Doc.: IEEE P802.11-07/823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0300r1 Submission May 2007 Guenael Strutt, MotorolaSlide 1 LB93 Unresolved RFI Comments Notice: This document has been prepared to.
Advertisements

Doc.: IEEE /840r2 Submission June 2006 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process, June Notice: This document has been prepared to assist.
Doc.: IEEE /1528r0 Submission 22 September 2006 Naveen Kakani, Nokia, IncSlide 1 TGn PSMP adhoc Group September Closing Report Notice: This document.
Doc.: IEEE /366r0 Submission May 2005 Donald Eastlake 3rd, MotorolaSlide 1 TGs Process Notice: This document has been prepared to assist IEEE.
Coexistence Motions for LB84 Comment Resolution
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
Motions Date: Authors: January 2006
VTS SG Montréal Closing Report
LB73 Noise and Location Categories
LB73 Noise and Location Categories
TGs Closing Report Date: Authors: January 2006 January 2006
Waveform Generator Source Code
TGs Montreal Closing Report
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
[ Policies and Procedure Summary]
TGs London Closing Report
TGs London Closing Report
Motion to accept Draft p 2.0
TGs January Final Report
[place presentation subject title text here]
Motions Date: Authors: January 2006
[place presentation subject title text here]
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGp Closing Report Date: Authors: May 2007 Month Year
TGw Closing Report Date: Authors: March 2007 Month Year
[place presentation subject title text here]
TGs Melbourne Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
TGu Motions Date: Authors: May 2007 May 2007
TGs San Diego Closing Report
TGs July Closing Report
Spectrum Sensing Tiger Team
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
TGs Process, July Date: Authors: July 2006 July 2006
TGy draft 2.0 with changebars from draft 1.0
TGs January Final Report
TGv Redline D0.10 Insert and Deletion
TGs Dallas Closing Report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
[ Policies and Procedure Summary]
TGu Closing Report Date: Authors: March 2007 March 2007
May 2005 CAPWAP AHC Closing Report
TGs Denver Closing Report
Beamforming and Link Adaptation Motions
TGs Denver Closing Report
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Advanced Beaconing Schedule and Timelines
TGu Closing Report Date: Authors: May 2007 May 2007
Motion to go to Letter Ballot
TGu Motions Date: Authors: May 2006 May 2006
TGw Chair’s Report Date: Authors: July 2006 Month Year
TGs September Closing Report
TGs November Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGs March Mid-Week Report
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at. Date: Authors:

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 2 Abstract Report of TGs, ESS Mesh Networking Task Group, to the May, 2007 (Montreal, Quebec) closing Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away.

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 3 TGs Closing Plenary Report An annotated agenda is available in 11-07/572r12. The draft minutes will be posted shortly. TGs continues to make substantial progress in closing comments as shown on the following slide. The current comment resolution spreadsheet is 11-07/23r25.

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 4 TGs Closing Plenary Report SummaryTotal % Closed January Open January Closed January Total:5, %2,7123,001 Editorial:2, %6462,195 Technical:2, %2, SummaryTotal % Closed March Open March Closed March Total:5, %1,4174,296 Editorial:2, %72,468 Technical:3, %1,4101,828

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 5 PAR Amendment Motion The following motion was passed in the Task Group, in connection with which submission 11-07/391r1 was presented at the mid-week plenary: Moved, to direct the TGs Chair to bring the following motion before the Working Group : –Moved, to approve the amendment in 11-07/149r5 to the P802.11s PAR and 5 Criteria and forward this PAR and 5 Criteria amendment to the 802 Executive Committee for their approval and further transmission. –Moved: Seconded: –Yes: No: Abstain:

doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 6 TGs Closing Plenary Report TGs teleconferences have been scheduled weekly from 28 March 2007 through 23 May 2007 (except 11 April and 16 May) at 10:00 Wednesdays Eastern US time for comment resolution and meeting agenda discussions. TGs has an approved ad hoc in Eindhoven, Netherland, April 2007, to resolve Letter Ballot comments. TGs will be moving the approval of an ad hoc in Hillsboro, Oregon, June 2007, to resolve Letter Ballot comments. Goal for the May meeting in Montreal, Quebec: –Resolve Letter Ballot comments.