Timing and synchronisation J. Jones, A. Moss and E.W. Snedden April/May 2015.

Slides:



Advertisements
Similar presentations
3mm amplitude test by Cheng-Jiun Ma. Observation Source : Orion SiO Frequency: GHz 256 channels within 64MHz bandwidth Ant 3 & Ant 4 no Tsys correction.
Advertisements

Selection of measuring instruments
M. apollonioAccel. R&D/Physics and IADR - RAL - 19/3/ Magnets Dry Run ISIS Scheduling Meeting Latest news on Target Ready to run ? Summary of: Magnets.
Laser to RF synchronisation A.Winter, Aachen University and DESY Miniworkshop on XFEL Short Bunch Measurement and Timing.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
Performance of SPIROC chips in SKIROC mode
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
September 7/04Cyclotron Development Meeting. Improvement TOF Possible TOF improvements.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
LLRF 15 Daresbury Andrew Moss ASTeC, STFC Daresbury Laboratory.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
30GHz system improvements Jan Kovermann RF meeting
SRS TIMING ANOMALY RD51 Mini-Week June 9, 2015 M. Phipps, BNL 1.
FUNCTION GENERATOR.
Scientific Method.
SYSTEMS OF MESUAREMENT
On Target? Do this on your Warm Up worksheet!
Primary Longman Elect 3B Chapter 1 Text Type Timetables.
Topics
NEAS Workforce Management Contact Centre Flexible Options
RF acceleration and transverse damper systems
S1G Experiment Schedule Plan
LCLS_II High Rep Rate Operation and Femtosecond Timing
UK FEL development package WP6:
Scientific Method.
RF Synchronization Activity
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Topics
Monitoring glitches in the frequency divider
LINE graphs SPI & SPI SPI & SPI
Collecting Data: Observational Studies
Earth, Moon and Sun Model
Analysis of FADC single-crystal data
Noise analysis of the 1m3 DHCal test beam
PART 3:GENERATION AND DETECTION OF ANGLE MODULATION
Time Revision.
Top 10 OR Dashboard Metrics
Damping Ring Kicker Tests at AØ
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
MON TUE WED THU
A M P M Name: ________ Voice Log Week of __/__/__ Monday Tuesday
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Summary of Week 16 G. Arduini, J. Wenninger
Monday February 28th 8h00: Injection
Milestone: Things to Know
Within-Week Variability and Long-Term Trends in Traffic, Power Plant Emissions, and Ambient CO, NOy and Ozone for the Charlotte Metropolitan Area Jennifer.
Pollution from Diesel Generators – Gurugram
2008 Calendar.
June 2018 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
TERM JUNIOR PROGRAM MONDAY 29th JANUARY – SUNDAY 15th APRIL
8.5 Modulation of Signals basic idea and goals
Sun Mon Tue Wed Thu Fri Sat
LCLS RF Stability Requirements
CS 240 – Lecture 7 Boolean Operations, Increment and Decrement Operators, Constant Types, enum Types, Precedence.
Sun Mon Tue Wed Thu Fri Sat
Extended Christmas Hours Thursday December 8th 9am -6:30pm Friday December 9th 9am -6:30pm Saturday December 10th 9am-6pm Thursday December.
Stability of Calibration Data
WELCOME.
Time 1.
A M P M Name: ________ Fluency Log Week of __/__/__ Monday Tuesday
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
June 2017 Seahawk Cross Country SUMMER RUNNING Sun Mon Tue Wed Thu Fri
Sun Mon Tue Wed Thu Fri Sat
Reviewing Abbreviations
Gain measurements of Chromium GEM foils
2008 Calendar.
Presentation transcript:

Timing and synchronisation J. Jones, A. Moss and E.W. Snedden April/May 2015

RESULTS: DRIFT

Method Monitor relative phase between master oscillator (MO) 3 GHz and 81 MHz channels using 40GS·s -1 LeCroy scope; compare with laser signal from photodiode: – Trigger scope from photodiode, measure drift of MO signals as changes in time of first crossing point – Slew rate determines resolution: Laser – 3 GHz: ~10 ps shot-to-shot; ~2 ps with 5 minute averaging Laser – 81 MHz: ~20 ps shot-to-shot; ~4 ps with 5 minute averaging Photodiode used has lower bandwidth than 3 GHz diode used in previous studies (currently in use elsewhere), hence lower resolution (2 ps for Laser – 3 GHz possible with fast diode) Monitor temperature changes using localised air probes and MR’s Picolog recorder (always running) Measure VELA crest phase using standard operating procedures

Results Scope run 1: 23 rd – 27 th April Results: Friday to Sunday (midnight) – Significant, near-linear phase drift of laser- 3 GHz: ~3 ps·hr -1 ≈ 3° hr ° change in two days! – Small drift of laser-81 MHz: ~0.8 ps·hr -1 ≈ 0.02° hr -1 – Day-night cycle accounts for variable °C change in room temperature Results: Monday morning – Phase jump at ~10 am in both laser-3 GHz and laser-81 MHz Sudden change in room temperature at same time Log notes laser was switched on at this time (laser room door opening?) – Phase jump at 3 pm in both laser-3 GHz and laser-81 MHz Sudden change in room temperature at same time Noted by operator (BM) as change in crest phase by 50 degrees, measurements at 11 am and 3 pm Mon. 27Sun. 26Sat. 25Fri. 24Thu. 23 VELA log 15:35 ”Something changed in RF system. Crest phase changed to 112 degrees.”

Results VELA crest phase: 27 th April Compare changes in VELA crest phase (monitored at regular points during operational shift) against drift of 3 GHz – laser Phase drift of VELA can be almost completely explained (i.e. within an order of magnitude or better) by 3 GHz – laser phase drift: – This excludes second-order effects from temperature changes to cables running to RF, drift of the RF system independent from the MO, which will exist but cannot currently be quantified from laser room – Only by eliminating 3 GHz phase drift can we begin to investigate smaller drift contributions

Results SLAP: evidence for 81 MHz – laser drift? Scope data indicates small phase drift of laser and 81 MHz, but magnitude is comparable to noise in measurement SLAP has ‘Fundamental Phase Error’ readout, derived from heterodyning the 81 MHz from MO and laser oscillator, but value is not calibrated – Error is used by the SLAP to tell if there has been a change in absolute phase to which the laser oscillator is locked – System does not explicitly treat drift, but will fall out of lock if the absolute phase changes by a certain (sadly unspecified) value. Fundamental error should therefore be representative of the relative phase difference between 81 MHz – laser could be a more precise metric if calibrated Record variation in error over hours which generally tracks room temperature; fast change in error when laser amplifiers deactivated – SLAP is enclosed in a rack also housing the laser amplifiers, which generate significant amounts of heat: turning the amplifiers off will change the temperature significantly Fri Time / hours Temperature /  C Fundamental phase error (arb. units) Laser amplifier off: expect temperature in amplifier rack, where SLAP is, to change dramatically Laser room air temperature, not in amplifier rack: does not immediately respond to amplifiers

Relative phase drift / ps 3 GHz - Laser 81 MHz - Laser Time / hours Temperature /  C Results Scope run 2: 27 th – 30 th April Results: Monday to Thursday (late morning) – Significant, near-linear phase drift of laser-3 GHz: ~3 ps·hr -1 ≈ 3° hr -1 – Negligible drift of laser-81 MHz – Small phase jumps on Tuesday correlate with sudden changes in room temperature (~0.5°C change) Decision made on Wednesday to move temperature probe closer to MO: – Now attached to same rack, but still only measuring air temperature – Air temperature almost 3°C higher at MO position: MO is directly next to oscilloscope, quantum composer, pulse generator: all electronics running 24/7 Fri. 01Thu. 30Wed. 29Tue. 28Mon. 27 Move temperature probe next to MO

Results MO rack temperature: 30th th April – 5 th May Monitor laser room temperature (air probe above laser table, close to amplifier rack), 1 minute average Laser phase measurement no longer available due to experiment conflict Average temperature varying by >1°C day- to-day, likely with ambient temperature (can’t find temperature logs for Warrington!) – Target should be <0.1°C – currently running an order-of-magnitude higher Temperature spike peaking Friday at 10 am: – Log notes laser turned on at 9:30 am – sudden rise due to laser operator moving close to MO? Fri. 01 Thu. 30 Mon. 4 Sun. 03 Sat. 02 Tue. 5 Wed. 29

Discussion What do collected results suggest regarding the current state of VELA? Clear: – 81 MHz – 3 GHz of MO are drifting by ~3-4° per hour Similar behaviour observed on ALICE, property of MO alone; ALICE solution was to implement feedback loop to stabilise drift Unclear what impact feedback will have on short-term jitter → should be investigated – 81 MHz – laser drift is <1° per hour, currently negligible in comparison to 81 MHz – 3 GHz – Operational drift stability of VELA is currently determined by 81 MHz – 3 GHz phase drift Smaller contributions to drift from RF, cables (etc.) can only be quantified once this primary contribution has been addressed – Sudden changes in laser room temperature (temperature in vicinity of MO and SLAP), such as those produced by entering or leaving the laser room, result in significant phase jumps (>10°) Further work required: – Limited evidence for drift between 81 MHz and laser oscillator, but quantitative analysis including calibrated phase measurement required: If drift contribution from 3 GHz is addressed, this may become the limiting factor Scope approach limited in temporal resolution due to low slew rate Error signal from Synchrolock is currently not calibrated but could be suitable