2 Qualifying tenants in blended projects requires additional consideration
All program rules must be considered Makes compliance more complex Program regulations sometimes conflict RAD conversions present some unique challenges

3 Programs may be blended at the unit level or the project level
These are both blended properties, but compliance activities will be slightly different PBV/LIHTC PBV LIHTC

4 Important Considerations
Tenant files Forms Income limits Student eligibility Income calculation Employment income Zero income Sporadic income Rent setting Utility allowances Termination requirements Increases in income Interim reporting requirements RAD issues Initial qualification of households Termination/grievance requirements

5 Initial Qualification of RAD Households
PHAs will choose either RAD PBRA or RAD PBV HUD regulations state that in-place residents have the absolute right to return to the project once rehab is complete HUD does not allow re-screening of in-place households for RAD PBRA or RAD PBV HUD eligibility factors

6 Initial Qualification of RAD Households
In-place households must have rent phased-in if RAD conversion results in tenant monthly rent increase by more than 10% or $25 3 year or 5 year phase-in (PHA policy) In-place households with high income levels may not qualify under LIHTC income limits Need a plan to address those households

7 RAD PBRA RAD PBRA + LIHTC Issue
For BOTH in-place residents at the time of conversion AND for new admissions, when the household’s total tenant payment (TTP) exceeds the RAD PBRA gross rent, the household must pay the TTP Issue Household TTP could exceed the LIHTC maximum gross rent at conversion or anytime thereafter for all households PIH Notice REV-2

8 RAD PBV In-Place Households
RAD PBV + LIHTC For in-place households at the time of conversion, when the household’s total tenant payment (TTP) exceeds the RAD PBV gross rent, the household must pay the TTP Issue Household TTP could exceed the LIHTC maximum gross rent at conversion or anytime thereafter for in-place households In-place households treated differently – must track PIH Notice REV-2

9 RAD PBV New Admissions after Conversion
RAD PBV + LIHTC For new admissions after conversion follow regular PBV regulations at 24 CFR 983 When household income increases to point where $0 housing assistance is paid on behalf of household, household pays full rent to owner (Can be $0 HAP for 180 days. Terminated from program at day 181) Issue Tenant paid rent could exceed the LIHTC maximum gross rent limit once HAP is $0 for new admission households

10 Termination and Grievance Requirements for RAD PBRA and RAD PBV
All in-place and future residents must be afforded public housing termination and grievance rights Include in House Rules for RAD PBRA See Attachment IE – House Rules: Addendum A - Resident Procedural Rights (PIH Notice REV-2) Include in Administrative Plan and owner’s lease for RAD PBV PIH Notice REV-2

11 RAD Guidance RAD PBRA: 24 CFR 880 although parts do not apply to RAD PBRA projects See Appendix 1 (PIH Notice REV-2) RAD PBV: 24 CFR 983 and 24 CFR 982 although parts of both do not apply to RAD PBV projects PIH Notice REV-2 Quick Reference Guides (PBRA and PBV) RAD Conversion Guide RAD Relocation Notice H ; PIH