Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.

Slides:



Advertisements
Similar presentations
Recent achievements and projects in Large MPGDs Rui de Oliveira 21/01/2009 RD51 WG1 workshop.
Advertisements

Status of the ATLAS MM project
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
13/04/2011Rui De Oliveira1 Resistors in Cern PCB worshop.
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
Read-out boards Rui de Oliveira 16/02/2009 RD51 WG1 workshop Geneva.
Industrial Production of MPGDs Rui de Oliveira Workshop on neutron detection with MPGD CERN October
Atsuhiko Ochi Kobe University / MAMMA collaboration 24/04/2013 RD51 mini week, WG6.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
CERN PCB workshop activities
Fabrication techniques and industrialization of MPGDs.
-Stephan AUNE- RD51 Bari 2010 CEA DSM Irfu 08/10/20101 Saclay MPGD workshop.
Atsuhiko Ochi Kobe University 25/06/2013 New Small Wheel MicroMegas Mechanics and layout Workshop.
20/04/2012Rui De Oliveira1 20/04/2012. Rui De Oliveira2 30 cm x 30 cm example.
GainEnergy resolution DIRECTION DES SCIENCES DE LA MATIERE LABORATOIRE DE RECHERCHE SUR LES LOIS FONDAMENTALES DE L’UNIVERS CENTRE DE SACLAY Contact :
Situation with industry Rui de Oliveira RD51 CERN October
Quality Control and Quality Assurance for PCB production Fabian Kuger on behalf of the MAMMA Collaboration Julius-Maximilians Universität Würzburg, Germany.
Situation with industry
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors CERN TS-DEM-PMT Capabilities.
CERN workshop upgrade Aida fund Transfer to industry Rui De Oliveira 4/13/20111Rui De Oliveira.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
EST-DEM R. De Oliveira 20 Dec., ‘04 Production of Gaseous Detector Elements  History of Gas Detectors in Workshop  Fabrication of GEM Detectors  Fabrication.
CERN Workshop upgrade Rui De Oliveira KOBE WG6 WG6 9/1/20111Rui De Oliveira.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Large area detectors Aida WP 9.2 RD51 WG6
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
Resistive bulk Micromegas panels for the TPC D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Introduction Status.
MM detector construction One or several modules per sector considerations.
M. Bianco On behalf of the ATLAS Collaboration
Low Mass Rui de Oliveira (CERN) July
24/05/2010Rui De Oliveira1 Resistive protections for Bulk Micromegas Rui de oliveira, Joerg Wotschack Venetios Polychronakos.
Resistive protections Rui de Oliveira 09/12/15
Plans for MPGD Radiation hardness tests for full detectors and components Matteo Alfonsi,Gabriele Croci, Elena Rocco, Serge Duarte Pinto, Leszek Ropelewski.
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
Micromegas for the ATLAS upgrade (MAMMA) Status report
CERN Rui de OliveiraTS-DEM Rui de Oliveira TS-DEM Large size detectors practical limits based on present knowledge.
CERN Workshop upgrade status Rui De Oliveira RD51 22/11/2011 WG6 WG6 9/1/20111Rui De Oliveira.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
R&D ON RESISTIVE TECHNOLOGY FOR MICROMEGAS BUKL STEPHAN AUNE 03/06/2015. S.Aune.
TPC Large Prototype panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Status of the Micromegas Large Prototype.
Academia meets Industry: RPC and TGC Vienna University of Technology March 25 th 2014 By R. Santonico.
 Large GEM  CMS RE1-1  Kloe  Ns2 ( No stretch No stress)  Large Micromegas  Atlas MAMA project  Large THGEM  Double phase pure argon project 
1 Fulvio TESSAROTTO CERN, 13/11/ COMPASS THGEM meeting Construction of the large size Hybrid Prototype The bulk Micromegas technology Examples of.
Results on a Large Area triple-GEM Detector at LNF 5 th RD51 Collaboration Meeting Freiburg, 25 May 2010 D. Domenici - LNF.
Suggestions for a MPGD Workshop in Frascati Rui de Oliveira 1.
GEM, Resistive M-Bulk, ThGEM detector production. Rui De Oliveira, Cosimo Cantini, Antonio Teixeira, Olivier Pizzirusso, Julien Burnens Annecy 26/04/2012.
MPGD TECHNOLOGIES AND PRODUCTION GEMMicromegas Resistive MSGC (NEW!) Rui De Oliveira 7/12/20111Rui De Oliveira.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
GEM, Micromegas detector production. detector’s dynamic range detector’s dynamic range Rui De Oliveira Catania 24/11/ /11/20111Rui De Oliveira.
Large GEM prototype production NS2 technique. Reminder NS2 technic 10 to 15mm Readout connector O-ring Drift electrode Free to slide External screws to.
1 RD51 Kolimpari June 2009 Stéphan AUNE, BULK lab at Saclay.
A High Eta Forward Muon Trigger & Tracking detector for CMS A High Eta Forward Muon Trigger & Tracking detector for CMS Archana Sharma For CMS High Eta.
Large volume GEM production Rui De Oliveira TE/MPE/EM
Rev:A ( check-->19 pages document)
European DHCAL Meeting 13/06/08
New MPGDs at CERN PCB Workshop
Update on Pavia MM mechanical prototype
GEM and MicroMegas R&D Xiaomei Li Science and Technology
The European DHCAL status
On behalf of the GEMs for CMS Collaboration
An improved design of R-MSGC
1IPHC Strasbourg, France, 2CERN, Geneve, Suisse
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Studies of Quad Pixel Module assembly using paper laminate
Saclay MPGD workshop.
MWPC’s, GEM’s or Micromegas for AD transfer and experimental lines
A DLC μRWELL with 2-D Readout
Presentation transcript:

Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1

Principle of the detectorPrinciple of the detector Structure of the detector : BULK or STDStructure of the detector : BULK or STD Production techniquesProduction techniques Technology transfer to industry statusTechnology transfer to industry status Other similar projectsOther similar projects PricesPrices OUTLINE 2

Principle 3

Resistive Bulk Micromegas real cross section 4

Read-out board with Cu strips and resistive strips Laminated Photoimageable coverlay Frame SS Stretched mesh on metal frame Laminated Photoimageable coverlay Exposure Development + cure BULK Micromegas production steps 5

BULK Micromegas examples Largest size produced: 1.5m x 0.6m Limited by equipment BULK Technology DUPONT PC 1025 coverlay BOPP Meshes T2K ILC DHCAL 6

Read-out board with CU strips and Res strips Laminated Photoimageable coverlay SS Mesh on metallic frame Exposure Development + cure STD Micromegas detector production steps 7

STD Micromegas structure Mechanical support Drift electrode Pillars (128 µm) 8

Mechanical support STD Micromegas structure 9

Limited dead zones at the edge ( good for TPC application) The PCB is the detector, it can be tested at the production site Perfect for low mass detector Self supporting 100% compatible with mass production tools available in industry Cylindrical detectors BULK advantages: BULK disadvantages: Production in a clean room is mandatory to avoid dust trapping Needs temporary frames during production Limited to 0.6m width in industry (1m at CERN) STD advantages: Extra Large possible sizes (2.4m x 1m) Can be re-opened and re-cleaned Low cost for large detectors 100% compatible with mass production tools available in industry STD disadvantages: Needs stiff and flat panels to handle read-out board and drift board Planarity below 150um is mandatory (but was easily reached in all prototypes) Paradoxically difficult to build in small size 10

Semi automatic machine Printing area 1.5m x 0.9m Screen printed resistive layer : 50um Kapton + resistive strips 50um Kapton 11

Stretching and gluing of the mesh 12

ATLAS NSW project Quantity 1728 modules including 192 spares Around 1200 m2 Size 1/3  2.3m x 0.5m 2/3  2m x 0.5m Timescale 1year Targeted Companies for mass production PCB producer Screen print frame producer Screen printing company (technical or graphic art ) 13

ATLAS NSW project construction step by step 14

PCB + readout strips 50um Kapton + resistive strips 15

PCB + readout strips 50um Kapton + resistive strips 25um solid Glue 16

PCB + readout strips 50um Kapton + resistive strips 25um solid Glue High temp Gluing 17

PCB + readout strips 50um Kapton + resistive strips 25um solid Glue High temp Gluing Pillars creation 18

PCB + readout strips 50um Kapton + resistive strips 25um solid Glue High temp Gluing Pillars creation mesh 19

2m x 1m detector Read-out board with pillars in 4 parts 10 mm thick honeycomb panel on both sides ATLAS R&D real detector Drift panel Read-out panel 20

21

Industry status 3 PCB companies have been chosen for technology transfer (France/Italy/US) The technology transfer have started 2 years ago 3 coordinators are following the 3 companies Companies' technician trainings have been organized at CERN For sizes up to 50cm x 50cm they are now able to provide all the parts nearly as STD parts Large single side read-out boards and drift board up to 2.2 x 0.5m  OK Screen printing of resistive layer up to 2.2m x 0.5m  OK Pillars on large area  OK Large size gluing (2.5m x 0.5m) in progress Vacuum press Autoclave Mesh on frame (100% std) Swiss producer Stretching 2m x 1m mesh  OK Max possible size: 3.4m x 2.2m 22

Test already performed Accuracy of copper strips on the PCB Better than 50um over 2 meters for the 3 suppliers Accuracy of drilling and milling Better than 30um Resistive layer to metallic layer max misalignment No influence up to 2 degrees misalignment Materials: STD FR4 High TG or equivalent (many suppliers up to 2.2m x 0.6m but only one for 2.4m x 0.6m) Kapton H foils or equivalent  OK Screen printed resistors or DLC vacuum deposition  OK Photoimageable coverlay from Dupont ( we are looking for a second supplier)  but OK Stainless steel mesh  OK Long term stability Strong Irradiation test to verify the full life of the detector  OK Beam test All the classical test have been performed during short beam test sessions Some small detector are already running in ATLAS since few years A set of larger detectors (1m x 0.5m) will be installed soon in ATLAS for real conditions tests 23

Other possible project with similar technology Geoscience Muon tomography Homeland security Muon tomography Calorimeters LHC upgrades ILC Muon spectrometers for HEP LHC upgrades TPC LHC upgrade ILC 24

Price for 50cm x 50cm detector! List of all the parts or processes needed to create one detector 2 Stiffening honey comb panels 1 Read-out board (1D read-out) 1 Drift board 1 Kapton foil with resistive strips Gluing the resistive layer Pillars made by photolithography 1 Stainless steel Mesh Mesh gluing 1 Drift spacer frame Screws /o-ring /gas inlet /HV plug Assembly For 1 detector 50cm x 50cm the price is in the range of 5000 CHF For 1000 x 50cm x 50cm detectors we are today below 250 CHF /detector These prices are based on offers received from European companies 25

Thank you Questions? 26