BROADBAND STATUS UPDATE January 31, 2012 1. County-Wide Broadband Study Long-standing need in the County for better telecommunications services Coverage,

Slides:



Advertisements
Similar presentations
Requirements Based Evaluation of BPL for Power System Sensing, Command and Control Applications Erich W. Gunther EnerNex Corporation
Advertisements

Digital Energy Communications GE MDS Communications Network for AMI.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
PARKS: Major Policy Topics  Park development guidelines  Joint use of park and recreation facilities  Park accessibility  Park acquisition priorities.
MN10 - Managing Wireless Networks Building Large Scale Wireless Water Control Networks Eric Marske Product Manager ESTeem Wireless Modems.
1 Conservation: An Alternative Energy Source for Local Communities Ted Coates, Power Manager September 20, 2008.
[ 1 ] Spectrum Bridge Bandwidth Management and Spectrum Allocation solutions January 2012.
Rural Smart Grid Opportunity Christoph Inauen Director, Business Development Nokia Siemens Networks.
Gathering of State Networks: Strategies for the Next Decade PR Star.Net Government of Puerto Rico April 16-18, 2000 St. Louis, Missouri.
City Council Meeting January 18, Background  Staff receiving increasing number of inquiries regarding installation of wireless telecommunications.
Advanced Metering Infrastructure
CALTRANS WIRELESS LICENSING PROGRAM Bimla G. Rhinehart Division of Right of Way and Land Surveys.
2015 World Forum on Energy Regulation May 25, 2015
SPHOA broadband initiative Report to board October 28, 2014 Norm Zimlich and Angela Saxe.
Post Katrina Improving the Rebuilding of Highway 90 with Advanced ITS Networks and Applications…
Powering Wolverine’s Renewable Future Presented to Great Lakes Regional Wind Institute Detroit, Michigan by John P. Miceli, Energy Market Analyst March.
Scott Longhurst CalWA Vice Chairman, Education Committee.
Sharing the 700 MHz Public Safety Broadband Network with Utilities
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
Utilizing BPL to create a 21 st Century Grid. Agenda > Electrical Infrastructure Review > Oncor Electric Delivery - Current Relationship > Project Status.
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
County of Otsego IDA Broadband Feasibility Study November 25, 2014.
Wireless Broadband Service in Rural America Rural TeleCon ‘06 October 24, 2006 Paul D’Ari Spectrum Competition and Policy Division Federal Communications.
Sacramento Local Agency Formation Commission (LAFCo) Final Environmental Impact Report Amendment of SMUD’s Sphere of Influence and SMUD Yolo Annexation.
Vermont Electric Power Company, Inc Vermont’s eEnergy Smart Grid Initiative Kerrick Johnson Vice President for External Affairs.
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
RIGHT-OF-WAY DAS PROPOSAL by Newpath Networks ARIZONA The Path to Broadband Connectivity.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Building Smarter Communities
What do we mean by “Energy?
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Concept Note on Testbeds Prof Rekha Jain Executive Chair IIMA IDEA Telecom Centre of Excellence, IIM Ahmedabad, India
© 2014 Utilities Telecom Council State of the Industry “WHY TELECOMMUNICATIONS TECHNOLOGY AND NETWORKS ARE CRITICAL TO THE UTILITY OF THE FUTURE: TECHNICAL,
San Antonio: Striking the Balance FCC DAS/Small Cell Workshop May 3, 2016 Ron Nirenberg San Antonio City Councilmember Member, FCC-IAC.
Southeast LDC Gas Forum Infrastructure Updates… Expanding Your Distribution Network Beyond the Pipeline April 12, 2016 Atlanta, Georgia David Lavoie Vice.
Joint Radio Company: Making the spectrum and technology work for your business Adrian Grilli Managing Director, JRC Ltd, London Technical Adviser, European.
Dig Once (with Many Partners) The Dakota County Broadband Network State Broadband Task Force June 15, 2016.
Florida Keys Electric Cooperative Association, Inc. Storm Hardening Florida Public Service Commission May 1, 2008 Scott Newberry, CEO John Stuart, COO.
Contestability in Connections Contestability Working Group Meeting NIE/SONI Joint Presentation 9 September
Energy & Utilities. Smart metering Demand response Meter data management Distribution monitoring Fleet management Find out what Verizon can do for utilities.
Mainstream Fiber Networks partnership Proposal
Personal Communication Services & WiFi
Lessons Learned Implementing an IEC based Microgrid Power-Management System October 12, 2015 Presented by: Jared Mraz, P.E.
4G Technology.
Office of Electronic Communications (UKE)
Broadband Summary Translator Advisory Board
A local, not-for-profit electricity provider
Professional Services
CONNECTING CARS EVERYWHERE
Valley & Third Streets Redevelopment
Christopher M. Quinn, MACC, CPA, CFE, CGFO, CGMA
Internet Access Technology
City-wide LED Street Light Conversion Program
The Transition to a High DER Future
NTUA Broadband project
Planning and Development Commission
Regional Broadband 101 Efforts and Impacts
PROJECT THOR Impact on the Region
Module 4 Smart Grid Implementation Issues
Pacific Power Seismic Preparedness Update
MURDOCK VILLAGE COMMUNITY REDEVELOPMENT PLAN
Emergence of Wireless Pole Attachments in Chelan County Tri-Commission Presentation March 28, 2017.
City Council April 30, 2018 Item 13
Stimulating Rural WiMAX
Final Environmental Impact Report
New York State Smart Schools Bond Act
Waleed Iftikhar Michel Mabano
EAST MESABI JOINT WATER SYSTEM A JOINT VENTURE BETWEEN THE east range communities REQUEST A $6 million request for State Funding in 2019 to build a comprehensive.
Presentation transcript:

BROADBAND STATUS UPDATE January 31,

County-Wide Broadband Study Long-standing need in the County for better telecommunications services Coverage, speed, reliability OPALCO is uniquely positioned to help Existing redundant fiber infrastructure connecting our County to the mainland Currently building out Smart Grid capabilities Co-op model – bringing high value at low cost to our Membership Concept has been developed of a joint-use communication infrastructure that can be used to improve public safety and provide broadband service OPALCO’s Board authorized a high-level analysis and a member survey Results are encouraging and the process of developing a joint-use communication infrastructure is becoming clear 2

High-Level Analysis: Results Hybrid network: Combination of fiber to wireless endpoints (poles) FCC licensed frequency Goal: Coverage: 90% of the County (geographic) Minimum 10 Megabits per second (Mbps) Capital cost approximately $18M Construction start in 2013 Launch services in

Vision: Joint Use Network Provide a multi-use, joint-access telecommunications infrastructure for the use by the entire community: Aids the Public Safety / First Responders Network Facilities improved two-way radio communications Supports data communications, including Internet connections to mainland Supports OPALCO’s Long-Term Commitments Reliable electrical transmission and distribution systems Meter interface, load monitoring, remote operation and re-routing of power Smart Grid Applications including: Outage Management, Home Energy Monitoring, Energy Conservation Provides Reliable Broadband Access to 90% of San Juan County Builds Platform for Potential Expansion of Cellular Coverage Access and physical space on poles for cellular provider equipment Power and backhaul services 4

Conceptual Pole Design Low-impact approach Utilize existing structures, where possible Respect island aesthetics Maximum pole height of 140’ Photo on left (“mono-pine”) is example of pole camouflaging technology available now. 5

Conceptual Infrastructure Map Estimating 60 sites. Actual system design is dependent upon frequency selected. Proposed Pole or Extension Sites Proposed New Fiber Routes Existing Fiber Routes 6

Critical issues Frequency Selection and Acquisition Radio Frequency studies underway to confirm pole site locations and infrastructure layout Due Diligence Confirm business, operational and financial assumptions Transition from high-level to detailed analysis Permitting Predictability No OPALCO investment without 100% confidence that we can permit and build the infrastructure Continue to work with the County on Wireless Ordinance and land use access through existing utility franchise agreements 7

Next Steps In order to commit to acquiring the frequency spectrum and moving forward, OPALCO’s Board needs: Complete Due Diligence efforts (OPALCO) A finalized and adopted County Wireless Service Facilities Ordinance that allows OPALCO to permit and build (County) Note: Ordinance passage is a pre-requisite to OPALCO’s willingness to go forward with spectrum purchase. The project timeline is dependent on these next steps; if these contingences are addressed, frequency acquisition could occur as soon as April,

The Cooperative Approach For 75 years, OPALCO has served our member-owners “with safe, reliable, cost effective and environmentally sensitive electric utility services.” OPALCO has a long track record of balancing our members’ interests and capital with efficient utility development and services. We hope this project – through Broadband delivery and expansion of our Smart Grid capabilities – will be the next chapter in a 75-year-old story of our co-op making a difference in the quality of life for San Juan Islanders. We hope to see you on the ferry for our 75 th Annual Meeting on the ferry on Saturday, May 5 th. You can bet we’re going to be taking about Broadband! 9