MinION Anatomy. Pre-Run Check List Flowcell inspection Remove bubbles in fluid lines and on surface of flowcell where possible if present, & confirm conductive.

Slides:



Advertisements
Similar presentations
What's new?. ETS4 for Experts - New ETS4 Functions - improved Workflows - improvements in relation to ETS3.
Advertisements

Installing Windows XP Professional Using Attended Installation Slide 1 of 30Session 8 Ver. 1.0 CompTIA A+ Certification: A Comprehensive Approach for all.
X-Call Version V3.0 User Guide
Web Filtering. ExchangeDefender Web Filtering provides policy-controlled protection from dangerous content on the web. Web Filtering is agent based, allowing.
LogTag Training January 2015
Training for Radiation Pagers Training for Radiation Pagers Berkeley Nucleonics Corporation 2955 Kerner Blvd. San Rafael, CA
Module 9: Performing HIV Rapid Tests Demonstration and Practice.
Step 1: Using the Classroom Equipment The Crestron panel is the BRAIN of the classroom equipment. 1. Touch the screen to activate the controls 2. Press.
SOFTWARE PRESENTATION ODMS (OPEN SOURCE DOCUMENT MANAGEMENT SYSTEM)
CTE Conference Innovative Technology November 12, 2013 Farmington Marriott.
© 2008 Cisco Systems, Inc. All rights reserved.CIPT1 v6.0—5-1 Implementing Media Resources, Features, and Applications Implementing Cisco Unified Video.
Week:#14 Windows Recovery
COMPREHENSIVE Windows Tutorial 10 Improving Your Computer’s Performance.
MCTS Guide to Microsoft Windows Server 2008 Network Infrastructure Configuration Chapter 11 Managing and Monitoring a Windows Server 2008 Network.
GPS. Meet the Bad Elf GPS Pro The Bad Elf GPS Pro offers the first Apple approved GPS with an informative user interface.
®® Microsoft Windows 7 Windows Tutorial 10 Improving Your Computer’s Performance.
This presentation will guide you though the initial stages of installation, through to producing your first report Click your mouse to advance the presentation.
Legacy Remote I/O Upgrade to Ethernet
Hands-On Microsoft Windows Server 2008
Tutorial 11 Installing, Updating, and Configuring Software
Hands-On Virtual Computing
TAKING CARE GUIDELINES Sub-title Place, Month Year.
How to create webcam tests in Illuminate Things you will need:  A webcam  Illuminate software  Paper in your printer  Answer key for test.
Online Training for TEXAS TECH UNIVERSITY and TEXAS TECH HSC Hiring Managers Employment Office April 2003.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
MCTS Guide to Microsoft Windows Vista Chapter 4 Managing Disks.
Analog Discovery Arbitrary Function Generator for Windows 7 by Mr
Smita Vijayakumar Qian Zhu Gagan Agrawal 1.  Background  Data Streams  Virtualization  Dynamic Resource Allocation  Accuracy Adaptation  Research.
Adapted from “Cooling Systems” – CTAE Information Technology Essentials PROFITT Curriculum.
Page 1 Printing & Terminal Services Lecture 8 Hassan Shuja 11/16/2004.
Managing Devices Lesson 5. Objectives Objective Domain Matrix Technology SkillObjective Domain DescriptionObjective Domain Number Connecting Plug-and-Play.
Chapter 4 Version 1 Virtual LANs. Introduction By default, switches forward broadcasts, this means that all segments connected to a switch are in one.
Hackathon #1 From Snack to Sequence
Hardware, 010 – Revision notes Scales use Controller board O/Ps for Feed Control (FCE’s) Flow meters use their own on board O/Ps for Feed Control (FCE’s)
System Optimization Networking
© 2013 Eaton Corporation. All rights reserved. Installing easySoft-Basic 6.
Workflows to set up acquisition methods for scheduled sMRM-HR on the TripleTOF 5600 Start from a data dependent acquisition (DDA) Perform data base search.
C Copyright © 2006, Oracle. All rights reserved. Oracle Secure Backup Additional Installation Topics.
 Step 1: Enabling the keyboard in window Skip this step if the computer does not enter sleep mode or if the computer.
Windows Vista Configuration MCTS : Maintenance and Optimization.
Lesson 9: SOFTWARE ICT Fundamentals 2nd Semester SY
The Polymerase Chain Reaction
After Construction Name: Per #:.
3DVision GPRS connection
Overview Modern chip designs have multiple IP components with different process, voltage, temperature sensitivities Optimizing mix to different customer.
Installing Printers Most printers are boxed with paper or Styrofoam inserts placed to ensure there is no damage during shipping. Make sure all of these.
Managing Your Network Environment
Project Target Develop a Web Based Management software suit that will enable users to control Hardware using standard HTTP & Java Applet compatible web.
App2Talk Tutorial App2Talk Tutorial.
Pilot Watcher Product Overview V5.3
Why Won’t My Arduino Work?

Network Load Balancing
StatSensor® Creatinine Operator Training Program
Installing Software Tutorial 11.
Chapter 5: Switch Configuration
Software Testing With Testopia
Chapter 6: Network Layer
CONFIGURING HARDWARE DEVICE & START UP PROCESS
The BioTector B3500ul TOC analyzer Process Tests
AT91RM9200 Boot strategies This training module describes the boot strategies on the AT91RM9200 including the internal Boot ROM and the U-Boot program.
How to Use poll everywhere
Administration Training
Smita Vijayakumar Qian Zhu Gagan Agrawal
Mexico 24 Hours Advance Manifest
Shipping, Receipt and Infusion February 2019 Update
Lecture 3: Main Memory.
easYgen-3000XT Series Training
Presentation transcript:

MinION Anatomy

Pre-Run Check List Flowcell inspection Remove bubbles in fluid lines and on surface of flowcell where possible if present, & confirm conductive heat pad is installed on bottom surface of ASIC chip. 4 Check computer SSD for available storage space >150Gb 3 Make sure required Software is installed:- MinKNOW Control of MinION device & run parameters Metrichor Cloud basecalling of event data MinoTour Live monitoring / control of run while sequencing Chronolapse Screen image grabber for record keeping Poretools, poRe Sequence extraction and data summaries TeamViewer Remote control of MinION computer 1 Confirm automatic software updates and sleep modes are disabled 2

Attach Flowcell to MinION device and plug into USB3 port Start MinKNOW software and start device Name Run and start platform-QC protocol If flow-cell good proceed Prime flow-cell with 2x 500  l 1xRBF1 for 10 mins each (500  l 2xRBF  l H 2 O) Load 150  l of Library in 1xRBF1 (75  l 2xRBF1 + x  l H 2 O + 4  l Fuel  l Pre-sequencing Mix) Name run and start Sequencing Protocol – Standard / Modified :o) (Start Metrichor & required workflow plus screen capture software) Preparing & Loading MinION Device (Single Good pores >650)

Inserting Flow-cell into MinION Device Ready MinIONOpen lid Unpack flow-cell, check heat pad intact & ASIC bubble free Slide flow-cell into placeMake sure flow-cell is seated properly Plug MinION into USB3 port

Flow-cell Quality Assessment Good Bad Platform-QC scans the 2048 channels as 4 Mux -180mV with R9 & reports back single good channel assignment to each of g1 to g4 groups with up to 512 wells each. Expect Good correlation using R9 flowcells between Platform QC pore numbers and those obtained at the start of a run. >650 Pore Guarantee

Priming and Loading Flow-cell Open sample port Slowly remove any air from sample port with pipette Confirm fluidic channel is free of bubbles 2 x 10 min 500  l 1xRBF1 followed by 150  l Library Close sample portClose lid and GO!

Priming and a Loading SpotON Flow-cell Open sample port Slowly remove any air from sample port with pipette Add 75ul of Sequencing Mix to SpotON well dropwise Open SpotON port and then add 200  l RBF1 through sample port, NOT SpotON port. Close ports, lid and GO! x 10 min 500  l RBF1 through sample port 1x 10 min 300  l RBF1 through sample port Flowcell Priming

Start Run Start Sequencing Recipe Script Name run and select required Recipe Script Start Chronolapse screen capture Image grab every 30 seconds and as required at start Start Metrichor workflow Select desired workflow:- 2D basecall or WIMP Start MinUp & Open MinoTour Browser Window Issue command line parameters for read mapping and device control as below or use MinUP-GUI: minUP.exe -dbh minotour.nottingham.ac.uk -dbu USER -pw PWD -w d:\data -f c:\reference\REF.txt -u USER - c -bwa -d -ip xxx.xxx.xxx.xxx -pin XXX -s minion 4

Good or Bad Library/Flowcell ? 95% 90% 97% 96% 91%96% 84% 97% 93% 97% 17% 83% 80% 83% 55% 92% 86% 80% % of Single Good pores in Strand

Single Good Pore % in Strand as Library QC 292 / 302 = 97% Use the relative quantity of in Strand reads as a measure of library quality independent of pore number

Script Tinkering Bias-Voltage Setting & Remux Bias voltage directly controls induced current flow across the membrane, and current flow is used to assign pores to different categories. With time greater bias-voltage is required to produce current that is in the “single good” pore range. Bias-voltage is the master control. Selection or “re- mux” of pores at a particular targeted voltage must be carried out for maximum efficiency. 1 Yield Monitoring As pore numbers fall and/or reagent is depleted you will see a drop in the event yield over time. Gaining access to still functional, but unselected, pores once event accumulation rate drops below a set value makes much better use of a flow-cell. This lessens unproductive electrochemical gradient deterioration observed with standard recipe scripts. 2 Pore Shepherding Wells actively sequencing experience an electrochemical gradient deterioration that is twice that of inactive pores, but even inactive pores show a deterioration that requires bias-voltage increases for optimal functioning. Because of the 4-1 (wells - electrical channel) nature of current flow-cells this results in a spreading of the optimal bias-voltage required for a particular well depending on its on/off history. To mitigate this, sub-peak bias-voltage selection can “shepherd” well population more tightly by attempting to deplete least used wells. 3

Standard 48hr Sequencing Recipe Script g1 to g2 switch 24hrs g1 8hrs R9 48hr Genomic DNA Sequencing Script to assign g1, g2, g3 & g4 pores Example Pore Usage from retired R7.3 g2 8hrs g3 8hrs g4 8hrs g1 8hrs g2 8hrs STOP (example from previous R7.3 Version) …

Modified Scripts to Maximise Flowcell Yields ….. Yield dependent time After remux voltage scan Yield dependent time Switch when hourly event yield drops below 67% of first hour of this segment Multi-Voltage Re-mux scan selecting one within a defined range of the greatest “single good pore” count voltage Yield-Monitoring_Voltage-Tuning Scripts (Voltage tuned across 30mV range) Mux / Re-Mux Scan 15 min Yield Dependent Time x5 (user defined) (~1-5 hrs) -180mV Start with fresh flow-cells (If new flowcell use -180mV to start) Example Pore Usage

Run Dynamics:- SQK006 Standard Recipe Script Event Accumulation Abasic Current Pore Usage

Run Dynamics:- SQK006 Tuning Recipe Script Abasic Current Pore Usage Event Accumulation

Standard Script (Chip65) Tuning Script (Chip66) Individual Pore Read Starts