© ABB Group The ABB Solution for the E&P Industry Organization:- ONGC Limited, India Project :- Enterprise Wide SCADA System for the Production and Drilling.

Slides:



Advertisements
Similar presentations
VaShIST Tecnologies.
Advertisements

SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Striving to exceed customer demands by delivering the best.
Update on WITSML deployment in BP - Energistics Public Meeting Houston, 28 May 2009 Dr Julian Pickering Field of the Future Business Deployment.
Racco industrial consulting working according to investment law to prepare Engineering, Economic, Technology, Environmental Studies for industrial projects.
Case Study on the International Business Expansion Strategy
Zamtel Call Centre Tender PreBid Workshop 10 th March 2014.
ADAM-4572 Ethernet To Modbus Solution Ethernet to Modbus Data Gateway
AMA FiT4HANA Designed for Big Data
1 Corporate Overview. 2 Addressing the Knowledge Gap GroupCytek  Formed 2005  200 plus staff and associates including consultants, project managers,
VTS INNOVATOR SERIES Real Problems, Real solutions.
Opportunities for TETRA In the Oil & Gas Industry Robin Davis - Group Director Technology 2 nd Middle East Conference, Dubai 18 th May 2004.
Emerson’s Smart Wireless Solutions on ONGC Jack Up Rigs.
© 2012 Invensys. All Rights Reserved. The names, logos, and taglines identifying the products and services of Invensys are proprietary marks of Invensys.
SCADA FOR WATER DISTRIBUTION IC DEPT. GECGn SEC28.
Fleet Performance and Reliability in Generation Utilities
© Copyright Alvarion Ltd Gas & Oil Application Presentation.
‘Monitoring Solutions for 2001’ Rome, Italy Wednesday 31 st January, 2001.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Indian Tender Offer Process. The Process May Be Intimidating But the Rewards Can Be High For Your Efforts.
March 06, 2009 Presenting Innovative Indian Products for Telcos Stay Ahead in the Telecom Business Company: ConnectM Technology Solutions Pvt. Ltd Address:
T r a n s p a r e n t f a s t r e l i a b l e
Migrating Operations Applications to PI, by Rayan Hafiz – 2005 OSIsoft User Conferences, Frankfurt.
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
Yokogawa’s FIELDBUS solution
A First Look at WirelessHART ® An e-book by Pepperl+Fuchs.
Corporate Presentation 1.  Incorporated in the year 2000  Primary focus on Networking /IT Solutions & Services  One of the respected System Integration.
Yokogawa Electric Corporation Copyright © Yokogawa Electric Corporation Brief Introduction of ABB Industrial IT System 800xA 2004 March.
Classification: Statoil internal Status: Draft
Update on WITSML deployment in BP - Energistics Public Meeting Dubai, 19 November 2008 Dr Julian Pickering IT Programme Manager Drilling & Completions.
Marketing Department Industrial Automation Business Headquarters Yokogawa Electric Corporation ISD-MASP-S05043 Copyright © Yokogawa Electric Corporation.
© Copyright year ABB. All rights reserved BSE033264R0001, Industrial IT for improved productivity.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
ISD-MASP-S05026 Copyright © Yokogawa Electric Corporation May 2005 Page 1 Honeywell PKS R300 -System quick review June 2005 (Rev. 2) SAMURAI Activities,
Smart Oilfield and Platforms Case Study – ONGC Enterprise wide SCADA
The Internet of Things Embedded Products Overview
1 1 Presenter / date if required Independent, integrated thinking.
Introduction Graeme Orr, Atyrau, April 2011.
 Business Empowerment Bert van den Berg 11 March 2000 / Monterey.
ALMEER TECHNICAL SERVICES CO. W.L.L.
How do E&P companies run better with SAP?. Shifting Demand and Supply Patterns  Geographical match of supply and demand  Oil price volatility  Evolving.
 Asia’s largest environment solutions provider, with a strong international presence  Total water & environment management solutions for all sectors.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Westermo Oil and Gas Project Examples. Chemical Plant Monitoring Application A monitoring network for a chemical Plant, ExxonMobil Refinery & Supply Products.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Yordy Nuijts, Manager Engineering
SCADA SCADA TRAINING AJAY K BASU
Integrated Instrumentation Solutions
Global SCADA Market is Expected to Reach $48 Billion by 2024, Says Variant Market Research Bhavana Patel SEO Analyst Variant.
How SCADA Systems Work?.
INTRODUCTION The company has been founded by a group of senior professionals having immense technical knowledge and experience in the respective fields.
A SEMINAR ON INDUSTRIAL NETWORKING STANDARDS FOR IMPROVED COMMUNICATION AND CONTROL PRESENTED BY MARK MARVELLOUS .P (COE OPTION)
Oil & Gas Integrated Operations using aspenONE
PRESENTATION ON MPT ICS SYSTEM
CORPORATE PROFILE JUNE 2016
Equipment Monitoring Market
Graphite® Control Platform
Peter Erning, PSP-T11, Power Gen 2010
Technip USA – Prophix story
Russian Oil & Gas Technology Development in the Digital World
INFRASTRUCTURE SOLUTIONS
Substation Automation System
Infinium Energy Services
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
FieldLink Process Networking Introduction
GasGard 100 Control System
Enterprise Resource Planning Systems
WinCC OA
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Industrial Communication Market to grow at 10% CAGR till 2025: Global.
Presentation transcript:

© ABB Group The ABB Solution for the E&P Industry Organization:- ONGC Limited, India Project :- Enterprise Wide SCADA System for the Production and Drilling Facilities BU (Oil and Gas), ABB limited, Bangalore

The Organisation ONGC Limited – Oil and Natural Gas Corporations limited is a Navaratna Public Sector Unit. A Company floated by Government of India The Organisation ONGC Limited – Oil and Natural Gas Corporations limited is a Navaratna Public Sector Unit. A Company floated by Government of India Listed in BSE (Bombay Stock Exchange) and has market capitalisations of over 40 billion USD. Single largest company in BSE. Listed in BSE (Bombay Stock Exchange) and has market capitalisations of over 40 billion USD. Single largest company in BSE. It produces 27 MMT Crude Oil and 26 bcm of Natural Gas. It produces 27 MMT Crude Oil and 26 bcm of Natural Gas. The company has a profit of 2 busd and has Capital Expenditure over 4 busd every year. The company has a profit of 2 busd and has Capital Expenditure over 4 busd every year. Going aggressively around the world to meet India's energy requirement through a subsidiary called OVL (ONGC Videsh limited). Going aggressively around the world to meet India's energy requirement through a subsidiary called OVL (ONGC Videsh limited). ONGC also floated a joint venture with LN Mittal Steel Co (Single largest UK based steel baron) for the E&P business and has acquired block in Africa ONGC also floated a joint venture with LN Mittal Steel Co (Single largest UK based steel baron) for the E&P business and has acquired block in Africa Primary business is E&P and now venturing into the Refining and Petrochemicals sectors. Primary business is E&P and now venturing into the Refining and Petrochemicals sectors. The present E&P Business if spread across the length and breadth of India and SCADA is envisaged at present for Indian installations The present E&P Business if spread across the length and breadth of India and SCADA is envisaged at present for Indian installations Intro – The Organization ONGC Ltd.

Enterprise Wide SCADA for all Production and Drilling Facility of ONGC Spread across India and in Arabian Sea. Enterprise Wide SCADA for all Production and Drilling Facility of ONGC Spread across India and in Arabian Sea. The project is envisaged by core design and engineering team of ONGC under the initiative of Chairman of ONGC Limited The project is envisaged by core design and engineering team of ONGC under the initiative of Chairman of ONGC Limited Main reason for ONGC to think about such LARGE architecture Main reason for ONGC to think about such LARGE architecture Efficient Real time Monitoring of the Production and Drilling Parameters across all the assets in India Efficient Real time Monitoring of the Production and Drilling Parameters across all the assets in India Remote control of the production well in case of Offshore platform Remote control of the production well in case of Offshore platform Facilitate offline analysis of the Valuable/ High Producing Wells through third party E&P Applications. Facilitate offline analysis of the Valuable/ High Producing Wells through third party E&P Applications. Provide summarised information to the management for effective decision making Provide summarised information to the management for effective decision making Total Facelift in the day to day operation of ONGC Production and Drilling facility to improve the efficiency Total Facelift in the day to day operation of ONGC Production and Drilling facility to improve the efficiency The Project Envisaged

Totally 17 No of bidders took the tender, some of the major are Honeywell India, Yokogawa, Emerson, EIL, L&T, etc. Totally 17 No of bidders took the tender, some of the major are Honeywell India, Yokogawa, Emerson, EIL, L&T, etc. Only ABB and Honeywell could submit the offer due to short time and large volumes of the project. Only ABB and Honeywell could submit the offer due to short time and large volumes of the project. With in three week of submission the Honeywell bid was technically rejected on account of qualification criteria in terms of With in three week of submission the Honeywell bid was technically rejected on account of qualification criteria in terms of No Proven track record of Multi tier SCADA Architecture No Proven track record of Multi tier SCADA Architecture Non Field bus compliant RTU without Asset Management Non Field bus compliant RTU without Asset Management Capability to execute the project Capability to execute the project Only ABB Price bid is opened after technical evaluation Only ABB Price bid is opened after technical evaluation We went for a hard negotiations for 4 months period and finally won the order above 10% of ONGC budget. We went for a hard negotiations for 4 months period and finally won the order above 10% of ONGC budget. ABB two year plus pre-bid selling of the SCADA and Fieldbus compliant RTU has helped to build the confidence in ONGC and bag such a big order. ABB two year plus pre-bid selling of the SCADA and Fieldbus compliant RTU has helped to build the confidence in ONGC and bag such a big order. With this order ABB India is a Undisputed leader in upstream oil and gas solution in India. With this order ABB India is a Undisputed leader in upstream oil and gas solution in India. Competition Faced

Scope of Supply Scope of Supply Supply of Three Tier SCADA Architecture as Production SCADA and Drilling SCADA spread across 19 Assets/252 Locations in India. The Production SCADA is ABB SCADA Vision and Drilling SCADA is NOV solution Supply of Three Tier SCADA Architecture as Production SCADA and Drilling SCADA spread across 19 Assets/252 Locations in India. The Production SCADA is ABB SCADA Vision and Drilling SCADA is NOV solution RTU with FF based Instrument for the Production installation to enable data acquisition and asset management. RTU used is ABB AC800F and Total Flow series. RTU with FF based Instrument for the Production installation to enable data acquisition and asset management. RTU used is ABB AC800F and Total Flow series. Supply of 16 Data Centres including the corporate data centre across India to enable efficient operation of respective Assets. Supply of 16 Data Centres including the corporate data centre across India to enable efficient operation of respective Assets. UPS for all the 250 plus tier 1 control room of production and drilling SCADA along with FCBC for 85 no of remote RTU with solar chargers. UPS for all the 250 plus tier 1 control room of production and drilling SCADA along with FCBC for 85 no of remote RTU with solar chargers. SAP, Epinet, VRC- Integrations of Real-time and History Data. SAP, Epinet, VRC- Integrations of Real-time and History Data. 10 No Network Management Station along with firewalls and Routers for all the assets 10 No Network Management Station along with firewalls and Routers for all the assets Disaster Recovery Solution for the Tier 3 SCADA of the corporate data centre. Disaster Recovery Solution for the Tier 3 SCADA of the corporate data centre. Scope of Work Scope of Work Erections and Commissioning of above scope and warranty for one year Erections and Commissioning of above scope and warranty for one year AMC of 6 years after warranty AMC of 6 years after warranty The Scope of Supply and Work

Single Largest Instrumentation- Automation – IT Solution project finalised in India – The order value is 95 musd Single Largest Instrumentation- Automation – IT Solution project finalised in India – The order value is 95 musd Largest three tier network of Near real time process data monitoring. The no of HMI Station in a single largest Network Plus HMI Stations and 600 Plus Servers Largest three tier network of Near real time process data monitoring. The no of HMI Station in a single largest Network Plus HMI Stations and 600 Plus Servers Largest Project in term of the FF based Instrumentations and automation solution – 7500 FF instrument and 850 FFH1 segments Largest Project in term of the FF based Instrumentations and automation solution – 7500 FF instrument and 850 FFH1 segments First Ever project with FF and Hart based RTU and Asset Management. First Ever project with FF and Hart based RTU and Asset Management. Largest project in terms of Field Instrumentation scope of supply Largest project in terms of Field Instrumentation scope of supply Largest Oil and Gas producing wells connected to the SCADA system – 7000 Wells Largest Oil and Gas producing wells connected to the SCADA system – 7000 Wells Single largest contract to build 179 Control rooms, 16 Data centres and 75 Mobile Control rooms at 250 plus locations. Single largest contract to build 179 Control rooms, 16 Data centres and 75 Mobile Control rooms at 250 plus locations. Unique Features of the SCADA Project

ONGC Assets Spread In India

Group Gathering Stations (GGS) Group Gathering Stations (GGS) Gas Collecting Station (GCS) Gas Collecting Station (GCS) Central Tank Farm (CTF) Central Tank Farm (CTF) Central Processing Facility (CPF) Central Processing Facility (CPF) Early Production System (EPS) Early Production System (EPS) Gas Compressor Plant (GCP) Gas Compressor Plant (GCP) Effluent Treatment Plant (ETP) Effluent Treatment Plant (ETP) Water Injection Plant (WIP) Water Injection Plant (WIP) The Asset Details The Asset is a Onshore or an Offshore production facility in that region for the ONGC. The Asset is a Onshore or an Offshore production facility in that region for the ONGC. Tier 2 Level SCADA is proposed at the each asset location which will collect the data from Tier 1 SCADA under that asset. Tier 2 Level SCADA is proposed at the each asset location which will collect the data from Tier 1 SCADA under that asset. The Tier 1 SCADA will be used for following facilities with in the asset The Tier 1 SCADA will be used for following facilities with in the asset

Structure of Production SCADA

Typical Tier 1 Production SCADA (SCADA Vision) Config CONVERTOR HMI ENGINEERING STATION COLOR NETWORK PRINTER ALARM PRINTER RACK MOUNTED SERVERS REDUNDANT PRODUCTION SCADA SERVER HMI H1 Segments AC800 F S800 IO H1 Segments L2 SWITCH TDMA LINK To Tier 2

Router FWFW Rig Server w/ Drilling SW GEOLAB CHEMLAB Existing at Rig sideNew at Rig side TOOLPUSHER Color Inkjet Printer Database Server Sensors DAQ WITS Apps + Web Server Typical Tier 1 Drilling SCADA(NOV) Config TDMA LINK To Tier 2 Existing Rig Server to be Interfaced to Tier 1 Drilling SCADA on WITSML Protocol

Typical Tier 2 SCADA (Production and Drilling) Config WEB SERVER TRAINING SIMULATOR RACK MOUNTED SERVERS 1.REDUNDANT PRODUCTION SCADA SERVER 2.REDUNDANT DRILLING SCADA SERVER 3.DUAL REDUNDANT COMMON DATABASE SERVER 4.APPLICATION SERVER (PRODUCTION) 5.APPLICATION SERVER (DRILLING) FROM TIER 1 HMI HELP DESK ENGINEERING STATION COLOR NETWORK PRINTER B/W NETWORK PRINTER ALARM PRINTER (PRODUCTION) LEASED LINE 2 Mbps DATA TO TIER 3 LOCATION FIREWALL

Typical Tier 3 SCADA (Corporate Office) Config LEASED LINE 2 Mbps To DRS Site

SCADA Vision Applications- Well Test Automatic and Manual well test at the Tier 1 GGS and EPS SCADA Well test Data to be available UPWARD in Tier 2 and Tier 3

SCADA Vision Applications- Mass Balance, Well flow status Mass balance for the Field to Asset is provided Mass Balance for the Pipeline is provided For high flowing wells we are providing well flow status. Gas Lift Optimisation for the some of the oil wells. This cover Continuous and Intermittent Gas lift

TCP/IP FIELD SIGNALS THROUGH BARRIERS & RELAYS S800 IO With HART RLM H1 Segm ents (CBF) Control Builder F S800 IO With HART LD800 HSE PROFI BUS FF HSE Module Profibus Module AC800F RTU TCP/IP H1 Segm ents SCADA Vision Server TIER-1 STATION RTU STATION Through TDMA (Radio Frequency/V-Sat Link / OFC Link) Radio Termi nal To Other RTU Stations Terminal Sever Typical Offshore RTU Config All AC800F based RTU to have FF and Hart interface. LD800HSE is used for the FFH1 Maintenance Assist Management in Tier 1 SCADA

Type of Instrument to be supplied are as follows Type of Instrument to be supplied are as follows Mass Flow Meter with NOC – 386 No Mass Flow Meter with NOC – 386 No Thermal Mass Flow Meter – 178 No Thermal Mass Flow Meter – 178 No Ultrasonic Mass Flow Meter – 105 Ultrasonic Mass Flow Meter – 105 PT,DPT,TT on FFH1– 6000 No PT,DPT,TT on FFH1– 6000 No Radar Gauges FFH1 based – 1000 No Radar Gauges FFH1 based – 1000 No Low Power RTU ABB Total Flow XRC series Low Power RTU ABB Total Flow XRC series Well Head Mounted RTU – 12 No Well Head Mounted RTU – 12 No FDT DTM with FBB to be used for the Hart and FF configurations FDT DTM with FBB to be used for the Hart and FF configurations SCADA Vision to is Used for the Maintenance Assist Management SCADA Vision to is Used for the Maintenance Assist Management Field Instrumentations

© ABB Group 800xA in ONGC Organization:- ONGC Limited, India Project :- ONGC Hazira DCS/ESD and APC BU (Oil and Gas), ABB limited, Bangalore

ONGC Hazira – DCS/ESD/APC ONGC Hazira is a Gas Processing Complex of ONGC ONGC Hazira is a Gas Processing Complex of ONGC It has LPG, GSP, CPP and Utilities with ABB (Bailey), YIL, Honeywell DCS system installed It has LPG, GSP, CPP and Utilities with ABB (Bailey), YIL, Honeywell DCS system installed ABB, YIL and Honeywell has quoted for the Job ABB, YIL and Honeywell has quoted for the Job YIL is technically rejected and we became Lowest w.r.t Honeywell system YIL is technically rejected and we became Lowest w.r.t Honeywell system This order is a replacement of the YIL DCS of the LPG Plant. This order is a replacement of the YIL DCS of the LPG Plant. We also have N-90 /I-90 system running in the same complex for last 2 decade We also have N-90 /I-90 system running in the same complex for last 2 decade Tier 1 SCADA node is also coming up in the Hazira site for hooking this plant information to ONGC Corporate Collaboration Centre in Delhi Tier 1 SCADA node is also coming up in the Hazira site for hooking this plant information to ONGC Corporate Collaboration Centre in Delhi First Installation of the 800xA in Public Sector Oil Companies with SIL 2 and SIL3 System First Installation of the 800xA in Public Sector Oil Companies with SIL 2 and SIL3 System

ONGC Hazira – DCS/ESD/APC - Scope Scope of Supply Scope of Supply Two 800xA systems Two 800xA systems 6 PM864 Controller,6 no of PM 865 Controllers, 4500 S800 IO Points 6 PM864 Controller,6 no of PM 865 Controllers, 4500 S800 IO Points 10 HMI station and 2 ES stations 10 HMI station and 2 ES stations Safeguard System for the ESD Safeguard System for the ESD APC for the LPG Plant – ABB Italy APC for the LPG Plant – ABB Italy OPC interface of INFI -90, Honeywell GUS, Yokogawa Centum System OPC interface of INFI -90, Honeywell GUS, Yokogawa Centum System Modbus based instruments through Terminal server Modbus based instruments through Terminal server Field Instruments like PT,TT,FT etc. Field Instruments like PT,TT,FT etc. Scope of Work Scope of Work Erection and Commissioning of the DCS/ESD system with one Year Warranty Erection and Commissioning of the DCS/ESD system with one Year Warranty 5 Years of AMC after warranty. 5 Years of AMC after warranty.