Infrastructure Discussion 1 Mark A. Harral and Raul Rodriquez April 19 th, 2016.

Slides:



Advertisements
Similar presentations
Coles Point Wastewater Treatment Plant
Advertisements

Washington State Department of Health Division of Environmental HealthOffice of Drinking Water Mike Dexel Water Resources Policy Lead Municipal Water Law.
SANITARY SEWER ACCESS POLICY, 2007 AN OVERVIEW CITY OF TUSCALOOSA SANITARY SEWER ACCESS POLICY, 2007 AN OVERVIEW.
1 Bexar County Water Control and Improvement District # 10 Richard Frenzel General Manager.
Town of Plattsburgh Cumberland Head Sewer District Welcome To CUMBERLAND HEAD SEWER DISTRICT INFORMATIONAL MEETING JULY 2009.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
2010 Draft Municipal Budget
Municipal & Financial Services Group Water and Sewer Rate Study Revenue Requirements and Rates Workshop April 18, 2012 King George County Service Authority.
Pavement Evaluation Survey Results and Understanding Condition Values PCI February 19, 2014.
1 Manassas Park Town Meeting 29 October Welcome This is the first Manassas Park Town Meeting Governing Body implemented this as a way to improve.
Innovation Strategies Presented to MODE January 2014.
 Groundwater Supply ◦ Quantity ◦ Quality  Infrastructure ◦ Treatment ◦ Transmission ◦ Distribution  Response Plans ◦ Long-term ◦ Short-term ◦ Emergencies.
TOWN OF MONTREAT FISCAL YEAR Annual Budget Public Hearing and Presentation to the Board of Commissioners June 13, 2013.
Desert Sky Wind Farm January 2004 Welcome Desert Sky Wind Farm Pecos County, Texas.
Equus Beds ASR Program – Wichita’s Future Water Supply September 6, 2012.
Your Water System Sources of Water reservoir underground aquifer Energy Sources pumps gravity Distribution Network of Pipes.
Imagine the result Impact Study on MSD Rate Payers of Proposed Consolidation/Merger Phase II – Towns of Biltmore Forest, Montreat and Weaverville Presentation.
Beech Grove, Indiana TAX INCREMENT FINANCING Heather R. James, Ice Miller LLP April 18, 2013.
CITY OF MERIDIAN FY07 BUDGET HEARING Mayor – Tammy de Weerd Council President – Shaun Wardle Council Vice President – Joe Borton Council – Keith Bird Council.
April 28, 2015 City Council Workshop. City Council Goal 1 Expansion  Objective: To enhance infrastructure in order to maintain quality neighborhoods.
Limited Proceedings Water & Wastewater Reference Manual1.
Annexation Issues in Eden A History of Annexation in Eden Since 1968 NC Annexation History Current Annexation Issues in Eden January 2010.
City of Falfurrias General & Enterprise Funds Presentation By: City Administrator & Finance Director July 2, 2014.
City of Greeley Water & Sewer Department ● th Street, Suite 300 Greeley, CO ● (970) Making More Water Available.
Washington’s Water Use Efficiency Rule May Require Increased Coordination for Many Utilities Dan Sander, P.E. Senior Engineer.
Presented by: Gary Rutledge, CEO Garrut Manufacturing Corporation.
Local Government Serving the People. Public Safety Includes police and fire protection, animal control, traffic regulation, building codes Police, firefighters,
Investment in Water Infrastructure California Water Association.
Village of Almont WATER, SEWER, AND SSO RATES 2012 – 2013 FISCAL YEAR.
Regional Recycling Solutions, LLC.   County purchased 103 acres in July of 1993 from Greene Land Company  Elchin Inc purchases 40 acres in April 1998.
1 Public Hearing User Rate Adjustments April 8, 2008.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
Welcome Bexar County WCID #10 Informational Meeting.
Work Session Water Issues and Water Rate Study Topics: Fundamental Assumption Key Issues Areas of Concern / Focus Water Audit Water Meter Audit Water Rate.
Sanitary Sewer Fee Study March 4, Summary Sausalito’s 75-year-old sewer system is old and deteriorated. While the current rates have allowed the.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
DC Water 的项目合作与职业 发展机会 Chein-Chi Chang ( 張建祺 ), Ph. D., P. E. D. C. Water and Sewer Authority, USA University of Maryland, Baltimore County, USA Environmental.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Presentation to CITY OF PALM COAST, FLORIDA FINANCIAL FORECAST AND CAPITAL FACILITIES FEES ANALYSIS Prepared in Conjunction With the Utility System Revenue.
“BACK TO BASICS” November 2, 2010 CITY BOND ELECTION Facilities & Infrastructure Municipal Court Courthouse (Proposition 401) Municipal Services Maintenance.
Town Hall Meeting Presented by Mayor Kimberly Fitzpatrick Date: September 6, 2016.
Town Hall Meeting May 6, 2017 Bond Election
SPECIAL DISTRICTS AVIK BONNERJEE, R.T.A. TOMMY LEE, R.T.A.
Knoxville Utilities Board June 21, 2016
City of Petersburg Water and Wastewater Rates
Sustainable Water Infrastructure through Innovative Financing
Regulation and Development in the Edwards Aquifer Zone
Water & Wastewater Capacity Charge Work Shop
Large scale development groundwater balance
MOUNTAIN REGIONAL WATER
City of Madras System Development Charges
AMI Hidden Costs and Hidden Values
Final Rate Study Findings
MOUNTAIN REGIONAL WATER
Joshua Basin Water District Draft Findings & Rate Scenarios
Joshua Basin Water District Revised Rate Recommendations
Gull lake sewer + water authority
Compressed Natural Gas Supply Vehicles
Public Hearing Sanitary Sewer Fees
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Schacker Real Estate Corp.
Maumelle’s Financial Future
City Revenues and Expenditures
Open Space Acquisitions
Module 4: Storage and Dispensing Locations
G.F.W. School Presentation
Quarterly Budget Update 2018 first Quarter Report
Water Rate Modification – Public Hearing
The Role of financing in sustainable infrastrcture
Presentation transcript:

Infrastructure Discussion 1 Mark A. Harral and Raul Rodriquez April 19 th, 2016

 Mission Statement of City’s Water Utility  Broad Infrastructure Repairs Needed-$45M  History of City’s Water Use and Rights  Current Application for 30 a-f Industrial Use and 960 a-f Public Use Production Permits  Justification for 960 a-f Public Use Permit ◦ Wells support water users across 10,240 acres; ◦ Pipeline is 20 years past useful life and will fail; ◦ Provides 3 months to fix a manmade or weather event.  City’s Growth is above TWDB projections and existing water rights 2

 Build and maintain a resilient infrastructure and legal rights to provide the lowest cost, highest quality water possible to our water users 3

 To replace the 9 mile water main pipeline and needed repairs of Belding well field and plant are $15M;  To repair and replace the sewer system and upgraded plant is $15M  To needed investments in the police building and new land field are $15M  This Presentation only addresses the water infrastructure issues 4

 Relied on wells in permit application since 1930s;  Relied on Belding well field since 1960’s;  Existing pipeline installed and conveyed by Pecos County to City during the 1960s;  Purchased Stockton Farms and Blue Ridge Farms as secondary well field locations early 1990’s;  City built a water station before 1960s to provide water to construction and oil and gas industries; 5

 City registered 36 wells from all of the City’s property;  City only applied for HE Permits for 8,081 a-f ◦ using 4 registered wells at Belding; ◦ 8,081 a-f was only for Municipal Use; ◦ City park wells have their own HE Permits  Initial Filing Errors by City in 2005 ◦ Did not apply for Industrial Use for existing water station; ◦ Did not apply for additional Municipal Use for wells relied on by City for  Main water source prior to Belding Well field since 1930’s  Emergency Situations since at least 1960s; 6

7

 Location of Collection System/Wells  Location of Beneficial Use ◦ Existing Water Station inside Pecos County ◦ Existing Secondary RO Plant built in 2012  Customers ◦ Construction and Oil & Gas Industries ◦ Existing Water Users 8

9

 Clerical error-City did not file for an additional Historical Use Permit in 2005;  City has consistently relied upon these wells for main water source since 1930s and emergency needs for resilience purposes since 1960;  Pipeline from Belding to Ft. Stockton is 20 years past useful life and needs to be replaced;  Ft. Stockton needs existing 8,081 a-f HE permit to meet near term growth needs of City’s water users. 10

 Every week 150,000 gallons are produced to storage tank in case of emergency;  When an emergency exists, 500,000 gallons are produced a day from each well;  Wells supply water in case of emergencies to: ◦ 16 sections-10,240 acres of land; ◦ Schools and governmental buildings; ◦ Pecos County buildings; ◦ 3,600 meters equivalent to over 8,000 citizens 11

12

13

 TWDB projects are significantly lower than current City’s use of water;  City is growing between 9.66% to 7.55% based on annual Sales Tax Revenue;  City’s water usage increasing between 2.73% to 3.25% a year based on Historical data;  By 2030-City May Exceed 8,081 Existing Water Rights 14

15

16

17

18

19

20

 The City’s production permit application for emergency use has nothing to do with selling water to Republic Water Company  The City’s production permit application has everything to do with providing water to our existing customers with MPGCD 21