VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS

Slides:



Advertisements
Similar presentations
From… Maintenance Technical Advisory Guide (MTAG) Chapter 7 Fog and Rejuvenating Seals.
Advertisements

POLYPATCH. PolyPatch: What is it? Hot-applied, pourable, self- adhesive patching material Hot-applied, pourable, self- adhesive patching material has.
Comal County Chip Sealing June 26, 2007.
2014 Chip Seal Training ODOT Specifications
Module 4-2 : Joint Sealing
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
Test Result Relationships
TOPIC OF THE DAY Flexible Pavement Distresses/Failure Of Structure.
Intro to our RoadRedi Team Trevor Chisholm- General Manager Patrick Grey- Estimator Steve Flemming- General Superintendant Pat Benoit- Superintendant.
Regional Asphalt Seminars Pavement Wedge Guidelines and Specifications EMMETT R. HELTZEL, P.E. STATE MAINTENANCE ENGINEER.
Pavement Design Terms and Concepts
District 8-0 QA Review Trends Summary Documentation and Certification Project certifications for materials should be reviewed as they.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Fog Seals, Sand Seals, Scrub Seals, and Rejuvenators.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
Surface Rehabilitation Treatments
A mixture of asphalt emulsion, crushed aggregate, mineral filler, water and other additives properly proportioned, mixed and spread as a surface treatment.
HMA Construction Program
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
CIVL 598 Asphalt Paving Materials Asphalt Rubber.
Asphalt Quality Assurance Program
Placing Quality Concrete
Pavement Maintenance II
Materials Specifications & Virginia Test Methods (VTM’s) 2014 Regional Asphalt Seminars Rob Crandol, P.E. Statewide Asphalt Program Manager.
Pavement Distresses Flexible Pavement
Performance & Distress of Flexible Pavement Serviceability/Performance Concept.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
PAVEMENT MAINTENANCE 1 Part 3: Potholes and Cracks Idaho Roads Scholar Program.
Working Successfully With Property Managers: An Interactive Engagement
Micro-surfacing SRF Consulting Group, Inc. SemMaterials
Paving & Surfacing Module #6 Prepared by Dr. Randy R. Rapp July 2005.
SESSION 9 Construction Considerations. Objectives  Describe key aspects of: Prepaving operations Paving operations Postpaving operations  Understand.
Session 4 Preventive Maintenance Treatments. Learning Objectives 1.Identify typical preventive maintenance techniques used on HMA and PCC pavements 2.Identify.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
Surface Treatments #2.
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
Extending Performance with Proper Asphalt Compaction
SPECIFICATIONS Ryan Johnson Specification Engineer
Delivery Module 5. Delivery  End dump operations  Belly dump operations  Determining number of required trucks.
Alabama Asphalt Pavement Association
David P. Shiells, P.E. District Materials Engineer
Pavement Preservation Techniques Used in Virginia
Thin Hot Mix Asphalt Overlays PennDOT Research Findings
Update from FHWA Emulsion Task Force
City of Abilene Pavement Condition Survey 2017 Results and Discussion
Uniform Paving Platform A Contractor’s Perspective
Surface Preparation before laying Hot Mix
Dedicated to Quality Partners In Quality
QC Document Update Todd Shields, INDOT.
Pavement condition index calculation
Panel discussion Date.
Operation, Production, and Trouble Shooting
Longitudinal Joint Construction – Why Straightness Matters
Introduction to Pavement Design
Pavement Preservation
Considerations FOR more durable hma pavements
Surface Treatments #2.
Document Development for Metro Project: Performance-based Procurement Asphalt Overlay for Programmed Maintenance 17/01/2019.
Quality Assurance for Emulsified Asphalt Surface Treatments
Materials and Tests Engineer
Pavement Structural Analysis
Prime Factors for Successful Preservation Treatments
NRRA Pavement Workshop 2019
Presentation transcript:

VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS Todd Rorrer Regional Field Engineer CO Asphalt Programs 2017 Asphalt Regional Seminars

VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS Thin Hot Mix Asphalt Concrete Overlay (THMACO) Surface Treatments/ Seal Coats Slurry Surfacing and Micro Surfacing Cape Seal (Surface Treatment and Slurry Combined) SM-4.75 Introduction, Project Communication, & Safety

Thin Hot Mix Asphalt Concrete Overlay

THMACO Thin Hot Mix Asphalt Concrete Overlay Preventative Maintenance Overlay and Bonding Agent for Composite Pavement Rehab Requires a specialized spray-bar paver or hot applied polymer modified tack Tack application rate is .25 +/- (0.03) Gal/sq yd Delivery temperature is 315oF +/- 15oF measured in the paver hopper Base Temperature 50oF or higher Accepted based on Visual Inspection Rejection requires remove and replace No Price Adjustments New for 2017 PG Binder has been corrected to PG 64V-28 One year warranty against raveling and delamination By Special provisions – Not in Standard Specification at this time Introduction, Project Communication, & Safety

THMACO Laydown and Paver Introduction, Project Communication, & Safety

THMACO Laydown and Paver Introduction, Project Communication, & Safety

THMACO Laydown and Paver The most essential part of project planning and organization is communication. Effective communication is vital to all elements of project organization Discuss project documents versus contract documents. Technicians must know which materials supersede others. Introduction, Project Communication, & Safety

THMACO: Proper mat with proper overspray Introduction, Project Communication, & Safety

Potential Issues THMACO Introduction, Project Communication, & Safety The most essential part of project planning and organization is communication. Effective communication is vital to all elements of project organization Discuss project documents versus contract documents. Technicians must know which materials supersede others. Introduction, Project Communication, & Safety

Bleed off: High tack application and overspray can bleed with heavy rains following laydown Introduction, Project Communication, & Safety

Delamination: Delamination can occur with stuck nozzles on paver Patching or milling may be appropriate Introduction, Project Communication, & Safety

Raveling and Segregation Delivery Temperature is critical Raveling and segregation will occur Introduction, Project Communication, & Safety

Reflective crack and spall, with 2 weeks of traffic Pavement cracks or joints ¼ inch or more in width shall be cleaned and filled with a sealant material conforming to the Special Provision For Sealing Cracks in Asphalt Concrete Pavements or Hydraulic Cement Concrete Pavement. Quantities and payment will be according to the Special Provision For Sealing Cracks in Asphalt Concrete Pavements or Hydraulic Cement Concrete Pavement. Introduction, Project Communication, & Safety

VDOT Surface Treatments Generically known as Chip Seals The most essential part of project planning and organization is communication. Effective communication is vital to all elements of project organization Discuss project documents versus contract documents. Technicians must know which materials supersede others. Introduction, Project Communication, & Safety

VDOT Surface Treatments Seal Treatment: One Application of liquid asphalt and one application of cover aggregate Modified Single Seal: Two applications of liquid asphalt one application of cover and one application of blot fine aggregate Modified Double Seal: Three applications of liquid asphalt, two applications of cover and one application of blot fine aggregate Introduction, Project Communication, & Safety

Surface Treatments Appropriate uniformity No streaks Appropriate amount of cover loss with traffic Introduction, Project Communication, & Safety

Proper Surface Texture After Traffic Introduction, Project Communication, & Safety

Potential Issues Surface Treatment Introduction, Project Communication, & Safety

Emulsion Application Rate Delamination: Surface preparation Emulsion Application Rate Ensure aggregate compatibility Introduction, Project Communication, & Safety

Streaking Emulsion application rate Calibrate the Distributor Calibrate the chip spreader Ensure aggregate compatibility Introduction, Project Communication, & Safety

Distributor Calibration Emulsion application rate Spray bar height Speed Required by specification to be performed in front of the Engineer per project Introduction, Project Communication, & Safety

Distributor Calibration Once height is established, verify the application rate with plate test Required by specification to be performed in front of the Engineer per project Introduction, Project Communication, & Safety

Surface Treatments Bond breakers Introduction, Project Communication, & Safety

Slurry Seals and Micro Surfacing Introduction, Project Communication, & Safety

Slurry Seals and Micro Surfacing Introduction, Project Communication, & Safety

Slurry Seals and Micro Surfacing Mixture of emulsified asphalt and fine aggregate Placed in thin lifts to protect and seal current riding surface Micro Surfacing is a slurry seal using Latex Modified emulsions and additional lab design requirements Introduction, Project Communication, & Safety

Placed in thin lifts to protect and seal current riding surface

Slurry Seals and Micro Surfacing Delamination: Poor surface preparation Gradation and AC content too tight Introduction, Project Communication, & Safety

Surface Preparation and / or Gradation Control Introduction, Project Communication, & Safety

Cape Seals Combination of a Surface Treatment and Slurry Seal Surface treatment is placed first Allowed to cure for at two weeks by specification Surface cleaned and Slurry applied Introduction, Project Communication, & Safety

Cape Seals Combination of a Surface Treatment and Slurry Seal Suburban Secondary in Chesterfield County, VA Completed Summer of 2016 Current Condition: February 2017 Introduction, Project Communication, & Safety

Cape Seals Suburban Secondary in Chesterfield County, VA Completed Summer of 2016 Current Condition: February 2017 Introduction, Project Communication, & Safety

Cape Seals Suburban Secondary in Chesterfield County, VA Completed Summer of 2016 Current Condition: February 2017 Introduction, Project Communication, & Safety

SM-4.75 Preventative Maintenance Overlay

SM-4.75 Finer Superpave Mix placed at .75 to 1.25 inches Used with A, D and E mixes Minimum of three breakdown passes Density based on roller pattern and control strip, however CS cores are not taken Material temperatures are critical, best practices are to work hot to warm in the field May be rejected based on visual inspection Platform is critical Introduction, Project Communication, & Safety

New for 2017 – SP Dated July 22, 2016 Last Paragraph of Section VII: The minimum laydown temperatures: for SM-4.75A and SM-4.75D shall not be less than 270°F. For SM-4.75E, the minimum laydown temperature shall not be less than 290°F.    VIII. Weather Restrictions  SM-4.75 mixture shall be placed only when the ambient and surface temperature are 50 degree F or above. The Contractor shall employ a Material Transfer Vehicle (MTV) during the placement of SM-4.75 mixtures for the ambient and/or surface temperature between 50-60 degree F.

Smooth uniform surface that protects the underlying pavement

SM-4.75 Platform is critical: Curb and gutter sections need full width milling Introduction, Project Communication, & Safety

Edge Milling, can lead to issues… Curb and gutter sections need full width milling Introduction, Project Communication, & Safety

Edge Milling, can lead to issues… Introduction, Project Communication, & Safety

SM-4.75 It is much better to plane the entire platform…. Introduction, Project Communication, & Safety

Patch out weak spots Introduction, Project Communication, & Safety

Patch out weak spots Introduction, Project Communication, & Safety

SM-4.75 Watch out for over-runs Get a feel for quantities Introduction, Project Communication, & Safety

Thank You Introduction, Project Communication, & Safety