September 27th, 2016 Challenges Posed by Processing Scientific Data at Extreme Light Infrastructures Tamás Gaizer.

Slides:



Advertisements
Similar presentations
CIRAS PROJECT OVERVIEW
Advertisements

ELI – the international dimension Wolfgang Sandner Director General and CEO ELI Delivery Consortium International Association Prague, 24 May 2013 Project.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Research and Innovation Research and Innovation Research and Innovation Research and Innovation Research Infrastructures and Horizon 2020 The EU Framework.
A Transnational TTO for ELI Collaboration with CERN J.-M. Le Goff ELI-CTU-CERN meeting ELI, Prague, January 29th-30th, 2014 HEPTech-CERN Collaboration.
EPOS WG Coordination Workshop, Prague WG10 Infrastructure for Georesources o Short-term implementation plan of the Induced Seismicity Node.
The Preparatory Phase Proposal a first draft to be discussed.
Procurement Innovation for Cloud Services in Europe CERN – 14 May 2014 Bob Jones (CERN) This document produced by Members of the Helix Nebula consortium.
EPOS a long term integration plan of research infrastructures for solid Earth Science in Europe Preparatory Phase Project
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
EU funded projects in Bucharest and surroundings areas Meeting with the Italian Presidency 24 November 2014.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
This document produced by Members of the Helix Nebula Partners and Consortium is licensed under a Creative Commons Attribution 3.0 Unported License. Permissions.
Project supported by: ELI-DC and the future ELI-ERIC: structure, status, current plans and current unknowns Wolfgang Sandner Director General, ELI Delivery.
ESFRI & e-Infrastructure Collaborations, EGEE’09 Krzysztof Wrona September 21 st, 2009 European XFEL.
R&D STRATEGIES IN SUPPORT OF INDUSTRIAL TRANSFORMATION Arm.Dpt. ROMANIA MINISTRY OF DEFENCE ARMAMENTS DEPARTMENT 01 November 2007.
EPOS where we are, where we go ! Massimo Cocco INGV Rome September EPOS Meeting.
18/03/2013, Villigen Development plan in WP19 MTA SZTAKI Robert Lovas MTA SZTAKI Laboratory of Parallel and Distributed Systems.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
Testing and Validation Kuvvet Atakan and the WP6 and WP7 Teams.
Realising the Community Vision of Concurrent Enterprising ICE 2003 Moderator Roberto Santoro, ESoCE NET Roberto Santoro, ESoCE NETwww.esoce.net.
ERINHA: Framework for the biological high containment research infrastructure STOA – AVIESAN Workshop June 19th 2012, European Parliament, Brussels.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
3 nd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Sergio Andreozzi Strategy and Policy Manager, EGI.eu EGI Technical.
EGI and Data Scientists: Demand Sy Holsinger EGI.eu Senior Strategy and Policy Officer EGI Community Forum November 2015, Bari EDISON – Education.
INDIGO – DataCloud WP5 introduction INFN-Bari CYFRONET RIA
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
The e-Infrastructure Commons a status report EGI Conference 2015 Sverker Holmgren e-IRG Chair.
European Perspective on Distributed Computing Luis C. Busquets Pérez European Commission - DG CONNECT eInfrastructures 17 September 2013.
1      Structural Funds DG REGIO + RESEARCH INFRASTRUCTURES for EU COMPETITIVENESS: research and innovation assets Giorgio Rossi, Unimi, ESFRI EB.
Co-ordination & Harmonisation of Advanced e-Infrastructures Research Infrastructures – Grant Agreement n CHAIN sustainability guidelines Dr. Ognjen.
Pomeranian Campus of Professions is an innovative initiative whose objective is to offer free assistance to the residents of Gdynia and Pomorskie Voivodeship.
EGI-InSPIRE EGI-InSPIRE RI The European Grid Infrastructure Steven Newhouse Director, EGI.eu Project Director, EGI-InSPIRE 29/06/2016CoreGrid.
Bled, 18 th June 2008 eCollaboration: Overcoming Boundaries through Multi channel collaborations Workshop on Services.
1 © 2007 Chapter 3 Strategic Planning for the EHR Migration Path.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
Why Invest in Humanities Research Infrastructure? Dr Jennifer Edmond Trinity College Dublin Co-Head, DARIAH VCC-2.
Launch event ICRI 2016, Cape Town - South Africa Launch event ICRI 2016 Cape Town South Africa David Bohmert Member ESFRI Executive Board Swiss ESFRI Delegate.
H2020 Big Data Lighthouse Pilot DataBio
Break out group coordinator:
Extreme-Light-Infrastructure: Experience with a synergy funding model for Research Infrastructure projects ( ESFRI, FP7, structural and national funds.
INSPIRE and the role of Spatial Data Interest Communities (SDIC)
STRATEGIC ACADEMIC UNIT “PEOPLE & TECHNOLOGIES”
Alessandro Spinuso, Andreas Rietbrock, Andrè Gemuend,
MSc-Student Activities at the European XFEL
Presenter: T. Gaizer (ELI-ALPS), co-authors: G. Beckett, J. Chudoba, M
EERA e3s and Energy Consumers
Luděk Matyska CESNET ERIC Survey Results Luděk Matyska CESNET
WP1 – Smart City Energy Assessment and User Requirements
Grid infrastructure development: current state
Wrap-up & discussion EOSC Governance Development Forum workshop:
Science parks and technological support at ELI Beamlines
ELITRANS project and DIRAC
Davor Kozmus, MHEST Steering Platform Meeting 29. October 2009, Zagreb
The French National Agency on Water and Aquatic Environments
Mirjam van Daalen, (Stephan Egli, Derek Feichtinger) :: Paul Scherrer Institut Status Report PSI PaNDaaS2 meeting Grenoble 6 – 7 July 2016.
EOSC Governance Development Forum
European Open Science Cloud All Hands Meeting Pisa 8-9 March 2018
Common Solutions to Common Problems
Technology Transfer at ELI-ERIC / ELITRANS
Brian Matthews STFC EOSCpilot Brian Matthews STFC
CEITEC Nano Research Infrastructure
Knowledge and skills for sustainable development:
February
Ðì SA Effective Monitoring and Evaluation of Progress on the SDGs Monitoring SDGs : the perspective of Armstat Learning Conference: Implementing.
Status of ELI Beamlines
Meet-up, ELI – NP - Magurele, June 26, 2019
Expand portfolio of EGI services
Maria Teresa Capria December 15, 2009 Paris – VOPlaneto 2009
Presentation transcript:

September 27th, 2016 Challenges Posed by Processing Scientific Data at Extreme Light Infrastructures Tamás Gaizer

ELI = Extreme Light Infrastructure: pan-European research institution Three pillars (cutting edge research institutions): ELI-ALPS (Szeged, Hungary): ELI-BL (Dolní Břežany, Czech Republic): PW-power laser with high repetition rate ELI-NP (Măgurele, Romania): Ultrahigh intensity laser beam Transition from construction to operation: All pillars are close to completion Operation is expected to start in In Szeged, 10 endpoints („SeSo”) will be available for experiments Construction is run independently at the three pillars, coordinated by ELI-DC ELITRANS: transformation from ERDF - funded distributed implementation towards ERIC - governed unified operation ELI in a Nutshell

initiation Parallel implementation joint operation MoU ELI Delivery Consortium ELI-ERICPP ELITRANS H2020 Project on the ELI roadmap Transition from distributed implementations towards integrated and unified operation ELITrans

Developing concepts for ELI-ERIC’s business model: essential elements of the future ELI-ERIC’s organisation, legal constitution, financial sustainability, governance, user relations, and international integration Preparing ELI-ERIC’s “business plan”, adapted to the operation as the world’s first international laser user facility corporate-wide concepts for a VRME, definition and standardisation of user-facility interfaces, health and safety regulations, specialized experiment preparation techniques, computing and big-data management, innovation and technology transfer aspects Preparing and undertaking the merger of formally independent national construction projects towards one unified research infrastructure of pan-European importance. This includes steps towards the transformation and unification of ELI’s internal structures and organisational procedures, the creation of an internal corporate identity, harmonisation and unification of international relations, creation of a common scientific profile and competitive user research opportunities. Main ELITRANS objectives

Key objectives: Developing concepts for ELI-ERIC’s business model Preparing ELI-ERIC’s “business plan” Manage the merger of independent developments into one unified RI Timescale, budget: September 2015 – August 2018 (36 months) 11 workpackages, one devoted to „Data and computing” EC funding of 3.4 mEUR Consortium members: Coordinator: Extreme Light Delivery Consortium ASBL Pillars: ELI-ALPS, ELI-BL, ELI-NP E-infrastructures specialised on big data handling: PRACE, KIT, EGI Strategic partners: DESY, STFC, Elettra ELITRANS Facts and Figures

Global View of ELI Research Process The model is partially based on: J. Bicarregui: Building an Open Data Infrastructure for Science: Turning Policy into Practice. Franco-British Workshop on Big Data in Science, November 2012

Goal of Data and Computing: Prepare the implementation of a common, ELI-wide data management service layer Define interfaces, integrate to e-infrastructure, manage big data, provide unified access to users, recommend data models, conduct pilot projects Challenges: State-of-the art research tools open new perspective for acquiring raw data -> quantity and complexity increases Exact needs are being assessed now / making predictions is challenging Expected quantity: 1 – 5 PB scientific data / year / pillar Different endpoints require different acquisition, management and computation tools and technologies Need for online processing (during the experiment) Data and Computing WP: Goal and Challenges

Tasks within Data and Computing WP: Task 1: Develop common concepts for data management, identify requirements Task 2: Survey and identify e-infrastructure solutions Task 3: Define the common ELI-wide data management service layer How to Achieve

Envisaged User Scenarios (1): Generic Data Management Workflow

Would-be users: scientists researchers from the field of physics, chemistry, biology, nanotechnology General public: data might be made available some time after the experiment Expected number of users: / year Access to the system: on-site during the experiment, remote access in certain cases „System”: different systems for different endpoints! Needs are changing from „traditional” scientific computation to HPC Envisaged User Scenarios (2)

Every pillar is under development yet Step-by-step installation of experiment endpoints during 2017 First „friendly user test” are expected to start in 2017 Live operation: during 2018 Components related to data and computing: still in the design phase. Equipment supporting the DAQ process definitely will be kept in-house „Offline” processing, mid- and long term storage might be implemented at pillar, ERIC, or e-infrastructure Current Status

A unified, ELI-wide data management framework will be applied at every pillar Controlled data management processes, transparent service rules Experimental data and related metadata will be maintained according to international standards Access to a wide range of state-of-the-art data management and computation tools Availability of e-infrastructure solutions to support processing and curation of scientific data Closing Remarks: Benefits for Scientific Community

THANK YOU FOR YOUR ATTENTION!