ACT supply security project

Slides:



Advertisements
Similar presentations
Questions about AVR & PSS
Advertisements

Managing Director, HVPD Ltd
Wetland Habitats: EMWMF Haul Road Remediation In 2005 a large haul road was constructed that resulted in loss of wetlands. To compensate for those losses,
1 Broken Hill Solar Plant Community Consultative Committee July 2014 Date: 14 July 2014.
RISER SETUP NOTE: All levels of the riser are connected using the same method:
Santee Cooper’s 2013 Formula Rate Transmission Tariff presented via WebEx May 28, 2013.
Integrating Multiple Microgrids into an Active Network Management System Presented By:Colin Gault, Smarter Grid Solutions Co-Authors:Joe Schatz, Southern.
NRC Cyber Security Regulatory Program Development Background ANSI Nuclear Energy Standards Coordination Collaborative (NESCC) Meeting November 3, 2014November.
Slide 1 UNCLASSIFIED Breaker Operation Arc Flash Breakout Group EFCOG Electrical Safety Workshop – July 18, 2014.
Steps to Compliance: Electronic Devices Overview PRESENTED BY.
BLACKOUT POWER OUTAGE By Masih Madayeni Class 3/6 English Presentation.
Lyndonville Electric Department Feasibility Analysis Review December 2,
Phoenix Convention Center Phoenix, Arizona When Prevention and Preparation May Not be Enough: Resilience and Recovery for the Electricity Sub-Sector Operational.
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
AT&T Mobility Network Optimization Michael Van Weelden Director – SCM – AT&T Mobility July 14, 2007.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Care Act – Programme Update September 2015 CHILDREN’S & ADULTS’ SERVICES.
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
1 Issues affecting the evaluation of the beneficial effect of new technologies and ways to solve these issues. Prof. Dr. Viliam Sarian, NAN RA Acad., Vice-Chairman.
Block Diagram of a Typical Electric Supply System
Regulatory framework Julie Swan Associate Director, Regulatory Policy and Vocational Qualification Policy.
Parliamentary submission on the eradication of the Bucket Toilet System 22 & 23 February 2007 Cllr. Derrick Ndlovu.
Tomislav BARICEVIC HR Session 5 – Block 2 – Question 28 Barcelona May UNIFIED REGIONAL PLANNING OF ELECTRICITY AND GAS DISTRIBUTION NETWORK.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Smart Grid Paul Bircham Commercial Strategy & Support Director.
GC0104 – Demand Connection Code (DCC)
Utility Needs and Smart Grid for Major Storm Events
Pegasus Technical Workshop July 2003, Boston Pegasus Architecture Team
Chapter 7: Introduction to Data Communications and Networking
Background B513 built in early 1970’s for mainframe era.
Learning Communities online via
Ensuring Security of Supply in Estonian Transmission Grid
Demand Control Field Trials
Joseph C. Kvedar Director, Telemedicine Partners HealthCare Systems
Jee sook, Eun May 2004 Presented in IEEE 802.1af - key management
West Virginia Partnership for Health Innovation (WVPHI)
COMMUNICATION.
Information Brief (Deep Dive)
Pinole Creek Watershed Fish Passage Improvement Project
CSC 492 Senior Design Projects Fall 2018 – Section 2 Ms
All Wales Safeguarding Procedures Review Project
NSF GOALI (Grant Opportunities for Academic Liaison with Industry)
Submodular Optimization for Voltage Control in Power Systems
فرایند تسهیلگری در مددکاری جامعه ای
Biodiversity Working Group – offsets effectiveness project – some preliminary conclusions/issues identified Three key matters/questions suggested by Friends.
The OSU Division of Public and Community Psychiatry
Tailor-made solutions in response to increased demands on supply quality … paper 2.66 by DREWAG – Stadtwerke Dresden GmbH (Germany)
“What percent of Whole is Part?” “What Part is Percent of Whole?”
Planning and Management
ARIN New MDN allocation based on past utilization
Amendment to NEA & NExA Measurement Provisions Change Process
NJAC Co-Leads Community Liaison Community Advisory Board
Mary Kay Jewelry Stores
Oakland Network for Education (ONE) Network Upgrade
Presented By : Virtual Office CanberraVirtual Office Canberra.
We need a timekeeper!. Consulting Team Meeting July 26, 2013 Review of CCSS in a Box Class + Virtual Consultation.
Connection Codes Implementation
Engaging Consumers Through Technology: Sensors – All the Rage!
ESB Networks AIP Programme Update to IGG, June 22nd 2006
Electricity Transmission Network Improvement Project Grant for preparation
Presented By : Bookkeeping CanberraBookkeeping Canberra.
Eyelash Extension Service in Canberra for $89
Presented By: Executive coaching Canberra.
World-Leading Research with Real-World Impact!
AECS sled testing (NAMI’ testing centre)
Presented By : Dry Cleaning CanberraDry Cleaning Canberra.
Planning and Management
Intelligence and Performance Service – at 5th July 2018
Presentation transcript:

ACT supply security project

Act supply security project Bulk power supply to the ACT comes via TransGrid’s 330 kV network to Canberra Substation. Williamsdale Substation is connected at 330 kV to Canberra Substation via a single line. ActewAGL’s 132 kV network is supplied from Canberra and Williamsdale Substations. Total loss of Canberra Substation would also disconnect 330 kV line to Williamsdale and effectively blackout whole ACT. Stockdill Substation will be connected to the 330 kV network bypassing Canberra Substation. If future total failure of Canberra Substation, supply will be maintained to ActewAGL’s 132 kV via Stockdill and Williamsdale Substations.

Existing 330 kV and 132 kV network Yass Kangaroo Valley 132 kV Lower Tumut Canberra Gold Creek Upper Tumut Latham Woden Rest of ActewAGL 132 kV network Gilmore Theodore Williamsdale

Total failure of Canberra Substation 330 kV Yass Kangaroo Valley 132 kV Lower Tumut Canberra Gold Creek Upper Tumut Latham Woden Rest of ActewAGL 132 kV network Gilmore Theodore Williamsdale

Proposed Stockdill Substation 330 kV Yass Kangaroo Valley 132 kV Lower Tumut Canberra Gold Creek Upper Tumut Latham Stockdill Woden Rest of ActewAGL 132 kV network Gilmore Theodore Williamsdale

Rest of ActewAGL 132 kV network Total failure of Canberra Substation – Supply to ACT maintained through Stockdill and Williamsdale Substations 330 kV Yass Kangaroo Valley 132 kV Lower Tumut Canberra Gold Creek Upper Tumut Latham Stockdill Woden Rest of ActewAGL 132 kV network Gilmore Theodore Williamsdale

Before Macgregor To Upper Tumut Canberra Holt Stockdill Dr LMWQCC Stockdill site 132 kV to Woden 330 kV to Williamsdale

After Macgregor To Upper Tumut Canberra Bypass section Holt Stockdill Dr New 330 kV LMWQCC New 132 kV Stockdill Substation 132 kV to Woden 330 kV to Williamsdale

Public Consultation Process ACT Government (Environment and Planning Directorate) to lead community liaison and engagement activities. As part of the Environment Impact Statement process and Development Application process there will be public notification – scheduled for July 2017.