unoccupied buildings, reservoir of capacity of electricity and gas-supply. According to world experience, it seems advisable to combine plate production (chip plate, OSB, MDF) on the one site. It allows to use common infrastructure, labour force, storage area much more effective. Construction of an OSB factory on the given production site is the most attractive, taking into account Russian market saturation of MDF.

Efficiency Construction of two plate enterprises on the one site will allow to process timber, cut in the Okrug, in value added products without wood waste. Construction of OSB factory will have synergy effect, because each production increases the efficiency of the other one. The value of the project on construction of OSB factory with the capacity of 200 thous. m³ per year amounts about 5,5 bln.rub., including 35 mln. Euro – complex delivery of production line of the German company Siempelkamp, comprising equipment of the companies Pallmann, Ness. construction of OSB factory will allow to create to 140 working places. Project payback period is 6 years.

INDICATORS OF PROJECT PERFOMANCE рр INDICATORS OF PROJECT PERFOMANCE Project life cycle – 25 years; Break-even point– 36 months. Indicators Indicator characteristic Effectiveness measure Indicator values NPV - net present value, thous.rub. Current value of accumulated financial effect from project implementation More than 0 1 100 158 IRR - internal rate of return, % Possible level of credit rate IRR > r 19,6 DPP – disposit period of payback, years The period while discount sum of amortization and net profit will reach to the total volume of project investment Х 8.41 PI - productivity index Relative return on investment More than 1 1,22 NPVR - Net Present Value of Returns More than discount rate 15% *r – discount rate– 15 T – project target date– 10 years

OSB production in Russia OSB plates are modern construction material, for which demand is increasing rapidly, OSB market in Russia is measured at 1 mln. m³ in 2014. Russian production is less than 40%, and the rest demand is satisfied at the import’s cost. Consequently, the planned production will be directed to import substitution. Already built Russian factories on OSB production will primarily satisfy demand of the central Russian regions.. It is possible that the situation in Ural and Siberia won’t cardinally change and plate deficit will remain until the production startup in the region.

Project implementation The study of wood material base of Berezovskiy, Kondinskiy, Oktyabrskiy and Sovetskiy Districts of KhMAO-Ugra was undertaken. This study showed sufficient wood material base for OSB production. (FSUE «Roslesinforg»); Project documentation is developed; Project feasibility study is developed; Preliminary negotiations with banks were conducted; Equipment procurement contracts were signed in Oktober, 2014; Favorable state expert's conclusion on project documentation was received in February, 2015.

General director Nikulin Maxim Sergeevich The Construction № 1, the industrial base № 2, the North Industrial zone, Sovetskiy, KhMAO – Ugra, Russia, 628240 Tel: +7 (34675) 3-79-90, 3-44-35 E-mail: av@ugra-plit.ru General director Nikulin Maxim Sergeevich Financial director Verhovskiy Anton Sergeevich