Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.

Slides:



Advertisements
Similar presentations
Planning Tools and Techniques
Advertisements

Halaman 1 Matakuliah: J0084 / Introduction to Management and Business Tahun: 2007 Versi: 1 / 3 Pertemuan 06 (Sixth Meting) Planning Tools and Techniques.
Planning and Goal Setting
Chapter 8 Planning.
PowerPoint Presentation by Charlie Cook
Last Week 1. Looked at concepts of planning and goals 2. Reviewed types of plans according to dimensions of breadth, time, specificity and frequency of.
Planning Foundation What Is Planning?
INTRODUCTION TO BUSINESS
Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall,
Chapter 9 PLANNING TOOLS AND TECHNIQUES © Prentice Hall,
Operations Management 14 Chapter Copyright ©2011 Pearson Education.
PLANNING TOOLS AND TECHNIQUES
Planning Tools and Techniques with Duane Weaver
Operations Management 14 Chapter Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Introduction to Hospitality, 6e
PowerPoint Presentation by Charlie Cook
Planning Tools and Techniques BUS 206 Erlan Bakiev, Ph. D. Zirve University Spring 2012.
Planning Tools and Techniques
© Farhan Mir 2007 IMS Principles of Management BBA (Hons) 4 th Semester (Lectures 25,26,27) Planning Tools & techniques By: Farhan Mir.
Project ManagementDay 1 in the pm Project Management (PM) Structures.

Introduction to Business 3e 9 Part III: Management Copyright © 2004 South-Western. All rights reserved. Improving Productivity and Quality.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
PowerPoint Presentation by Charlie Cook The University of West Alabama Copyright © 2005 Prentice Hall, Inc. All rights reserved. Operations Management.
Planning and Scheduling
Chapter 8, Stephen P. Robbins, Mary Coulter, and Nancy Langton, Management, Eighth Canadian Edition. Copyright © 2005 Pearson Education Canada Inc. 1 Chapter.
Planning Tools and Techniques Module
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
8 th edition Steven P. Robbins Mary Coulter PowerPoint Presentation by Charlie Cook Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Part Three: Management Strategy and Decision Making Chapter 7: Strategic Management Chapter 8: Managing the Planning Process Chapter 9: Decision Making.
CPS ® and CAP ® Examination Review MANAGEMENT, Fifth Edition By Haney and Mazzola ©2005 Pearson Education, Inc. Pearson Prentice Hall Upper Saddle River,
Chapter9Chapter9 GLOSSARYGLOSSARY EXIT Glossary Modern Management, 9 th edition Click on terms for definitions Activities Budget Critical path Events Forecasting.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
PowerPoint Presentation by Charlie Cook The University of West Alabama Fundamentals of Management Sixth Edition Robbins and DeCenzo with contributions.
Management, Eleventh Edition by Stephen P. Robbins & Mary Coulter ©2012 Pearson Education, Inc. publishing as Prentice Hall 9A-1.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Planning Tools and Techniques Appendix B B–1. Assessing the Environment  Environmental Scanning  The screening of large amounts of information to anticipate.
Planning Tools and Techniques
Principles of Management Learning Session # 20 Dr. A. Rashid Kausar.
Chapter 20 CONTROLLING FOR ORGANIZATIONAL PERFORMANCE
Foundations of Planning
Fundamentals of Information Systems, Sixth Edition
PLANNING TOOLS AND TECHNIQUES
Foundations of Planning
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Contemporary Planning Techniques
Foundations of Planning
Foundations of Planning
Chapter 3 Managing the Information Systems Project
Management Chapter 18A Planning and Control Techniques Module
3 Planning and Goal Setting Supervision Today! 7th Edition
2. 2 Assessing the Environment Environmental scanning - the screening of large amounts of information to anticipate and interpret changes in the environment.
Planning and Control Techniques Module
Copyright ©2011 Pearson Education, Inc. Publishing as Prentice Hall.
Planning Tools and Techniques
Planning Tools and Techniques
Operations Management
Planning Tools and Techniques
Introduction to Management and Organizations
Principles of Management Learning Session # 21 Dr. A. Rashid Kausar.
PowerPoint Presentation by Charlie Cook
Organizational Culture and Environment: The Constraints
Copyright © 2005 Prentice Hall, Inc. All rights reserved.
Chapter 3 Managing the Information Systems Project
Chapter 2 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Presentation transcript:

ninth edition STEPHEN P. ROBBINS PowerPoint Presentation by Charlie Cook The University of West Alabama MARY COULTER © 2007 Prentice Hall, Inc. All rights reserved. Planning Tools and Techniques Chapter 9

© 2007 Prentice Hall, Inc. All rights reserved.9–2 L E A R N I N G O U T L I N E Follow this Learning Outline as you read and study this chapter. Techniques for Assessing the Environment List the different approaches to assess the environment.List the different approaches to assess the environment. Explain what competitor intelligence is and ways that managers can do it legally and ethically.Explain what competitor intelligence is and ways that managers can do it legally and ethically. Describe how managers can improve the effectiveness of forecasting.Describe how managers can improve the effectiveness of forecasting. List the steps in the benchmarking process.List the steps in the benchmarking process. Techniques for Allocating Resources List the four techniques for allocating resources.List the four techniques for allocating resources. Describe the different types of budgets.Describe the different types of budgets. Explain what a Gantt chart and a load chart do.Explain what a Gantt chart and a load chart do.

© 2007 Prentice Hall, Inc. All rights reserved.9–3 L E A R N I N G O U T L I N E (cont’d) Follow this Learning Outline as you read and study this chapter. Techniques for Allocating Resources (cont’d) Describe how PERT network analysis works.Describe how PERT network analysis works. Understand how to compute a breakeven point.Understand how to compute a breakeven point. Describe how managers can use linear programming.Describe how managers can use linear programming. Contemporary Planning Techniques Explain why flexibility is so important to today’s planning techniques.Explain why flexibility is so important to today’s planning techniques. Describe project management.Describe project management. List the steps in the project planning process.List the steps in the project planning process. Discuss why scenario planning is an important planning tool.Discuss why scenario planning is an important planning tool.

© 2007 Prentice Hall, Inc. All rights reserved.9–4 Assessing the Environment Environmental ScanningEnvironmental Scanning  The screening of large amounts of information to anticipate and interpret change in the environment.  Competitor Intelligence  The process of gathering information about competitors—who they are; what they are doing –Is not spying but rather careful attention to readily accessible information from employees, customers, suppliers, the Internet, and competitors themselves.  May involve reverse engineering of competing products to discover technical innovations.

© 2007 Prentice Hall, Inc. All rights reserved.9–5 Assessing the Environment (cont’d) Environmental Scanning (cont’d)Environmental Scanning (cont’d)  Global Scanning  Screening a broad scope of information on global forces that might affect the organization.  Has value to firms with significant global interests.  Draws information from sources that provide global perspectives on world-wide issues and opportunities.

© 2007 Prentice Hall, Inc. All rights reserved.9–6 Assessing the Environment (cont’d) ForecastingForecasting  The part of organizational planning that involves creating predictions of outcomes based on information gathered by environmental scanning.  Facilitates managerial decision making.  Is most accurate in stable environments.

© 2007 Prentice Hall, Inc. All rights reserved.9–7 Assessing the Environment (cont’d) Forecasting TechniquesForecasting Techniques  Quantitative forecasting  Applying a set of mathematical rules to a series of hard data to predict outcomes (e.g., units to be produced).  Qualitative forecasting  Using expert judgments and opinions to predict less than precise outcomes (e.g., direction of the economy). Collaborative Planning, Forecasting, and Replenishment (CPFR) SoftwareCollaborative Planning, Forecasting, and Replenishment (CPFR) Software  A standardized way for organizations to use the Internet to exchange data.

© 2007 Prentice Hall, Inc. All rights reserved.9–8 Exhibit 9–1Forecasting Techniques Quantitative Time series analysis Regression models Econometric models Economic indicators Substitution effect Qualitative Jury of opinion Sales force composition Customer evaluation

© 2007 Prentice Hall, Inc. All rights reserved.9–9 Making Forecasting More Effective 1.Use simple forecasting methods. 2.Compare each forecast with its corresponding “no change” forecast. 3.Don’t rely on a single forecasting method. 4.Don’t assume that the turning points in a trend can be accurately identified. 5.Shorten the time period covered by a forecast. 6.Remember that forecasting is a developed managerial skill that supports decision making.

© 2007 Prentice Hall, Inc. All rights reserved.9–10 Benchmarking The search for the best practices among competitors and noncompetitors that lead to their superior performance.The search for the best practices among competitors and noncompetitors that lead to their superior performance. By analyzing and copying these practices, firms can improve their performance.By analyzing and copying these practices, firms can improve their performance.

© 2007 Prentice Hall, Inc. All rights reserved.9–11 Exhibit 9–2Steps in Benchmarking Source: Based on Y.K. Shetty, “Aiming High: Competitive Benchmarking for Superior Performance,” Long Range Planning. February 1993, p. 42.

© 2007 Prentice Hall, Inc. All rights reserved.9–12 Allocating Resources Types of ResourcesTypes of Resources  The assets of the organization  Financial: debt, equity, and retained earnings  Physical: buildings, equipment, and raw materials  Human: experiences, skills, knowledge, and competencies  Intangible: brand names, patents, reputation, trademarks, copyrights, and databases

© 2007 Prentice Hall, Inc. All rights reserved.9–13 Allocating Resources: Budgeting BudgetsBudgets  Are numerical plans for allocating resources (e.g., revenues, expenses, and capital expenditures).  Are used to improve time, space, and use of material resources.  Are the most commonly used and most widely applicable planning technique for organizations.

© 2007 Prentice Hall, Inc. All rights reserved.9–14 Exhibit 9–3Types of Budgets Source: Based on R.S. Russell and B.W. Taylor III. Production and Operations Management (Upper Saddle River, NJ: Prentice Hall, 1995), p. 287.

© 2007 Prentice Hall, Inc. All rights reserved.9–15 Exhibit 9–4Suggestions for Improving Budgeting Collaborate and communicate. Be flexible. Goals should drive budgets—budgets should not determine goals. Coordinate budgeting throughout the organization. Use budgeting/planning software when appropriate. Remember that budgets are tools. Remember that profits result from smart management, not because you budgeted for them.

© 2007 Prentice Hall, Inc. All rights reserved.9–16 Allocating Resources: Scheduling SchedulesSchedules  Plans that allocate resources by detailing what activities have to be done, the order in which they are to be completed, who is to do each, and when they are to be completed.  Represent the coordination of various activities.

© 2007 Prentice Hall, Inc. All rights reserved.9–17 Allocating Resources: Charting Gantt ChartGantt Chart  A bar graph with time on the horizontal axis and activities to be accomplished on the vertical axis.  Shows the expected and actual progress of various tasks. Load ChartLoad Chart  A modified Gantt chart that lists entire departments or specific resources on the vertical axis.  Allows managers to plan and control capacity utilization.

© 2007 Prentice Hall, Inc. All rights reserved.9–18 Exhibit 9–5A Gantt Chart

© 2007 Prentice Hall, Inc. All rights reserved.9–19 Exhibit 9–6A Load Chart

© 2007 Prentice Hall, Inc. All rights reserved.9–20 Allocating Resources: Analysis Program Evaluation and Review Technique (PERT)Program Evaluation and Review Technique (PERT)  A flow chart diagram that depicts the sequence of activities needed to complete a project and the time or costs associated with each activity.  Events: endpoints for completion.  Activities: time required for each activity.  Slack time: the time that a completed activity waits for another activity to finish so that the next activity, which depends on the completion of both activities, can start.  Critical path: the path (ordering) of activities that allows all tasks to be completed with the least slack time.

© 2007 Prentice Hall, Inc. All rights reserved.9–21 Exhibit 9–7Steps in Developing a PERT Network 1.Identify every significant activity that must be achieved for a project to be completed. 2.Determine the order in which these events must be completed. 3.Diagram the flow of activities from start to finish, identifying each activity and its relationship to all other activities. 4.Compute a time estimate for completing each activity. 5.Using the network diagram that contains time estimates for each activity, determine a schedule for the start and finish dates of each activity and for the entire project.

© 2007 Prentice Hall, Inc. All rights reserved.9–22 Exhibit 9–8Events and Activities in Constructing an Office Building

© 2007 Prentice Hall, Inc. All rights reserved.9–23 Exhibit 9–9A Visual PERT Network for Constructing an Office Building Critical Path: A - B - C - D - G - H - J - K

© 2007 Prentice Hall, Inc. All rights reserved.9–24 Allocating Resources: Analysis (cont’d) Breakeven AnalysisBreakeven Analysis  Is used to determine the point at which all fixed costs have been recovered and profitability begins.  Fixed cost (FC)  Variable costs (VC)  Total Fixed Costs (TFC)  Price (P) The Break-even Formula:The Break-even Formula:

© 2007 Prentice Hall, Inc. All rights reserved.9–25 Exhibit 9–10Breakeven Analysis

© 2007 Prentice Hall, Inc. All rights reserved.9–26 Allocating Resources: Analysis (cont’d) Linear ProgrammingLinear Programming  A technique that seeks to solve resource allocation problems using the proportional relationships between two variables.

© 2007 Prentice Hall, Inc. All rights reserved.9–27 Exhibit 9–11Production Data for Cinnamon-Scented Products

© 2007 Prentice Hall, Inc. All rights reserved.9–28 Exhibit 9–12Graphical Solution to Linear Programming Problem Max. Assembly Max. Manufacturing Max. Assembly Max. Profits

© 2007 Prentice Hall, Inc. All rights reserved.9–29 Contemporary Planning Techniques ProjectProject  A one-time-only set of activities that has a definite beginning and ending point time. Project ManagementProject Management  The task of getting a project’s activities done on time, within budget, and according to specifications.  Define project goals  Identify all required activities, materials, and labor  Determine the sequence of completion

© 2007 Prentice Hall, Inc. All rights reserved.9–30 Exhibit 9–13Project Planning Process Source: Based on R.S. Russell and B.W. Taylor III, Production and Operations Management (Upper Saddle River, NJ: Prentice Hall, 1995), p. 287.

© 2007 Prentice Hall, Inc. All rights reserved.9–31 Contemporary Planning Techniques (cont’d) ScenarioScenario  A consistent view of what the future is likely to be. Scenario PlanningScenario Planning  An attempt not try to predict the future but to reduce uncertainty by playing out potential situations under different specified conditions. Contingency PlanningContingency Planning  Developing scenarios that allow managers determine in advance what their actions should be should a considered event actually occur.

© 2007 Prentice Hall, Inc. All rights reserved.9–32 Exhibit 9–14Preparing for Unexpected Events Identify potential unexpected events. Determine if any of these events would have early indicators. Set up an information gathering system to identify early indicators. Have appropriate responses (plans) in place if these unexpected events occur. Source: S. Caudron, “Frontview Mirror,” Business Finance, December 1999, pp. 24–30.

© 2007 Prentice Hall, Inc. All rights reserved.9–33 Terms to Know environmental scanningenvironmental scanning competitor intelligencecompetitor intelligence forecastsforecasts quantitative forecastingquantitative forecasting qualitative forecastingqualitative forecasting benchmarkingbenchmarking resourcesresources budgetbudget schedulingscheduling Gantt chartGantt chart load chartload chart PERT networkPERT network eventsevents activitiesactivities slack timeslack time critical pathcritical path breakeven analysisbreakeven analysis linear programminglinear programming projectproject project managementproject management scenarioscenario