WORKING GROUP I (WG-I) AEEC IPS Update

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

ICAO ACP WG-I – Nov 2009 Industry Activity Update Terry Davis Boeing URN (GEANT) Comments IP Mobility Work Status ICANN Work IPv6 Impact on Aircraft Systems.
Overview of the interoperability Regulation
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
ESA Iris Programme: status
EUROCAE WG82: Airport Data Link System ACP WGW3 IP 8 Montreal, January 2010.
International Civil Aviation Organization
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
Federal Aviation Administration International Civil Aviation Organization INFORMATION PAPER AERONAUTICAL COMMUNICATIONS PANEL (ACP) 20th MEETING OF WORKING.
GateFusion Wireless Content Delivery
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
ATN 2002 London September 2002 Presented by Aloke Roy Authors: Christophe Hamel Tom Judd Ketan Nguyen Bryan Rowe Kevin Wohlers ATN AIRBORNE IMPLEMENTATION.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
1 Introduction of new electronic systems for aviation Thor Breien, Dr. Ing Park Air Systems AS Presented by Linda Lavik.
IP-v6 Drivers for Aviation & Usage Concepts Terry L Davis Boeing Commercial Airplanes (Advisor to the North America IPv6 Task Force)
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
Data Link Communications
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
ICAO ACP WG-I – Nov 2009 Industry Activity Update Terry Davis Boeing URN (GEANT) Comments IP Mobility Work Status ICANN Work IPv6 Impact on Aircraft Systems.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
1 Conditions for Mandating Data Link Equipage Steve Zerkowitz - IATA.
10 Dec 15 COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada January 2016 AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone)
PKI deployment in the Aerospace Industry
Additional aviation spectrum allocation for AM®S
FAA VoIP- Interoperability Event Summary Report
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Workshop on preparations for ANConf/12 − ASBU methodology
ESA Iris Programme: status
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by United Arab Emirates
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Mini Global Demonstration
ICAO ACP WG-I – Nov 2009 Industry Activity Update
Communication Roadmap ACP WGW04 – AI5 Jacky Pouzet, EUROCONTROL
AIM Operational Concept
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
International Civil Aviation Organization
ITS-Related Work Items in ITU-R Study Group 5, Working Party 5A
Presented at ICAO ACP WG-I By Robin Hughes
International Civil Aviation Organization
ANConf/12 – Agenda H. Sudarshan
Future Communications Infrastructure – An update
9/17/2018 Boeing ATN/IPS (Aeronautical Telecommunications Network/Internet Protocol Suite) Activities Title Option 1: Environment, Health & Safety Standard.
15-19 Nov 2010 Rockville, MD – Lockheed Martin
AIRCRAFT(ARINC) COMMUNICATION, ADDRESSING AND REPORTING SYSTEM
ANConf/12 – Agenda H. Sudarshan
DATA LINK IMPLEMENTATION IN EUROPE
Safety & Security of future SATCOM based Aviation Data Links
Joint FAA/Eurocontrol Future Communications Study (FCS)
MCO Status Report to JSTC
P AIRPORT SURFACE DATALINK
International Civil Aviation Organization
Scene setter European Commission DG Environment
International Civil Aviation Organization
ICAO ACP Working Group M Iridium Sub Group Overview
International Civil Aviation Organization
Presentation transcript:

WORKING GROUP I (WG-I) AEEC IPS Update 10 Dec 15 CP –WGI – 19/IP-xx 20-22 January 2016 International Civil Aviation Organization INFORMATION PAPER COMMUNICATIONS PANEL (CP) WORKING GROUP I (WG-I) Montreal, QC Canada 20-22 January 2016 Agenda Item 8: Any Other Business AEEC IPS Update (Prepared by Luc Emberger, Greg Saccone) Presented by Greg Saccone SUMMARY This information paper gives an update of the current plans in AEEC to progress the IPS for Aeronautical Safety Services standards ACTION The working group is invited to note the information presented.

AEEC IPS for Aeronautical Safety Services Update 10 Dec 15 AEEC IPS for Aeronautical Safety Services Update ARINC Project Initiation/Modification (APIM) to further define and specify IPS was submitted to AEEC Systems Architecture and Interfaces (SAI) Subcommittee, Feb 2015 APIM was voted on at mid-term session in Sep 2015 and approved, with an understanding that there would be two steps: Step 1: Develop a roadmap document and development plan, scheduled completion Apr 2017 Step 2: Execute the development plan and produce ARINC Project Paper 8XX, Internet Protocol Suite (IPS) for Aeronautical Safety Services, anticipated completion Apr 2019 Kick-off webex held on 10 Dec 2015 (presentation follows) First face-face meeting scheduled at RTCA in Washington DC for 23-25 Feb 2016

Internet Protocol Suite (IPS) for Aeronautical Safety Services 10 Dec 15 Internet Protocol Suite (IPS) for Aeronautical Safety Services Kick off Webex - Step 1

Planning of the activities Way of working 10 Dec 15 AGENDA Introduction Objectives Planning of the activities Way of working

INTRODUCTION – APIM 15-004 adopted 10 Dec 15 INTRODUCTION – APIM 15-004 adopted Following APIM 15-004 adoption in September 2015 (AEEC Mid-Term Session) a new group has been created: Internet Protocol Suite (IPS) for Aeronautical Safety Services subcommittee Co-Chairman: Greg Saccone, The Boeing Company Co-Chairman: Luc Emberger, Airbus Goal: Develop an industry roadmap and a development plan for defining IPS for Aeronautical Safety Services, including airborne, ground-based and space-based communication systems, coordinating with aviation Standards Development Organizations (SDOs), Air Navigation Service Providers (ANSPs) and others with an interest. Scope: New network infrastructure for safety services (both air traffic services (ATS) and aeronautical operational communications (AOC)) Non “safety” AOCs and Cabin IP Com are out of the scope of the WG

INTRODUCTION – A 2 step Approach, Focus on step 1 10 Dec 15 INTRODUCTION – A 2 step Approach, Focus on step 1 It is proposed that the IPS Subcommittee prepare a detailed technical definition of IPS for aeronautical safety services in a new ARINC Standard, in a 2 steps approach: Step 1: (from now to April 2017) Roadmap for standardization and main architecture impacts of IPS introduction Step 2: (April 2017 to April 2019) Development of an ARINC Standard for IPS Step 1 The subcommittee will define the perimeter which needs to be standardized for IPS (air-to-ground and end-to-end) and in which timeframe each part shall be standardized by the appropriate standardization body (ICAO, RTCA, EUROCAE, ARINC). The output of the new subcommittee for Step 1 will be an ARINC Report

INTRODUCTION - participation 10 Dec 15 INTRODUCTION - participation Commitment for Drafting and Meeting Participation Airlines: TBC Airframe Manufacturers: Boeing, Airbus Suppliers: Airtel ATN, GE Aviation, Honeywell, Rockwell Collins, Thales Others: ARINC (RC-IMS), FAA, SITA, Inmarsat, Panasonic

10 Dec 15 OBJECTIVES The main outcome of the final report shall be a detailed roadmap highlighting: What shall be standardized (equipment? Interfaces? Protocols? Performances? Profiles?) Which body shall support the standardization (AEEC, ICAO, RTCA, EUROCAE?) When the standardization shall be achieved? How the standards will be validated? In order to build a valid roadmap, endorsed by all stakeholders, a set of topics will need to be detailed in the report:

OBJECTIVES – Key topics (1/3) 10 Dec 15 OBJECTIVES – Key topics (1/3) Clarify and detail the scope to be addressed by ATN/IPS : Definition of long-term needs for IPS for aeronautical safety services What will be the “users” of IPS (ATC, AOC)? Which functional, performance and safety and data security requirements apply? Which communication means? Definition of mid-term opportunities Which applications and communication means Identify the deployment roadmaps and their impacts on the solution: Deployment roadmaps (Europe and US) including transition phase during which ACARS, ATN/OSI, and IPS will co-exist How aircraft equipped with ACARS, ATN/OSI and aircraft with IPS will be accommodated?

OBJECTIVES – Key topics (2/3) 10 Dec 15 OBJECTIVES – Key topics (2/3) Describe Aircraft architecture : ATN/IPS integration in different types of airborne avionics (429 based, AFDX based, others) Interfaces with the applications, with the radios, with the other systems Impact of data security requirements Multi-link considerations, how many stacks? Possible co-existence with ACARS and ATN/OSI datalinks ? Retrofit versus forward fit considerations Design Assurance level Security Assurance level

OBJECTIVES – Key topics (3/3) 10 Dec 15 OBJECTIVES – Key topics (3/3) Describe network end to end architecture: Mandatory requirements for interoperability (are RFCs sufficient?) Mobility, addressing requirements For AOC traffic For ATS traffic Security management – PKI considerations Describe ground components: Ground gateways End systems Impact on existing ACARS and ATN/OSI ground-based infrastructure? Standardization roadmap : What ? Who ? When?

PLANNING OF THE ACTIVITIES (Step 1) 10 Dec 15 PLANNING OF THE ACTIVITIES (Step 1) 2016 2017 D J F M A S O N Periodic telco/webex as needed Meeting 1 Meeting 2 Meeting 3 Meeting 4 Step 1 Report KOM (Webex) Open discussions White-papers review Agreement on the report TOC and assign chapters authoring Discuss first draft Final report ready for submission New white-papers and First contributions review Consolidate mature version Activity Mtgs Mtg-Days (Total) Expected Start Date Expected Completion Date Step 1: ARINC Report Standardization Roadmap for IPS 5 10 Sept 2015 April 2017

PROPOSED WAY OF WORKING 10 Dec 15 PROPOSED WAY OF WORKING Now: Call for contributions / white-papers, first thoughts focused on the key topics identified earlier as inputs for the first F2F meeting early 2016 (Date TBD) Identify any other technical areas that need to be defined (i.e. ones that are not mentioned in APIM) Establish boundaries between various bodies/committees Next year: First draft report expected by Q4 2016 Need to schedule synchronisation milestones with other bodies and initiatives ICAO EUROCAE/RTCA FAA/Europe ANSPs (NextGen /SESAR) ATN/IPS related projects: Validation initiatives, IRIS… Coordination as needed with other AEEC groups (SAI, DLK , DLK User Forum, NIS, AGCS, AeroMACS WG)

10 Dec 15 Questions Thank you! Question?

10 Dec 15 Backup slides

Datalink Roadmap 2015 2020 2025 2030 2035 FANS Comm means FAA DCL En-route B2A Europe B1 B2 B2A or B3 VHF Data/VDLM2 Comm means ? HF, Satcom Data 2 ? 2016 AeroMACS 2030 ? LDACS 2017 Iridium NEXT 2016 2028 Inmarsat SBB/IRIS Precursor Iris Airborne ATS Router ACARS ? ATN/OSI (Europe) ? ATN/IPS 2019 – Standards Available 2024 IOC (Boeing view) 2028-30 IOC (Airbus view)

Considerations regarding implementation of ATN/IPS on Aircraft 10 Dec 15 Considerations regarding implementation of ATN/IPS on Aircraft VHF system HF ACARS + ATN/OSI Router FANS ATC Applications AOC Applications in ACD SATCOM Aircraft Control Domain (ACD) (without ATN/IPS) VHF system ACARS + ATN/OSI Router FANS ATC Applications AOC Applications in ACD Aircraft Control Domain (ACD) with ATN/IPS ATN/IPS LDACS Aeromacs Security function? ? Other impacted systems FWS, CMS, DLCS RMP, .. HF SATCOM ? ? ?

Envisaged Boeing IPS Architecture – Work to be Done EFB Display CMC/ ACMF Cabin Systems FMS AOC/ATC Unaffected Components Future Comm Components Changed/New Components Changed/New Components CMF Comm Management Media Routing Logic AOC Router Logic, Media management (High Level) Dialog Service Interfaces Red Text/Lines: areas to be defined ACARS Over IP ACARS/IP Profile ACARS Network Network Profiles/ Specification, mobility ATN Network IP Network Network interfaces (coordinated with relevant groups) Air HF SDU VDR SBB/Iridium Certus/Other AeroMACS LDACS Ground Ground Gateway Comm Service Provider ANSPs, AOCs

ANNEX ICAO Global Air Navigation Plan V4 ATN/IPS 10 Dec 15 ANNEX ICAO Global Air Navigation Plan V4 ATN/IPS LDACS, AeroMACS and Future Satellite Full 4D