Chairman of Road Infrastructure Agency Management board

Slides:



Advertisements
Similar presentations
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Great Western Corridor Feasibility Study
Bulgaria’s strategic road infrastructure challenges.
Why London needs the Thames Tunnel IEMA Conference 2011 Optimising Infrastructure within environmental limits Tuesday 15 November 2011.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
OPERATIONAL PROGRAMME ON “TRANSPORT” 2007 – 2013 Vessela Gospodinova Deputy minister of transport Nearer and closer.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
ROAD INFRASTRUCTURE PROJECTS IN BULGARIA Eng. Lazar Lazarov Chairman of the Management Board November, 2012 REPUBLIC OF BULGARIA MINISTRY OF REGIONAL DEVELOPMENT.
TRANSPORT AND ITC PRIORITIES Nikolina Angelkova Minister of Transport, Information Technology and Communications MINISTRY OF TRANSPORT, INFORMATION TECHNOLOGY.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
“Lessons Learnt” workshop on 18 th June, Sofia Project Implementation Support Service Agreement (PISSA) TA BG BSF S6 - Capacity building István.
II Meeting of the Monitoring Committee of OP “Transport and Transport infrastructure” June 2015 Pravets.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
JASPERS – Supporting Urban Transport Projects Ministry of Regional Development, Czech Republic JASPERS Seminar, Prague - 28th November 2007 Dr. Joachim.
Time schedule for ex ante evaluation and Strategic Environmental Assessment (SEA) Romania-Bulgaria Cross-Border Cooperation Operational Programme
EAST DON TRAIL ENVIRONMENTAL ASSESSMENT Project Overview Ward 31 Ravine Meeting November 4, :00 to 9:00 p.m. Presteign-Woodbine United Church.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
River Basin Management Plans & Strategic Environmental Assessment & Appropriate Assessment Ray Spain Local Authorities Workshop, 3 rd December 2008.
1 Homologues Group Meeting Slovenia, October 2009 Republika SlovenijaEuropean Union Ljubljana, October 2009 System evaluation and sampling – first.
PPP in Lithuania March, 2011.
REHABILITATION AND DEVELOPMENT OF NAVIGATION ON THE SAVA RIVER.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
INFRASTRUCTURE COMPANY
1 Cohesion Policy Adam Abdulwahab Evaluation network meeting Brussels, 21 September 2009 Ex post evaluation of cohesion policy programmes
Operational Programme on Transport Coordination of Programmes and Projects Directorate December 2007 Ministry of Transport.
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
Delivering value to the NHS Delivering value to the NHS 1 © NHS Shared Business Services Ltd 2011 Transforming and Modernising Family Health Services in.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS MANAGING AUTHORITY FOR COHESION FUND (REGULATION 1164/94) MANAGEMENT OF PROJECTS, FINANCED BY COHESION.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Project # 1 Rikoti-Zestaponi Highway May, Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.
ХVIII Meeting of the Monitoring Committee of Operational programme “Transport” – 3 June 2015 Pravets.
Johnson Street Bridge Replacement Project Update Governance & Priorities Committee Engineering Department July 9, 2009.
Munich, 30 September 2010 Road Infrastructure in Bulgaria.
Priorities in the sector “Transport”
ХVII Meeting of the Monitoring Committee of Operational programme “Transport” November 2014 г. Pravets.
Structural Funds Managing Authority – Ministry of Finance 1 Technical Assistance Ilze Aleksandroviča Head of Control and Development Division EU Funds.
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Chisinau, October 28-31, 2008 Ruxandra Floroiu,
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
For a better place to live! OPERATIONAL PROGRAMME “REGIONS IN GROWTH” Investing.
ХVI Meeting of the Monitoring Committee of Operational programme “Transport” June 2014 Velingrad.
E LECTRIFICATION OF L ATVIAN RAILWAY NETWORK 1. O PERATIONAL P ROGRAMME FOR THE EU F UNDS P ROGRAMMING P ERIOD «G ROWTH AND EMPLOYMENT » 6.2.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
ROAD INFRASTRUCTURE SAFETY MANAGEMENT DIRECTIVE (RISM) Harry Cullen SPM Road Safety, National Roads Authority, Ireland Chairman of CEDR Technical Group.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
MAIN PRIORITIES IN THE BULGARIAN TRANSPORT POLICY Danail Papazov Minister of Transport, Information Technology and Communications 13 March 2014 Sofia.
Integrity Pact Partner Event 17 June 2016 Brussels Eng. Lazar Lazarov Road Infrastructure Agency.
Federal Ministry for the Environment, Nature Conservation and Nuclear Safety, Germany Environment Agency (UBA), Germany Federal Agency for Nature Conservation.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
PRESENTATION OF MONTENEGRO
Environmental Safeguards
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
TRANSPORT AND ITC PRIORITIES
Inese Vilcane Social inclusion department Senior expert
Monitoring Committee of OP “Transport and Transport infrastructure”
EIA approval process, Management plan and Monitoring
VI Monitoring Committee
Introduction to JASPERS and reflections on Sustainable Roads Kristian DUUS, JASPERS Roads Division, Vienna Regional Office.
Sharing Lessons from Integrity Pact Experience
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
Sylvia Barova Unit B.3-Nature, DG ENV Habitats Committee
WORKSHOP 17th Sept 2008 EUROPEAN COMMISSION
Bulgaria – Country Report
Liquefied Natural Gas Terminal in Lithuania
Strategic Road Projects
Road Safety in Azerbaijan: Challenges and Way Forward
SCREENING SCOPING SEA QUALITY CONTROL DECISION
REPUBLIC OF CROATIA MINISTRY OF ENVIRONMANTAL AND NATURE PROTECTION
Presentation transcript:

Chairman of Road Infrastructure Agency Management board    Projects under Operational programme “Transport and transport infrastructure” 2014-2020 Eng. Lazar Lazarov Chairman of Road Infrastructure Agency Management board 28 - 29 November 2016 Sofia

“Kalotina – Sofia” MW Lot 1 Western Arc of Sofia Ring Road, Phase 2 Activity Contractor Contract Value VAT included Construction “European roads“ ASD 101 999 866,65 BGN OVERPASS BLVD. “LOMSKO SHOSE"

Motorway “Struma” Lot 3.1 from Blagoevgrad to Krupnik    Motorway “Struma” Lot 3.1 from Blagoevgrad to Krupnik from km 359+000 to km 366+000 and from km 370+460 to km 376+000 Activity Contractor Contract Value VAT excluded Design and Construction „АМ Струма 3.1“ ASD 154 999 999,92 BGN Supervision „SN АМ „Струма Лот 3.1“ ASD 1 695 249,00 BGN

Motorway “Struma” Lot 3.1 - “Jeleznitsa” tunnel    Motorway “Struma” Lot 3.1 - “Jeleznitsa” tunnel Procedures are carried out under the PPA with the subject: - Design and construction of the motorway "Struma“ Lot 3.1 Jeleznitsa tunnel - Supervision of the design and construction of the motorway "Struma" Lot 3.1 Jeleznitsa tunnel

Motorway “Struma” Lot 3.3 from Kresna to Sandanski from km 397 +000 to km 420 + 624 = 420 + 628 478 km Overall length: 23.6 km Activity Contractor Contract Value VAT excluded Design and Construction Consortium “Struma” - Lot 3.3 234 123 012,00 BGN Supervision "Patinvest-engineering" JSC 2 998 161,28 BGN

Motorway “Struma” Lot 3.3

An archaeological site 16 km 419 + 670 to km 420 + 384 village Damyanitsa, municipality of Sandanski, Blagoevgrad

Finds of the preliminary exploring archaeological site 16 km 419 + 670 to km 420 + 384 VI – V century BC III-IV century

   Application Form for Struma Motorway Project – Lot 3.1, Lot 3.3 and Zheleznitsa Tunnel Received comments and remarks from Jaspers - May 2016 Agreed with Jaspers updated traffic model and CBA Submission for Jaspers’ review of the updated Application form and supporting documents – 19 December 2016

Struma Motorway Lot 3.2 from Krupnik to Kresna    Struma Motorway Lot 3.2 from Krupnik to Kresna Lot 3.2 falls in the environmentally sensitive and technically difficult construction area The intensive traffic on the road through the Kresna Gorge increases the risk of traffic accidents involving casualties. For Struma Motorway Lot 3.2 passage through the Kresna Gorge various technical alternatives were developed. Four alternatives (objects of the new EIA) had been currently prepared: 15.4 km long tunnel (2008-2014) Dual Carriageway (2014) Dual Carriageway (2015) Eastern Bypass (2016)

Long Tunnel Alternative (2008-2014)    Long Tunnel Alternative (2008-2014)

Dual Carriageway Alternatives (2014-2015)    Dual Carriageway Alternatives (2014-2015)

Eastern Bypass Alternative (2016)    Eastern Bypass Alternative (2016) 2 lanes and with a total width of 10.5 m The new carriageway bypasses the Kresna Gorge from the east and the other carriageway uses the existing road E-79 (I-1). The existing road will be rehabilitate and mitigating measures to limit the risk of mortality of wild animals and fragmentation of their habitats will be implement

   EIA Procedure Developed updated Terms of Reference for the scope and content of the environmental impact assessment (EIA) of the investment proposal - "Improved layout of Lot 3.2 of Struma Motorway“ will be issued. Consultations with the specialized administrations, stakeholders and public were performed The statements had been received and processed. The reference for consultations is under preparation as the ToR for EIA have been precised and supplemented The submission of the ToR for the EIA for consultation with the competent authorities (MoEW and Ministry of Health) will occur in December 2016 Expected preparation of the first draft of the EIA /AA Report - March 2017 Submission of the EIA/AA Report in the MoEW for assessment of their quality Public consultation on the EIA/AA Report after positive assessment of their quality by the MoEW.

Contract Value VAT included Preparation of project: Road I-1 (E-79) Vidin-Montana-Vratsa, approximate length: 126 km Activity Contractor Contract Value VAT included DESIGN І-st section – Vidin- Dimovo, from km 3+757 to km 39+480 ІІ-nd section – Dimovo-Bela-Ruzhintsi, from km 39+480 to km 61+750 „VIA PLAN–BURDA” ASD 1 045 081,28 BGN ІІІ-rd section – Ruzhintsi-Montana, from km 61+750 to km 102+060 ІV-th section – Montana-Vratsa, from km 111+305 to km 140+008 "Inzhkonsultproekt" Ltd. 1 092 986,16 BGN

Preparation of project: Road I-1 (E-79) Vidin-Montana-Vratsa, approximate length: 126 km Activity Contractor Contract Value VAT included Environmental Impact Assessment "Dango Project Consult" Ltd. 60 372,00 BGN Auditing road safety on phase preliminary project and technical project І-st section – Vidin- Dimovo, from km 3+757 to km 39+480 ІІ-nd section – Dimovo-Bela-Ruzhintsi, from km 39+480 to km 61+750 „Safe roads ” ASD 10 000,00 BGN ІІІ-rd section – Ruzhintsi-Montana, from km 61+750 to km 102+060 ІV-th section – Montana-Vratsa, from km 111+305 to km 140+008 „Road safety ” ASD 14 400,00 BGN Start of design activity – July 2013 Deadline for preparation of technical projects – July 2018

THANK YOU FOR YOUR ATTENTION!