26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.

Slides:



Advertisements
Similar presentations
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Advertisements

SESAME – TAC 2012: M. Attal Maher Attal SESAME Booster Characterization.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
Progress of the BEPCII Injection System Kang Wen.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Magnets for Mu2e Resonant Extraction: Design and Scope Changes V.Nagaslaev 05/09/2013.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
Spares for Critical Items Kickers W. Weterings SPS Consolidation Review Laurent Ducimetiere, Patrick Faure, Luis Miguel Coralejo Feliciano, Remy Noulibos,
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
1 V. Kashikhin for ILC ALCPG 2007, FNAL Meeting October 23, 2007 Ring to Main Linac Magnets.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
SBDS – MKDV/H: The new MKDV Generator and additional Magnet for BA5 installation V. Senaj, L. Ducimetière November 20 th 2015.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
 Based on 2+2 Roman Pot Stations on each side of ATLAS at ~ 240 m from the Interaction Point  Aim in Run 2 at measuring the total cross section and.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
LIU-ABT systems: SPS T. Kramer, E. Carlier, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 4 th November /11/2014 SPS LIU-ABT Systems Review2.
R. A. Barlow, LIU-PSB review, 20 Nov BI.DIS Pulse generators controls R.A.Barlow, LIU-PSB review, 20 Nov
PSB-PS TRANSFER AT 2 GEV - CONCEPTS AND OPTICS W. Bartmann, J. Abelleira et al. ABT LIU Review, 20-Nov-15.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
PSB Reference Magnet (for the 2.0 GeV upgrade) A.Newborough 16 th October 2014.
ECR - PSB: New KSW magnet in 16L1 Luis Feliciano, 4 th February.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
MTE commissioning status S. Gilardoni, BE/ABP With C. Hernalsteens and M. Giovannozzi.
LIU-SPS T. Kramer, L. Ducimetiere, L. Sermeus, J. Uythoven LIU-IONS 20 th November /11/2015 LIU-ABT Review - SPS2.
2 BT.KFAs kicker rise time measurements (December 2015) L. Sermeus TE/ABT/FPS LIU-PSB meeting, 19 th January 2016.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
MKDV upgrade LIU-SPS ABT meeting V. Senaj, L. Ducimetiere, P. Faure November 4 th 2014.
Wim Weterings Remy Noulibos
Linac4-PSB 160 MeV connection readiness review
SMH16 eddy current septum
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
PS / Booster septa control
CT Hardware Overview and Issues
LINAC4 ADVISORY COMMITTEE
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU Wire Scanner Milestones June 2017
(Beam) Impact of MTE on the PS septa
LIU / HL-LHC Cost and Schedule Review
Options and Recommendations for TL and Dumps
AD consolidation activities in LS2
ELENA Beam Transfer Workpackage
EC Activities Status for the LIU
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Emittance growth AT PS injection
Status of the BI Work Package in the LIU-PSB frame
Possible causes for SPS ZS2 misalignment
Acknowledgments: LIU-PT members and deputies, H. Bartosik
STUDIES OF THE STRIPLINE KICKER FOR BEAM EXTRACTION FROM THE CLIC DRs
LIU and TE/ABT/PPE activities
Update on the PSB Transfer Lines
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
Beam Injection and Extraction Scheme
Strip-line Kicker R&D at KEK-ATF
CLIC DR EXTRACTION KICKER DESIGN, MANUFACTURE AND EXPERIMENTAL PROGRAM
Status of the BI Work Package in the LIU-PSB frame
Presentation transcript:

26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W. Bartmann, L. Ducimetiere, Mike Hourican, T,. Kramer, Thierry Masson, Antoine Prost, L. Sermeus

Outline PSB extraction area and septa BE.KFA14L1 BE.SMH15L1 BT.SMV10 BT.KFA10 BT.SMV20 BT.KFA20 Conclusions 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 3

Equipment concerned 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 4 SMV10 septum – Vertical recombination 4 to 2 SMV20 – Vertical recombination 2 to 1 BESMH - Horizontal Extraction Septum KFA14L1 - Horizontal Extraction Kicker KFA10 kicker – Vertical recombination 4 to 2 KFA20 kicker – Vertical recombination 2 to 1

Extraction BE.KFA14L1 LIU-PSB meeting, Status of BE and BT kickers and septa 5 1 vacuum tank installed ~ magnets (4 per ring, 2 types) No spare All magnets have been refurbished in 2000 for the 1.4 GeV upgrade. The poor quality glued original ferrite blocks have been replaced by C shaped ones of 8C11 type. 26/11/2015

Extraction BE.KFA14L1 LIU-PSB meeting, Status of BE and BT kickers and septa 6 1 generator per ring supplies for magnets in parallel PFL made of 4×25 Ohm SF 6 cables in // Transmission cables same type as PFLs Nominal 2GeV → 55 kV (max. 60 kV); increased breakdown risk ‘PSB to PS Kicker’ functional spec released. System measured in lab: no saturation rise time assumed to be within spec LIU planning: Design and build improved full spare (lower beam impedance, improved magnet impedance matching) Ready by end of LS2; not installed 26/11/2015

BESMH 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 7

BESMH Horizontal Extraction Septum 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 8 Excitation current increased from 7 kA to 9.6 kA Deflection angle increased from 47 mrad to 49 mrad Cross section of in-vacuum copper busbars increased from 200 mm 2 to 400 mm 2 In-parallel cooling scheme per vacuum tank – cooling capacity increased from 1.9 l/min to 6.6 l/min No change of envelope and no impact on other facilities => no ECR No functional nor engineering specification planned. Scope of the upgrade

BESMH Horizontal Extraction Septum 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 9 Project status and outlook 1 system (tanks 1 and 2) upgraded, ready for installation during EYETS. 1 system (tanks 3 and 4) currently installed in the booster since To be upgraded after exchange and a cool-down period. Budget requested: 60 kCHF; code Spent 59.5 kCHF APT WU completed No APT WU for installation (standard exchange covered by exploitation). Cool down period

BT 1 4.SMV10 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 10

26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 11 Increase of magnetic length to 1225 mm -> increase magnet physical length to 1300 mm; Preserve aperture (60.4 h x 102 v); 6 magnets to be built: 2 operational + 4 spares; Displace beam observation equipment (ECR released: EDMS ); ECR for the upgrade released (EDMS ); Functional specification released (EDMS ); Engineering specification to be compiled. Scope of the upgrade SMV10 vertical recombination 4 to 2

26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 12 SMV10 vertical recombination 4 to 2 Project status and outlook Design finished. Part procurement started Tentative planning, pending available (human) resources: 2 magnets to be constructed by end of 2016 – possibly ready for installation during next year’s EYETS 2 operational spares to be ready for Q spares for Q3 2019

Kicker BT.KFA10 LIU-PSB meeting, Status of BE and BT kickers and septa 13 1 vacuum tank installed ~ magnets (2 per ring, 2 types) Glued ferrite C cores of unknown type (4L1?) No spare 26/11/2015

Kicker BT.KFA10 LIU-PSB meeting, Status of BE and BT kickers and septa 14 1 generator per ring (2&3) supplies two magnets in parallel PFL made of 4×25 Ohm SF 6 cables in // Transmission cables same type as PFLs Nominal 2GeV → 55 kV (max. 60 kV) ‘PSB to PS Kicker’ functional spec released. System to be re-measured in tunnel in December 2015 (rise time likely outside spec) LIU planning: Build new full spare with vacuum tank Design and produce parts in 2016 Build new kicker in 2017 Install during LS2 NOTE: measurements in tunnel crucial to be able to design new kicker! 26/11/2015

Work to be done: BT.KFA10 1. Measure present kicker rise time as it doesn’t fit the predicted values. Measurement performed in the ring. It seems that the poor rise time is due to the presently assumed 4L1 ferrite. Measurements will be repeated in December with a improved vertical resolution oscilloscope. LIU-PSB meeting, Status of BE and BT kickers and septa 15 BT1.KFA10 Kick rise time (2-98)% -measured 121ns -simulated 8C11: 101ns -simulated 4L1: 125ns 26/11/2015

Work to be done: BT.KFA10 2. Produce CATIA 3D models and 2D drawings of the present vacuum tank, magnets, connection boxes. 3D models ready. EN\MME waiting for our feedback before doing 2D drawings. Ferrite cross sectional area to be increased to prevent saturation at the ends. 3. Build new magnets (with new ferrite blocks) and vacuum tank and install it in the PSB during LS2. Not started yet. The magnet configuration must be slightly modified to pulse them from the same side. This work should have the highest priority. 4. Measure BT.KFA10 configuration in Lab. By using spare BT2.KFA20 (equipped with 8C11 ferrite). Aim to do this before/during YETS Modify the present kicker magnets after exchange to have an operational spare. LIU-PSB meeting, Status of BE and BT kickers and septa 16 26/11/2015

SMV20 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 17

26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 18 Increase magnetic length to 1225 mm -> increase magnet physical length to 1300 mm; Preserve aperture (60.4 h x 102 v); 3 magnets to be built: 1 operational + 2 spares; Displace beam observation equipment (ECR released: EDMS ); ECR for the upgrade released (EDMS ); Functional specification released (EDMS ); Engineering specification to be compiled. Scope of the upgrade SMV20 vertical recombination 2 to 1

26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 19 SMV20 vertical recombination 2 to 1 Project status and outlook Design finalised Part procurement started Initial planning: 2 magnets to be constructed in 2017 – installation in LS2 1 spare for Q3 2019

Transfer BT2.KFA20 LIU-PSB meeting, Status of BE and BT kickers and septa 20 1 vacuum tank refurbished in magnets designed for 800 MeV beam deflection (same as BT.KFA10 ones) 1 fully operational spare exists Ferrite type is CMD5005 (equivalent 8C11) 26/11/2015

Transfer BT2.KFA20 LIU-PSB meeting, Status of BE and BT kickers and septa 21 1 generator (magnets are charged with the PFL) PFL made of 4×25 Ohm SF 6 cables in // Transmission cables same type as PFLs Nominal 2GeV → 36.5 kV (max. 37 kV) Required ∫B.dl for 2 GeV can be achieved. Rise time of system unclear. Cannot measure ∫B.dl waveform in PSB; Spare system not identical. It will be verified if a change in optics can provide some additional margin for this equipment. NOTE: Crucial to do precise measurements on system in BT line to know what needs to be done! 26/11/2015

Work to be done: BT2.KFA20 1. Perform measurements in the ring to confirm the predicted rise time better than 105 ns. Measurements will be hopefully made in December. Vacuum chamber to be opened to install a magnetic field probe and measure the kick of one magnet. Improvements, if necessary, to be studied after the measurement. LIU-PSB meeting, Status of BE and BT kickers and septa 22 26/11/2015

Conclusions 26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 23 Extraction kicker spare 14L1 will be prepared, but less critical since present system compliant with requirements. Extraction septum ready for installation. Parts for upgrading the spare are available. Recombination septa mechanical parts manufacture is ongoing and deliverables are arriving on schedule. Installation likely in LS2, not before. Recombination kicker KFA10 outside specifications, a new kicker will be built. Design phase is on critical path now. Recombination kicker KFA20 dynamic performance unclear, but required beam deflection is within reach with present system. Crucial to do precise measurements on kickers in BT line to determine what needs to be improved to respect rise time specification!

Documentation PSB-MSMI-ES-0001 – FS of the BT.SMV recombination septa (EDMS ) PSB-MSMIC-EC-0001 – ECR for the upgrade of BT.SMV10 (EDMS ) PSB-MSMID-EC-0001 – ECR for the upgrade of BT.SMV20 (EDMS ) PSB-LJ-EC-002 – ECR for the relocation of BI equipment BT.BTV10/30 (EDMS ) PSB-LJ-EC-003 – ECR for the relocation of BI equipment BT.BTV30 (EDMS ) PS-MKKIK-ES-0001 – FS for PSB to PS kicker systems (EDMS ) /11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 24