© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.

Slides:



Advertisements
Similar presentations
MANAGING PROJECT SCHEDULING
Advertisements

CP Chapter 4 Schedule Planning.
Work Breakdown Structures
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Chapter 10: Project Schedule Planning
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
PMP/CAPM Prep Workshop Time
Management & Development of Complex Projects Course Code - 706
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Project Time Management
Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Copyright 2008 Introduction to Project Management, Second Edition 1  Project time management involves the processes required to ensure timely completion.
Project Time Management
Importance of Project Schedules
Chapter 3 Managing the Information Systems Project
Project Time Management
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 6 Project Time Management.
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Chapter 6: Project Time Management
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Quick Recap. Work Breakdown Structure (WBS): Set of activities to do (“use cases”) Formats of WBS Risk associated WBS Approaches for WBS Dependency Graph:
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
Advanced Project Management Project Time Management Ghazala Amin.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Project Time Processes – Part 1 C ertificate IV in Project Management
Develop Project Charter
Chapter 3 Managing the Information Systems Project
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
SOFTWARE PROJECT MANAGEMENT
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Project Time Management Based on PMBOK 5 th Edition Abdelrahman Sheta, PMP,ITIL 1PMP - Project Time Managementfacebook.com/Sheta.Page.
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Chapter 3 Managing the Information Systems Project
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Time Management.
Project Management MGT 30725
Managing the Information Systems Project
Manage Project Time Project Time Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
Plan Schedule Management
WORK BREAKDOWN STRUCTURE
Chapter 6: Project Time Management
Chapter 6: Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Project Time Management
Project Theory and Application
Project Time Management
CIS12-3 IT Project Management
Project Management Process Groups
Project Time Management
P ROJECT M ANAGEMENT Skills.
Project Time Management
Project Time Management
Importance of Project Schedules
Project Time Management
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George

© 2008 Prentice Hall6-2 What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their duration Scheduling activities are part of project time management

© 2008 Prentice Hall6-3 Sequencing Requires: –Identification of any project technical constraints –Safety or efficiency considerations –Environmental politics –Availability of required resources –Completion of prerequisite processes

© 2008 Prentice Hall6-4 Scheduling Process Steps 1.Creating a work breakdown structure (WBS) to identify required project components 2.Defining the activities needed to complete each of these components 3.Determining the most efficient sequencing order of these components

© 2008 Prentice Hall6-5 Schedule Development & Usage Schedule developed during initiation or planning stage Followed and updated during the execution stage Used for project tracking during control stage

© 2008 Prentice Hall6-6 Top 5 Project Management Challenges 1.Lack of clarity in scope of the project 2.Shifting organizational priorities 3.Project changes not well managed 4.A lack of project management skills 5.Training of project sponsors

© 2008 Prentice Hall6-7 Project Schedule Modifications Why? –Business environment changes Internal – change of strategic objectives External – reaction to competitor actions –New technologies become available –Reaction to unforeseen events

© 2008 Prentice Hall6-8 Cone of Uncertainty

© 2008 Prentice Hall6-9 Project Scheduling Impacted by: –Technologies New and sophisticated software Advancements in networking and web capabilities –Team processes Resource availability Resource allocation Resource assignment –Scheduling creation and execution Developed early Followed/monitored/changed throughout project Assist in determination of progress

© 2008 Prentice Hall6-10 Computer System Components

© 2008 Prentice Hall6-11 Product Breakdown Structure Microcomputer Input KeyboardMouse ProcessorStorage CD/RWUSB (Bill of Materials - BOM)

© 2008 Prentice Hall6-12 Work Breakdown Structure (WBS) Illustrates project scope Describes project subcomponents as: –Activities (verbs) – “install new plumbing” or – Deliverables (noun) – “new plumbing”

© 2008 Prentice Hall6-13 WBS Numbering System

© 2008 Prentice Hall6-14

© 2008 Prentice Hall6-15 WBS Inputs Project scope management plan Project scope statement –Identifies deliverables –Major steps required to complete the project Experience with similar past projects Organizational process assets –Guidelines, organizational policies, procedures

© 2008 Prentice Hall6-16 WBS Techniques Decomposition participation includes: –Project team –Customers –Subject matter experts Major project deliverables identified Codes assigned to each WBS component –Level 0 - project itself –Level 1 - major deliverables –Level 2 - individual components of each deliverable –Etc. –Final level – work package

© 2008 Prentice Hall6-17 Work Package Lowest level of WBS Should contain activities that are short in duration (1 or 2 weeks) Work package activities can be completed by an individual or a small team All work packages should be similar in size or effort needed Provides input to scheduling and budget development

© 2008 Prentice Hall6-18 Three Decomposition Approaches Top-Down – traditional method Bottom-up – used for unique projects Rolling Wave – greater decomposition occurs as project components becomes more defined over time

© 2008 Prentice Hall6-19 Rolling Wave Planning

© 2008 Prentice Hall6-20 WBS Tools Templates Software –MS Visio – displays WBS in hierarchical form –MS Project – WBS displayed in tabular format (Gantt Chart)

© 2008 Prentice Hall6-21 Gantt Chart View of Microsoft Project

© 2008 Prentice Hall6-22 WBS Outputs WBS Dictionary –Description of each component –Who is responsible for development –Statement of Work (SOW) –Important milestones –Estimate of costs and required resources

© 2008 Prentice Hall6-23 Outcome of WBS Development Possible update of project scope statement and scope management plan

© 2008 Prentice Hall6-24 Scope Baseline Purpose: to determine and measure any deviations during project execution Components of Scope Baseline –Project scope statement –WBS –WBS Dictionary

© 2008 Prentice Hall6-25 Activity Definition Work packages broken down into discrete activities and attributes required to produce project deliverables Activity Definition includes: –Activity description –Resource requirements –Logical predecessor or successor activities

© 2008 Prentice Hall6-26 Required Inputs, Tools and Techniques Used, and Resulting Outputs During Activity Definition

© 2008 Prentice Hall6-27 How Much Activity Detail Is Required? Can be performed by one person or a well-defined group Has a single, clearly identifiable deliverable Has a known method or technique Has well-defined predecessor and successor steps Is measurable so that the level of completion can be determined Has a short duration – hours or days in length

© 2008 Prentice Hall6-28 Activity Tools & Techniques Templates Documentation from similar past projects Rolling wave planning can be applied

© 2008 Prentice Hall6-29 Activity Output Activity list Activity attributes –Description –Assumptions and constraints –Leads and lags –Logical relationships –Predecessor and successor activities Milestones Requested changes to project scope statement and WBS

© 2008 Prentice Hall6-30 Activity Sequencing Network diagram: a schematic display that illustrates the various activities (or tasks) in a project as well as their sequential relationships Sequential or parallel activity development

© 2008 Prentice Hall6-31 Required Inputs, Tools and Techniques Used, and Resulting Outputs During Activity Sequencing

© 2008 Prentice Hall6-32 Possible Sequencing Constraints Technical requirements and specifications Safety and efficiency Preferences and policies Resource availability

© 2008 Prentice Hall6-33 Network Diagram

© 2008 Prentice Hall6-34 Network Diagramming Methods Precedence diagramming method (PDM) Boxes and arrows  Boxes represent project activity (called nodes)  Arrows represent relationships among activities Arrow diagramming method (ADM) or Activity on Arrow (AOA)  Arrows represent project tasks or activities  Boxes represent milestones

© 2008 Prentice Hall6-35 Task Relationships

© 2008 Prentice Hall6-36 Arrow Diagramming Method (ADM)

© 2008 Prentice Hall6-37 Network Diagram in Microsoft Project

© 2008 Prentice Hall6-38 Additional Activity Type & Time Relationships Mandatory dependencies –Related activities that cannot be performed in parallel Discretionary dependencies –Relationships of activities based on preference of the project manager External dependencies –Relationship of project activities and external events

© 2008 Prentice Hall6-39 Additional Activity Type & Time Relationships (cont.) Lead Time –Time required by one task before another task can begin Lag Time –Amount of time delay between the completion of one task and the start of the successor

© 2008 Prentice Hall6-40 Questions?