Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY.

Slides:



Advertisements
Similar presentations
PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS PRE-QUALIFICATION/ SHORT LISTING OF CONSULTANTS.
Advertisements

Office of Purchasing and Contracts Research Funded Procurement Outreach Training Level III Procurements $50,000 and Above.
Prepared by Andrée M. Cohen, Purchasing Administrator CITY OF NEW ORLEANS 2012 PROCUREMENT & PURCHASING PROCESS TRAINING CITY OF NEW ORLEANS 2012 PROCUREMENT.
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
Session 8 Implementing PPPs
Open Procurement Process Gauteng Provincial Treasury Process Mapping 30 th October 2014.
ZHRC/HTI Financial Management Training
Tendering Procedures in Lagos State under the Public Procurement Law 2011 Presented By Engr. Akin Onimole | February 13, 2013 GM/CEO, Public Procurement.
Evaluation of Bids and Contract Award Module 6: Session 7.
Gene Shawcroft, P.E. Central Utah Water Conservancy District April 29-30, 2013.
Procurement of Consultancy Services. 2 Differences between.
Marcy Mealy Procurement Specialist CDBG Program
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction Industry Development Board development through partnership Construction Procurement documents 2c.
INTRODUCTION TO PUBLIC PROCUREMENT
WELCOME TO THE PROCUREMENT SEMINAR Procurement and Contracts An Overview of Contract Administration.
1 Bid evaluation - Works  Clarification of bids ( if necessary)  Determination of responsiveness “Substantial” responsiveness No material deviations.
CIVL202 Construction Engineering I Tutorial 2 T1Mon11:00 – 11:50 T2Wed09:00 – 09:50.
System of Public Procurement in Turkmenistan
1 1 Module II. Bidding and Evaluation Process I.Bidding documents (Stages of bidding & preparation of bidding document) II.Bid evaluation methods (principles.
Module 10 Organizing Procurement Session 10.7 Procurement of Goods:
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
PROCUREMENT POST REVIEW OF WORLD BANK FINANCED PROJECTS IN INDIA October 11, 2007.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
1 PRESENTATION ON TENDERING REQUIREMENTS Presented by Kenya National Highways Authority (KeNHA) Team.
Session “International standards for tender submission” Bid opening and bid evaluation Ľubica Páleníková EBRD-Consultant, WOLF THEISS Kiev, 1-2 March 2012.
United Nations Procurement Division
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
EU-TURKEY CHAMBER FORUM PROJECT (ETCF) ETCF is funded by the European Union. 1 EU-TURKEY CHAMBER FORUM EU TURKEY CHAMBERS PARTNERSHİP GRANT SCHEME PROCUREMENT.
1 Bölgesel Rekabet Edebilirlik Operasyonel Programı’nın Uygulanması için Kurumsal Kapasitenin Oluşturulmasına Yönelik Teknik Yardım Technical Assistance.
Advanced Project Management Project Procurement/Contract Management Ghazala Amin.
VALUE FOR MONEY 1 OGC buying.solutions Procurement of Projects Presented by Andy Hamer Pre Accession Advisor, Finance Ministry.
UNDP Bangladesh Procurement Fair Objectives of the Fair; - UNDP Procurement principles; - Procurement plan ; - UNDP Procurement Roadmap;
Procurement in Projects Financed by Islamic Development Bank
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Procurement in Projects Financed by Islamic Development Bank Presented during Project Start-up Workshop September 2015, Jakarta, Republic of Indonesia.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
INVITATION TO TENDER PROCEDURE INVITATION TO TENDER PROCEDURE IT–4144/SMB/HL-LHC (Point 1) IT-4155/SMB/HL-LHC (Point 5)
RPA1 Standard Bidding Documents for the Supply and Installation of Information Systems Invitation to Bids (ITB) and Bid Data Sheet (BDS) February 27- Mar.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Instruction of NCP to Procurement and Small Scale Contracting funded from the EEA and Norwegian Funds Czech-Norwegian research programme CZ09.
BOS 1 Procurement of Goods and Works Asian Development Bank Business Opportunities.
THE PROCUREMENT PROCESS (PROCUREMENT METHODS, PROVISIONS ON PROCEEDINGS AND STANDARD DOCUMENTS)
The Public Tendering and Bidding (招投标) Law of the People's Republic of China Effective since January 1, 2000.
Building Capacity of SMEs for Participation in Public Procurement Draft Presentation for Training of Trainers June 2014.
FIDIC Tendering Procedures
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Evaluation of Expression of Interest and Proposals
Tender Evaluation and Award Process
Preparation of a tender and tender documents
Content of Tender Dossier - Instructions to Tenderers - Tenders
Award Management Services
((Organizing relationship between the Owner and Contractor involved in construction project at Palestine)) By: Maw`ed Abu Shamleh Malaak Hamaydi Supervisor:
Administration of a FIDIC Contract - Financial Management
Evaluation Grids Evaluation Grids.
What is a grant? A direct financial contribution – donation – from EU budget An action - contributing to EU policy achievement Functioning of a body acting.
Bidding Requirements Review Questions.
Evaluation - Committee & Stages -
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
BIDDING AND STANDARD BIDDING DOCUMENTS (SBDs)
Bid Evaluation and Award
Clarification meeting for tenderers
Engineering Project Tendering.
WORLD BANK Evaluation Process (Goods/Works)
United Nations Procurement Division
Provision of HR Services, UNOPS Nepal
HMPPS Innovation Grant Programme (2020 – 2022)
Presentation transcript:

Assessment of the Bidding Process in Construction Project ABDULLAH H. ABU ZANT. AYMAN K. ILAIWI. MOHAMMED FADEL. SODQI M. ALHNAINI. AN-NAJAH NATIONAL UNIVERSITY FACULTY OF ENGINEERING AND INFORMATION TECHNOLOGY CIVIL ENGINEERING DEPARTMENT

Outline MethodologyBid Evaluation in PalestineBid Evaluation in Jordan and ComparisonBid Evaluation in UAE and ComparisonBid Evaluation in Japan and ComparisonConclusions and Recommendations

Methodology The main objective of this research is to assess the bid process in Palestine. In order to achieve this main objective, many activities will be proceeded, the following are activities to achieve the main objective: 1.Study the process of bidding. 2.Gathering data from Central Tenders Department. 3.Gathering information about the bid process that is adopted in many countries. 4.Analyze the gathered information. 5.Comparison has been made between the Palestinian bid process and the process among the other countries.

BIDS EVALUATION AND SELECTION IN PALESTINE Introduction Opening of Tender Returns Pre-qualification and post-qualification:

Pre-qualification: Pre-qualification documents: lowest price will be recommended to award the bid

Post-qualification: There are two methods of post-qualification: Method I: firstly technical offers.. Method II: financial offers.. and if this technical offer does not meet the minimum requirements, the technical offer of the next bid will be considered.

Tenders Evaluation Evaluation criteria depends on the project funds.. Internal Funded Projects: in this case could be achieved in one of the following methods: Method I: classifications Method II: pre-qualification Method III: post-qualification

European Union Funded Projects: The evaluation accomplished in three stages: Administrative: will be verified.. Technical Evaluation: evaluated for the bidder who are qualified from the previous stage… how meets the instructions and specifications… will be eliminated… Financial Evaluation (Arithmetic Check):

European Union Funded Projects: Financial Evaluation (Arithmetic Check): study the bill of quantities… recommend the bid of the lowest price… reported to the Ministry of Finance… recommendation(s) are/are not accepted…

Bid Evaluation In Jordan Opening of Tender Returns: o The date for opening is set early. o Bids are opened in the presence of the tenders committee. o The bids envelopes are assure to be closed. Then The members of the tenders committee sign the copies of submitted bids that are being opened. o Then the bid bond must be checked. o In the case of one envelope is submitted, the technical and financial are both inside, the total price of the bid is announced.

Bid Evaluation In Jordan Opening of Tender Returns: o In the case of the submitted bids are two envelopes, which are financial and technical, the technical envelope will be opened and then evaluated, then the financial offers of the qualified bidders will be opened and evaluated.

Bid Evaluation In Jordan Evaluation of bids: o Local Projects: 1.The contractors that have the required classification are allowed to enter the bid. 2.The offer of the lowest price is recommended provide that all required documents are submitted, if not the next bid is considered. 3.Pre-qualification of the bidders is carried out in the case of some projects that are complex for example and require advanced technical capabilities in order to assure that the financial and technical capabilities of bidders are sufficient for these projects. The qualified bidders are invited to enter the bid.

Bid Evaluation In Jordan Evaluation of bids: o International Projects: achieved in two stages: 1.pre-qualification including the technical, administrative, financial status and the available equipment. This stage results in the exclusion of unqualified contractors. While the qualified contractors are invited to purchase and receive bidding documents to be able to involved in the competition. 2.financial and technical offers are submitted by the qualified bidders.

Bid Procedures In UAE There are three methods for tendering in UAE: 1.Tendering without pre-qualification and technical and financial criteria. 2.Tendering with pre-qualification. 3.Tendering with technical and financial criteria.

Bid Procedures In UAE Opening of bids: 1.Tendering without pre-qualification and technical and financial criteria. o Tenders Committee reject any bid that submitted after the specified date. o The documents will be checked and signed by the committee. o Chick for bid bond validity, and read the total price loudly.

Bid Procedures In UAE Opening of bids: 2.Tendering with pre-qualification. o First stage: pre-qualification is required and bidders in this stage submit their technical offers. o Second stage: the financial offers are submitted by the qualified bidders.

Bid Procedures In UAE Opening of bids: 3.Tendering with technical and financial criteria. o Technical offers only are opened. o Evaluate the technical offers, and select the qualified bidders (greater than 60%). o Opening of the financial offers for the qualified bidders.

Bid Procedures In UAE Methods of bidding: 1.Tendering without pre-qualification and technical and financial criteria. o It is done on one stage. o Simple projects.

Bid Procedures In UAE Methods of bidding : 2.Tendering with pre-qualification. o It is done on two stages. o Large and complex projects.

Bid Procedures In UAE Methods of bidding : 3.Tendering with technical and financial criteria. ◦It is done on one stage in which the offers are submitted including both technical and financial offers. ◦ Evaluation done in two steps.

Bid Procedures In UAE Methods of bidding : 3.Tendering with technical and financial criteria. Types of projects and their evaluation criteria: CategoryType of Projects Evaluation Criteria FinancialTechnical 1Straightforward projects80%20% 2Complex projects70%30% 3Innovative projects60%40% 4Design and construction projects (buildings)30%70% 5Design and construction projects (highways)50%

Tendering without pre-qualification and technical and financial criteria: Evaluation o The bid with the lowest price will be awarded. o When to consider the next bid?

Tendering with pre-qualification Tenders Evaluation: the evaluation process will be accomplished in two stages: o Stage I: evaluate pre-qualification proposals according to the specified criteria, the qualified bidders will be announced to submit their financial offers. o Stage II: evaluate the financial offers of the qualified bidders, the bid of the lowest price wil be awarded.

Tendering with Technical and Financial Criteria:

Bid Procedures In Japan Prequalification Evaluation. Bidding Methods. Bid opening. Bid Evaluation

Prequalification Evaluation In Japan Objective: 1.To ensure that invitations to bid are extended only for technically and financially qualified bidders. 2.To limit the number of bidders. Criteria: set before.

Prequalification Evaluation In Japan Prequalification Evaluation Process: 1.Preliminary Examination. 2.Qualification Evaluation..

Bidding Methods in Japan: Single-stage: One-envelope. Single-stage: Two-envelope. Two-stage.

Bid Opening in Japan All bids received prior to the bid submission deadline shall be opened publicly at the time, date and place specified in the instructions to bidders. Bids received after the deadline for receipt of bids shall be returned unopened to the bidder. The name of the bidder and total amount of each bid, shall be read aloud and recorded.

Bid Evaluation Procedures In Japan The purpose of bid evaluation is to compare bids which conform to the technical specifications and are responsive to the bidding documents on the basis of their evaluated cost. The responsive qualified bid with the lowest evaluated cost, shall be selected for award. Bid evaluation mainly passes through three stages; 1. Preliminary Examination, 2.Detailed Examination and 3.Awarding of the bid.

Bid Evaluation Procedures In Japan Preliminary Examination of Bids: o The purpose is to confirm whether the bids received were complete. o It shall be assured whether the bids are responsive to the bidding documents, whether the required securities have been provided and whether documents have been properly signed. o If a bid is not substantially responsive to the bidding documents, it shall be rejected.

Bid Evaluation Procedures In Japan Detailed Examination: o Firstly, the technical evaluation is made and the qualified bids should be determined for; corrections for errors and provisional sums, modifications and discounts, currency conversions, analysis of bill of quantities, price deviations and adjustments. o Secondly, the financial proposals will be evaluated. Awarding the bid: o The contract is awarded to the lowest price responsive bid.

Conclusion We have got an out comes which contains both similarities and differences : Similarities : 1.selecting of the most responsive and economic bidder is very important 2.transparency and equality. 3.bidding process have been reviewed generally 4.The process for Palestine, and the process for Jordan, United Arab Emirates and Japan 5.Pre-qualification procedure 6.Facing obstacles

Differences “comparison” Several countries have been taken into consideration Palestine VS Jordan Palestine VS UAE Palestine VS Jaban

Recommendations 1.Pre-qualification is important. 2.Uniform BOQ. 3.Workshops and courses. 4.The new Tendering and Procurement Law for the Governmental Works.