PRODUCTION/ DEPLOYMENT

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

C.B. Cochrane 1 Jan 2009 The 5000 documents have been issued as a directive, two directives, a directive and an instruction, a directive and a regulation,
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
Ms. Nancy Dolan CNO N Human Systems Integration in DoD Acquisition.
Phase B Exit Criteria Issues Resolved or Addressed Technical Reviews / Readiness Reviews, Audits Initiate Milestone C Program Review Planning Process Initiate.
“Common Process for Developing Briefings for Major Decision Points” INSTRUCTIONS Provide Feedback via to: Lois Harper PEO C4I and Space
What are MRLs ? Alfred W. Clark Dawnbreaker, Inc.
EMIS 7307 T&E Part 2 1 Documents in flux. MNS - Mission need statement –Non system specific, a needed capability. Being replaced by Initial Capabilities.
Initiate Technology Development Finalize AoA Plan, AS, ICD, TDS, Develop CDD, and TEMP Initiate Milestone B Program Review Planning Process Initiate Acquisition.
Configuration Management Non Government Std: EIA Standard-649 “A management process for establishing and maintaining consistency of a product’s performance,
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
The Defense Acquisition Management System 2009 Implementing DoDI 5000
Presented at the 2nd Annual DAU-South CONTRACTING CONFERENCE & EXPO
Life Cycle Logistics.
1 MRL Assist Tool Website Access the MRL Assist Tool at
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
System Integration Exit Criteria Issues Resolved or Addressed Preliminary Design Review/Critical Design Review, Audits Initiate Design Readiness Review.
1 3 Dec 2008 Changes from the May 2003 DoDI Policy Flowing from Numerous New/Revised sections of Public Law since 2003 (some with Multiple Requirements)
PEO C4I and SPACE FULL-RATE PRODUCTION REVIEW TIMELINE
Lecture 2.1b: DoD Acquisition Process (SEF Ch 2)
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
Initiate User Needs And Technology Opportunities Finalize ICD, AoA Plan and Develop TDS Initiate Milestone A Program Review Planning Process Initiate Acquisition.
Business, Cost Estimating & Financial Management Considerations
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the major requirements management activities during the acquisition process from Milestone A to Milestone B Explain the purpose.
Lesson Objectives Determine the key Requirements Manager activities and the role of the ICD leading up to the MDD and during Materiel Solution Analysis.
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities July 12, 2016.
Life Cycle Logistics.
MNS - Mission need statement
Competitive Prototyping – the New Reality
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
DAE CAE PEO PM OIPT Acquisition Category (FY14 $) ACAT ID
Milestone A to Milestone B Requirements Management Activities
Milestone A to Milestone B Requirements Management Activities
DAG CH 3 Figure 11: Weapon System Development Life Cycle
ISA 201 Intermediate Information Systems Acquisition
CPFF,CPIF,CPAF FPIF FFP,FPIF FFP CPFF FPIF,FPAF FFP FP (EPA)
DAG CH 3 Figure 17: Weapon System Development Life Cycle
DAG CH 3 Figure 23: Weapon System Development Life Cycle
DoDI Approved 8 December 2008
Milestone A to Milestone B Requirements Management Activities
MDD to Milestone A Requirements Management Activities
Materiel Development Decision (MDD) to Milestone A (MS A)
Materiel Development Decision (MDD) to Milestone A (MS A)
Information Required for Milestone and Decision Reviews
CBA ICD CDD CDD CPD MDA MDA MDA MDA MDA AoA RVA RVA RVA
DAG CH 3 Figure 13: Weapon System Development Life Cycle
DAG CH 3 Figure 19: Weapon System Development Life Cycle
Product Support Considerations
Adjustments required for program or funding changes Options
DAG CH 3 Figure 18: Weapon System Development Life Cycle
DAG CH 3 Figure 28: Weapon System Development Life Cycle
DAG CH 3 Figure 15: Weapon System Development Life Cycle
Technology Maturation & Manufacturing Development Phase
8 Tech Processes Drive Acquisition
The Department of Defense Acquisition Process
Perspectives on Transforming DT and OT Industry-Government Roundtable
DAG CH 3 Figure 21: Weapon System Development Life Cycle
Medical Development Program
DAG CH 3 Figure 27: Weapon System Development Life Cycle
DAG CH 3 Figure 22: Weapon System Development Life Cycle
DAG CH 3 Figure 25: Weapon System Development Life Cycle
Presentation transcript:

PRODUCTION/ DEPLOYMENT The 5000 Process 1975 Major Programs $50M RDT&E or $200M Procurement (FY1972 dollars) Full-Scale Engineering Development Decision FULL-SCALE ENGINEERING DEVELOPMENT VALIDATION PHASE PRODUCTION/ DEPLOYMENT Program Initiation Production & Deployment Decision

The 5000 Process 1977 I II III Phase I Phase II Phase III Phase 0 Major Programs $75M RDT&E or $300M Procurement (FY1972 dollars) Approval to Enter Demonstration & Validation Phase I I DEMONSTRATION & VALIDATION Approval to Enter Full-Scale Engineering Development FULL-SCALE ENGINEERING DEVELOPMENT Phase II II Approval to Enter Production & Deployment PRODUCTION & DEPLOYMENT Phase III III EXPLORATION OF ALTERNATIVE SYSTEM CONCEPTS Phase 0 MENS* Approved Program Initiation *Mission Element Need Statement (MENS)

The 5000 Process 1980 I II III Phase III Phase 0 Phase I Phase II Major Programs $100M RDT&E or $500M Procurement (FY1980 dollars) I II Approval to Enter Production & Deployment PRODUCTION & DEPLOYMENT Phase III III Phase 0 Phase I Phase II CONCEPT EXPLORATION DEMONSTRATION & VALIDATION FULL-SCALE DEVELOPMENT MENS Approved Program Initiation Approval to Enter Demonstration & Validation Approval to Enter Full-Scale Development SECDEF Decision Memorandum (SDDM) implemented to document milestone decisions

The 5000 Process 1982 I II III Phase 0 Phase I Phase II Phase III Major Programs $200M RDT&E or $1B Procurement (FY1980 dollars) I II III Phase 0 Phase I Phase II Phase III CONCEPT EXPLORATION DEMONSTRATION & VALIDATION FULL-SCALE DEVELOPMENT PRODUCTION & DEPLOYMENT Approval of JMSNS In PPBS is Program Initiation Concept Selection Program Go-Ahead Production Decision (Delegated To Components) May proceed into FSD with delayed MS II – contracts must be written so program can be terminated at least cost to government

The 5000 Process 1985 I II III Phase 0 Phase II Phase I Phase III Major Programs $200M RDT&E or $1B Procurement (FY1980 dollars) Phase 0 I II III FULL-SCALE DEVELOPMENT Phase II DEMONSTRATION & VALIDATION Phase I PRODUCTION & DEPLOYMENT Phase III CONCEPT EXPLORATION Approval of JMSNS In PPBS is Program Initiation Concept Selection Program Go-Ahead Production Decision (May Be Delegated To Components) May proceed into FSD with delayed MS II – contracts must be written so program can be terminated at least cost to government

The 5000 Process 1987 I II III IV V Phase 0 Phase I Phase II Phase III Major Programs $200M RDT&E or $1B Procurement (FY1980 dollars) I II III Logistics Readiness & Support Review IV Major Upgrade\ Replace Decision V Phase 0 Phase I Phase II Phase III PRODUCTION, FIELDING/ DEPLOYMENT, & OPERATIONAL SUPPORT Approval For Full-Rate Production & Deployment CONCEPT EXPLORATION/ DEFINITION CONCEPT DEMONSTRATION/ VALIDATION FULL-SCALE DEVELOPMENT & LRIP Approval to Enter Full- Scale Development Approval of JMSNS In PPBS is Program Initiation Approval to Enter Concept Demonstration/ Validation DSARC replaced by JRMB; JRMD replaced by DAB

The 5000 Process 1991 II III I IV Phase II Phase I Phase 0 Phase III Major Programs $300M RDT&E or $1.8B Procurement (FY1990 dollars) Determination of Mission Need II III I Phase II Phase I Phase 0 CONCEPT EXPLORATION/ DEFINITION Major Modification Approval IV PRODUCTION & DEPLOYMENT OPERATIONS SUPPORT Phase III Phase IV Concept Demonstration Approval DEMONSTRATION & VALIDATION Development Approval ENGINEERING & MANUFACTURING DEVELOPMENT Approval to Conduct Concept Studies Production Approval Acquisition Decision Memorandum (ADM) signed by USD(Acq) replaces SDDM Provision for delayed MS II eliminated ACAT structure created JROC approved MNS replaces SECDEF approved JMSNS at MS 0

The 5000 Process 1996 I II III Phase I Phase 0 Phase II Phase III Major Programs $300M RDT&E or $1.8B Procurement (FY1990 dollars) Approval to Begin a New Acquisition Program PROGRAM DEFINITION & RISK REDUCTION Phase I I II III Phase 0 Approval to Enter Engineering & Manufacturing Development ENGINEERING & MANUFACTURING DEVELOPMENT Phase II PRODUCTION, FIELDING/ DEPLOYMENT, & OPERATIONAL SUPPORT Phase III Demilitarization & Disposal Determination of Mission Need CONCEPT EXPLORATION Approval to Conduct Concept Studies Production or Fielding/ Deployment Approval Program Initiation moved to Milestone I AIS acquisition programs folded into the DoD 5000 process

Technology Opportunities The 5000 Process 2000 Major Programs $365M RDT&E or $2.19B Procurement (FY2000 dollars) User Needs & Technology Opportunities B Approval to Enter Concept & Technology Development CONCEPT & TECHNOLOGY DEVELOPMENT A Decision Review Approval to Enter LRIP/ Production & Deployment PRODUCTION & DEPLOYMENT OPERATIONS & SUPPORT C FRP Decision Review Approval to Enter Systems Development & Demonstration SYSTEM DEVELOPMENT & DEMONSTRATION Interim Progress Review Program Initiation at MS B Commitment to Production at MS C (LRIP) Evolutionary Acquisition (EA) becomes preferred approach

Technology Opportunities The 5000 Process 2003 Major Programs $365M RDT&E or $2.19B Procurement (FY2000 dollars) User Needs & Technology Opportunities A B C CONCEPT REFINEMENT TECHNOLOGY DEVELOPMENT Approval to Enter Technology Development SYSTEM DEVELOPMENT & DEMONSTRATION PRODUCTION & DEPLOYMENT OPERATIONS & SUPPORT Design Readiness Review FRP Decision Review Concept Decision Approval to Enter Systems Development & Demonstration Approval to Enter LRIP/Production & Deployment MNS becomes ICD approved prior to Concept Decision

Technology Opportunities The 5000 Process 2003 Major Programs $365M RDT&E or $2.19B Procurement (FY2000 dollars) User Needs & Technology Opportunities A B C CONCEPT REFINEMENT TECHNOLOGY DEVELOPMENT SYSTEM DEVELOPMENT & DEMONSTRATION PRODUCTION & DEPLOYMENT OPERATIONS & SUPPORT Design Readiness Review FRP Decision Review Concept Decision Approval to Enter Technology Development Approval to Enter Systems Development & Demonstration Approval to Enter LRIP/Production & Deploymentl MNS becomes ICD approved prior to Concept Decision