Evaluating Utility Allowance Options: UAs from the PHA Perspective Samantha Sowards Nan McKay & Associates.

Slides:



Advertisements
Similar presentations
Calculating Utility Allowances Michael Kotin Kay-Kay Realty Corp
Advertisements

Compliance and Credits The Tools, The Rules And How They Affect Your HUD Multifamily Housing Project November 1-2, 2007.
Ten Things to Know about RAD if you are Advising PHAs
Rental Assistance Demonstration (RAD) Informational Meeting Cloud Laird Room December 2, 2013 & Dogwood Community Room December 3, 2013.
Section 3: The Central Office Cost Center
CMHA and The Nelrod Company Community Focus Group Meeting - An Intro to HCV Rent Reasonableness.
1 Rental Assistance Demonstration “RAD” Program Homes Within Reach November18, 2014 Martin Walsh Reno & Cavanaugh, PLLC.
HOME FINAL RULE Summary of COMPLIANCE Changes. HOME FINAL RULE Highlights of the Changes to the 2013 HOME Final Rule  Accelerate the timely production.
1 RAD P ROGRAM U PDATE – J UNE 2014 No. ProjectsNo. Units Total Active Public Housing CHAPs29038,173 Total Active Mod Rehab CHAPs7878 Closed Public Housing353,184.
Slide #1 Annie Stevenson Verification Techniques.
Rental Assistance Demonstration (RAD) PIH Notice , REV-1
KEEA/PBI Energy Efficiency 2013 Multifamily Programs Tom Corbett, Governor Brian A. Hudson, Sr., Executive Director/CEO
HUD-VASH Project-Based Vouchers HUD published PIH on this subject effective March 16,
HOUSING CHOICE VOUCHER PROGRAM PROJECT-BASED ASSISTANCE.
HUD Notice Rental Assistance Demonstration (RAD) – Partial Implementation and Request for Comments April 2012.
Rental Assistance Demonstration (RAD) PIH Notice
RENTAL ASSISTANCE DEMONSTRATION RAD RAD 101 AND PROGRAM UPDATE 6/9/20151.
11/12/13 RAD FOR MOD REHAB PROPERTIES MTM Consulting LLC.
RAD-All the Latest News! Texas Housing Conference July 28-30, 2014 Hilton Hotel Austin, TX.
Enhanced Vouchers HCV Exec Mgmt 4/22/2017
Slide #1 Teri Robertson Project Based Vouchers. Slide #2 Project-Based Vouchers  Handouts: Project-Based Voucher Program; Final Rule  Includes 24 CFR.
Permanent Supportive Housing with Project Based Voucher Assistance June 13, 2008.
Slide #1 Annie Stevenson Verification Techniques.
Key Differences Between DHCD’s MTW Program and HUD’s Rental Assistance Demonstration (RAD) Program.
Project Based Vouchers June 13, 2008 By Jackie Blankenship Housing Voucher Programs.
HOME Update: Match, Utility Allowance, Subsidy, Income, Rent, and Homeownership Value Limits Slide 1.
Managing Utility Allowance Expenses © Diamond Property Consultants, Inc.
Housing Residents with Mental Health Challenges. PH Unit Conversion A PHA may convert dwelling units to non-dwelling units for the purposes of housing.
Rental Assistance Demonstration. This is RAD 2 ACCSection 8 At closing, funding is converted to a Section 8 contract rent.
Update.  FY 2014 Appropriations Act (Notice PIH )  FY 2015 Appropriations Act  Interim Rule published in the Federal Regulations, October 8,
National Council of State Housing Agencies DUTY TO SERVE NOTICE OF PROPOSED RULEMAKING JANUARY 14, 2016.
Rental Assistance Demonstration (RAD) PIH Notice
RAD-All the Latest News! Texas Housing Conference July 28-30, 2014 Hilton Hotel Austin, TX.
Rental Assistance Demonstration HUD Office of Public & Indian Housing Conference Meridian, Mississippi, April 23, 2012 Vincent O’Donnell Vice President,
Rental Assistance Demonstration Presentation to TRACS Industry Working Group 4/7/16.
ALABAMA MISSISSIPPI CONNECTICUT VIRGINIA 500 Office Park Drive, Suite 300 / Birmingham, AL RESTRUCTURING PUBLIC HOUSING PORTFOLIOS.
Eligible Costs – Rental Assistance & Rapid Re-housing (RRH) 24 CFR CFR
Section 8 Compliance Essentials
Compliance Challenges in the RAD Portfolio
Discussion Items Determining Operating Subsidy Eligibility
Rental Assistance Demonstration (RAD) Overview
Compliance Challenges in the RAD Portfolio June 22, 2017
What is RAD ? The Rental Assistance Demonstration (RAD) is a voluntary program of the Department of Housing and Urban Development (HUD). RAD seeks to.
Qualifying Applicants for the LIHTC Program
Housing Choice Voucher Program
RAD Trainer: Julie Gabhart. RAD Trainer: Julie Gabhart.
Understanding URA/HUD Relocation Assistance Requirements
Rental Assistance Demonstration (RAD) Update
Rental Assistance Demonstration (RAD) Update
Evaluating Utility Allowance Options
Tenant Qualification Seminar Blended Project Challenges
RAD Trainer: Julie Gabhart. RAD Trainer: Julie Gabhart.
Income limits & utility allowances
Project-based Vouchers RAD AAHRA Birmingham, AL April 16-17, 2017
Managing Property with Multiple Funding Sources
Rental Assistance Demonstration (RAD) Final Notice Overview
Presented by: Naomi W. Byrne, principal Stinger consulting, llc
RAD Program Overview.
Life After RAD Galveston, TX August, 2018 Holly Knight
Understanding FSS Reporting Requirements and Composite Scores
NLIHC Public Housing Resident Webinar September 18, 2012
Rental Assistance Demonstration (RAD) Mod Rehab and Public Housing
Procurement After Rental Assistance Demonstration (RAD)
Brave New World: Using PBRA with LIHTC (HUD 811 & RAD PBRA)
Housing Mobility: Federal Policy Context
Rental Assistance Demonstration Program
RAD for Developers September 5, 2013 Chicago.
HUD updates on the Family Self-Sufficiency (FSS) Program
Repositioning Options from Section 18 to the Rental Assistance Demonstration (RAD) September 12, 2019 September 20, 2019.
Presentation transcript:

Evaluating Utility Allowance Options: UAs from the PHA Perspective Samantha Sowards Nan McKay & Associates

PHA tenant-based (HCV) – Must be determined based on the typical cost of utilities and services paid by energy-conservative households that occupy housing of similar size and type in the same locality – Must use normal patterns of consumption for the community as a whole and current utility rates 24 CFR ; HCV Guidebook Ch 18

Things to consider… – Remember all PHAs do this differently – Typically takes a lot of time, effort, and money – Not based on actual usage – Some consider energy efficiency Doesn’t hurt to ask – Only required to change the UA when there’s a 10% or more increase since last revision Many change every year since it’s time consuming to calculate whether there’s been a change

HOME – For projects committed on or after 8/23/13, PJ must determine UA using either: HUD Utility Schedule Model or Project-specific methodology based on actual usage – Multifamily utility analysis per H – Utility company estimate – LIHTC Agency estimate – Energy Consumption Model HOMEfires- Vol 13, No. 2

PJ may not use PHA UA for projects committed on or after 8/23/13 – Older projects may continue to use PHA UA PJ must request a waiver if the UA requirement for another program conflicts with HOME – Think HCV tenants in HOME units HOMEfires- Vol 13, No. 2

Project-Based Rental Assistance (PBRA)/Multifamily – Notice H In the past there was no national standard – Baseline utility analysis based on actual usage at the property once every 3 years Process can be cumbersome – Factor-based analysis other years State-specific increase factor UAF (similar to an OCAF)

Public Housing – Must establish allowance for: PHA-furnished, checkmetered utilities and Utilities purchased directly by residents from suppliers – Many charge for excess utility usage 24 CFR ; PH Occupancy Guidebook

Under the Rental Assistance Demonstration (RAD) Program, PHA has the option to convert public housing to either: – Project-based vouchers (PBVs) HUD’s Office of Public and Indian Housing – Project-based rental assistance (PBRA) HUD’s Office of Multifamily Housing Programs Very typical to layer in LIHTCs and perform a rehab in these situations

RAD PBRA – At closing must use public housing UA However PHA may submit projections of energy saving improvements for HUD approval – Contract rents increased by 75% of approved reduction » $500 contract rent + $130 PH UA= $630 gross rent » New UA is $90 x 75% = $30 » $530 contract rent + $90 new UA = $620 gross rent – Year after conversion, follows H PIH (REV-2)

RAD PBV – At conversion, initial rents set using PH UA Unless energy conservation measures like in PBRA – PHA may request waiver from HUD to establish site-specific UAs and apply tenant utility savings HCV UA would create undue cost to families or discourage conservation/efficient use of HAP funds – After conversion, must use UA in accordance with HCV/PBV regs Effective for each family at annual recert PIH (REV-2)

Example 1: Grove Gardens 20 unit project with 100% PBRA, 100% LIHTC, and 5 fixed HOME units – Multifamily UA per H for all 3 programs But owner needs to talk to PJ for HOME since PJ sets UA

Example 2: Maple Manor 30 unit project with 15 PBV RAD units, 15 public housing units, 100% LIHTC – 15 RAD PBV/LIHTC units use the PHA HCV UA (unless exception is granted for project-specific) – 15 public housing/LIHTC units use the PHA public housing UA

Samantha Sowards Nan McKay & Associates Manager of Curriculum Development (800) ext.120