Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR.

Slides:



Advertisements
Similar presentations
The Central Straw Tube Tracker In The PANDA Experiment
Advertisements

Wang Yi, Tsinghua University SoLID collaboration meeting, Status of MRPC-TOF 1 Wang Yi Department of Engineering Physics Tsinghua University,
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Oct. 5 th th International Workshop on Heavy Quarkonium 2011 Jim Ritman Mitglied der Helmholtz-Gemeinschaft Status of PANDA.
Andy White U.Texas at Arlington (for J.Yu, C.Han, J.Li, D.Jenkins, J.Smith, K.Parmer, A.Nozawa, V.Kaushik) 10/18/04 IEEE/NSS Digital Hadron Calorimetry.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
2 1/March/2015 日本物理学会大70回年次大会@早稲田大学 東大ICEPP 内山雄祐 他 MEG II collaboration.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Toward the FNAL Beam Test S. Uozumi (Kobe) May Japan-Korea meeting.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
Mitglied der Helmholtz-Gemeinschaft Calibration of the COSY-TOF STT & pp Elastic Analysis Sedigheh Jowzaee IKP Group Talk 11 July 2013.
22 September 2005 Haw05 1  (1405) photoproduction at SPring-8/LEPS H. Fujimura, Kyoto University Kyoto University, Japan K. Imai, M. Niiyama Research.
ATLAS micromegas activities (MAMMA)
Tsukuba-hall webcam 1 Beam Pipe and Vertex Detector extraction: on Nov. 10, 2010 Belle Detector Roll-out: Dec. 9, 2010 End-caps, CDC, B-ACC, TOF extraction:
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
CLAS12 Drift Chamber Prototyping
CBM Collaboration Meeting. GSI, Darmstadt CBM Silicon Tracking System. CBM-01 sensors characterization. V.M. Pugatch Kiev Institute for Nuclear.
Summary Plans Content Module assembly at CERN and Dubna Readout DAQ Procurement Stacking Summary.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
Mitglied der Helmholtz-Gemeinschaft STT News & Status Peter Wintz (FZ Jülich) for the STT group LII. PANDA CM Giessen, TRK session, Mar-18 th, 2015.
Outline Description of the experimental setup Aim of this work TDC spectra analysis Tracking method steps Autocalibration Single tube resolution Summary.
Mitglied der Helmholtz-Gemeinschaft Straw Production: Status, Plans, Timelines Peter Wintz (IKP - FZ Jülich) (A. Cebulla, I. Georgadze, V. Kozlov, S. Orfanitski)
Cluster-Jet Target Target TDR Alfons Khoukaz Institut für Kernphysik, WWU Münster, Germany PANDA Collaboration Meeting December 8-12, 2008.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
0 Characterization studies of the detector modules for the CBM Silicon Tracking System J.Heuser 1, V.Kyva 2, H.Malygina 2,3, I.Panasenko 2 V.Pugatch 2,
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
1 straw tube signal simulation A. Rotondi PANDA meeting, Stockolm 15 June 2010.
G.Alexeev for Dubna group ITEP, April 28, 2010 Muon System Status Report from Dubna Hardware : * Full Scale prototype - in preparation to be put in work.
1 J.M. Heuser − STS R&D Johann M. Heuser, GSI CBM-STS Project Leader Meeting on Experiment with external HI beams of the Nuclotron-M JINR, 4 February 2011.
Development of 100 MHz trackers
for the HADES Collaboration
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
Status of the forward tracker design
News from Cracow on the forward tracking
FEE for TPC MPD__NICA JINR
Activities on straw tube simulation
Experimental Method: 2 independent detectors on both sides of IP
PANDA Muon Group Meeting, Protvino 7 June 2011 G
FCAL R&D towards a prototype of very compact calorimeter
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
STT Detector risk’s assessment
MDT and analog FEE mass production:
First results from prototype measurements
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
G.Alexeev for Dubna group ITEP, April 28, Muon System Status Report from Dubna.
STT Status & News Peter Wintz (FZ Jülich) for the STT group
STT Status Update Peter Wintz (FZ Jülich) for the STT group
PADI for straw tube readout and diamonds for MIPs and for high precision tracking beam test – Jülich, Feb Jerzy Pietraszko, Michael Träger, Mircea.
LHCf – CSN1 Trieste O. Adriani
Preparations for test of
Work packages status in Torino and perspectives
Status of the TOF Detector
Preparation of the CLAS12 First Experiment Status and Time-Line
Experimental Method: 2 independent detectors on both sides of IP
Calice Tile-HCal and Tail-catcher/Muon Tracker
Status of MUCH Electronics
Presentation transcript:

Mitglied der Helmholtz-Gemeinschaft STT News Peter Wintz (IKP, FZJ) PANDA Collaboration Meeting, Dec-2013, FAIR

Mitglied der Helmholtz-Gemeinschaft  Recent STT activities  Workshop summary  Straw production & straw layout  Readout systems  Test system installations  Beam tests 2014  STT timelines  STT pre-series test in 2015/16 STT News Dec-10, 2013Peter Wintzp. 2

Mitglied der Helmholtz-Gemeinschaft STT Workshop in Oct-2013 Dec-10, 2013Peter Wintzp. 3 STT work packages discussed  Straw and layer-module production (FZJ)  STT general mechanics (LNF)  Gas system (LNF)  Frontend / analog electronics (Krakow, FZJ)  Digital readout (Krakow, FZJ)  Detector control & HV system (IFIN-HH)

Mitglied der Helmholtz-Gemeinschaft  STT straw layout:  New straw pitch: mm (~ 10 µm gap)  Straw diameter: ~ mm (pressurized)  Mylar film wall: 27µm  Straw layer modules  Determine all straw positions (soon)  Group straws into 4-layer modules, stereo-layer modules  Periphery, mounting elements,..  Integration in mechanical frame  iteration with Dario Straw Layout in STT Dec-10, 2013Peter Wintzp. 4 straw pitch

Mitglied der Helmholtz-Gemeinschaft  Straw production  final straw film specification, leakage tests successfull series production started in Oct-2013  straw series production started in Oct-2013  completeproduction takes 3-4 years ~50% spares  complete straw mass production takes 3-4 years, including ~50% spares  Quality checks  leakage and wire tension  leakage and wire tension measurement for each straw  long-term  long-term test sample Straw Productions Dec-10, 2013Peter Wintzp. 5

Mitglied der Helmholtz-Gemeinschaft large-scale systems  Currently in preparation: large-scale systems  ASIC-ToT + TRBv3:  new ASIC chip in design, in production soon  available in (late) Q2/2014, ~ 100chips (  8ch)  FADC based readout  new design amplifiers & cabling, FPGA/FADC architecture  available in Q2/2014 Electronic Readout Status Dec-10, 2013Peter Wintzp. 6

Mitglied der Helmholtz-Gemeinschaft  Permanent STT test systems  Permanent STT test systems with DAQ in Juelich  PC network (“strawnet“)  ASIC-TRBv3 readout installed last week by Cracow  3  ASIC-boards, 96 channels  Greg‘s, Jacek‘s talks  Cosmic ray tests as preparation for next beam tests  tuning setups, straw electric coupling, HV distribution  optimise electronic parameters (ASIC shaping)  define default straw operation settings (gas gain)  clean tracking  resolution limits Test System Installations Dec-10, 2013Peter Wintzp. 7

Mitglied der Helmholtz-Gemeinschaft  Beam time requests for 2014 (COSY)  1 week in Jun-2014, protons at 3.0, 0.8, 0.6 GeV/c  1 week in Sep-2014, deuterons at 2.0, 1.3, 1.0 GeV/c  1 week in Nov-2014, protons at 2.0, 1.3, 1.0 GeV/c  dE/dx range ~ 10  mips  aim for prot./deuteron separation  2 straw setups for both readouts  8  24 straws and 8  16 straws  Optional: larger straw setups if new RO systems available Beam Tests 2014 Dec-10, 2013Peter Wintzp. 8 2 Straw setups, beam coming from the back (Big Karl COSY)

Mitglied der Helmholtz-Gemeinschaft  M3: TDR approval  M8: Pre-series test accepted  M9: Final STT construction, acceptance test  M10: Shipment to FAIR / approval for installation  M11: Ready for beam  M12: Commissioning done / ready for operation Official timelines transmitted to FAIR STT Milestones & Roadmap Dec-10, 2013Peter Wintzp. 9

Mitglied der Helmholtz-Gemeinschaft  M3: TDR approval  M8: Pre-series test accepted  M9: Final STT construction, acceptance test  M10: Shipment to FAIR / approval for installation  M11: Ready for beam  M12: Commissioning done / ready for operation Official timelines correlated with money flow STT Milestones & Roadmap Dec-10, 2013Peter Wintzp. 10

Mitglied der Helmholtz-Gemeinschaft  One complete STT sector (~ 800 straws)  final design of straw-layer modules  mechanical frame  electronic RO system (800 channels)  supply system & DCS  Assembly and installation in 2015  Beam test at COSY 2015/16  Complete! test STT Pre-Series Test Dec-10, 2013Peter Wintzp. 11 STT hexagon sector Beam

Mitglied der Helmholtz-Gemeinschaft  Tracking + dE/dx  Tracking + dE/dx measurements  position calibration by reconstructed tracks  isochrone + dE/dx calibration methods  scatter target?  fiber, foil,.. in beam  final resolution  Continuous DAQ  Continuous DAQ, (PANDA-DAQ v1?)  high particle rates ~ 1 MHz  online tracking  No magnetic field  No magnetic field, straight tracks Pre-Series Test Program Dec-10, 2013Peter Wintzp. 12 STT hexagon sector Beam