BUILDING LOAD NORMAL OPERATION 1. ATS are in normal position connected to utility source 2. All generator set paralleling circuit breaker open.

Slides:



Advertisements
Similar presentations
CL100D series DSP controlled Uninterruptible power supplies.
Advertisements

B757 Review Questions.
Club Car IQ Technical Information
Operating Functions.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
Project 2000 University Product Training
4Identifying Leakage Source (Mech/ Elec) 4Mechanical Air Leak- Down 4Mechanical Air Leak- Up 4Electronic Drift- Up/ Down 4Load Cell Operation 4Understanding.
Introduction to electronics lab ENGRI 1810 Using: Solderless prototype board (white board) Digital multimeter (DMM) Power Supply Signal Generator Oscilloscope.
BE-2110i VF/WIDEBAND TRANSMISSION TEST SET OPERATING OVERVIEW Slide 1 of 9.
Graphic Symbol Location 1. DIN Terminal X52 The machine is powered by electricity using copper cable with 5 wires (3 phase wires + neutral wire +
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
PSS MERLIN TELEMETRY BOARD Quick Menu
Clean Air Box Usage & Care CABs RAMs CO Monitors.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
Next Home Remote Controlled Cliqueur troubleshooting guide Start the slide show then click Next.
VAT: Volt Ampere Tester
AccuMax Multi-Point Injection Mechanics
Electrical Electricity Fuses Relays Solenoids Electrical Testing
Freedom Combi Inverter
1 Starting & Stopping Motors Pico Pico LAB#4. 2 Program a series of three basic ladder logic rungs. These basic rungs are the most common rungs found.
Industrial Machine Control
POWER PLANT USED IN TELECOM
1 Active Floor. 2 General information 3 Active floor layout Main points: EC fan Blades Grilles.
Continue The information provided in this training module covers the schematic flow charts for all ovens and ranges that utilized a preheat board, Self.
GCS 300 System Operation Application – Level 1.
Current operation (black keys) Descriptions Parameter / protection setting (blue keys) Main points to remember A B C D ? SEPAM UMIs SEPAM UMI OPERATION.
Operation Sabbath Mode - SELECT PROGRAM - Lights, alarms and fans Normal Sabbath Overview.
Service Section Technical Training December 2005.
Atlas Copco: XC 3003/4003 Controllers
Main contacts closed – RED Colour with ON
InnoSys Park Brake Tool Master Control Panel Screens Revision A, 12Dec /12/20071.
Spring Hill Assembly1 InnoSys Park Brake Tool Master Control Panel Screens 1 3-Mar-2008.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
UH-60 IPC/MOI CW2 JAMES THOMAS.
USER GUIDE TEMPERATURE CONTROLLER TR-2006 Hot runner temperature controller ShenZhen TanRex Electronic Co.ltd.
BASIC ELECTRICITY AND MAGNETISM
Automatic Transfer Switches
Starting System Circuit Operation and Testing
Wireless Relay HDL-MPR01-RF.18.
TPS - Thyristor Power Supply for Resistive/Inductive Loads
DESCRIPTION AND GUIDE TO OPERATIONS
Tool removed during cycle Fault #2
Wireless Relay HDL-MPR02-RF.18.
GROUND-FAULT GROUND-CHECK MONITOR
230 Yuma Street Denver, CO (800)
FEEDER PROTECTION UNIT
MPU-16A / FPU-16 TEST UNIT TUTORIAL
Grid feeding monitoring relay
fischertechnik® RoboPro Software for Gateway To Technology® RoboPro
HVI HIPOT TEST SET Pft sERIES.
Reduction in Downtime via Interlocking
Programming Timers.
T-6B On-Board Oxygen Generation System (OBOGS)
Synchronising Controls Overview by Robert Breadon
Pico Pico LAB#1 Starting & Stopping Motors.
Automatic Test Station for GasAlertClip Extreme Portable H2S Monitors
Lesson 14: Introduction To Sequential Control
ET 438B Sequential Control and Data Acquisition
Digital Chart Recorder Operation
ENTER OUR FRIEND MR. RELAY
easYgen-3000XT Series Training
easYgen-3000XT Series Training
easYgen-3000XT Series Training
easYgen-3000XT Series Training
Operation of Target Safety System (TSS)
System 57 Gas Control System
T-6B On-Board Oxygen Generation System (OBOGS)
Fluid Power System Electrical Control
Presentation transcript:

BUILDING LOAD NORMAL OPERATION 1. ATS are in normal position connected to utility source 2. All generator set paralleling circuit breaker open

BUILDING LOAD LOSS OF NORMAL POWER 1. Upon reciept of start signal from any ATS all generators automatically and independently start. ATS 2. Any genset at normal operating condition will closed each GCB at deadbus condition 3. Succeeding genset will synchronize to the emergency bus

BUILDING LOAD ATS TRANSFER TO EMERGENCY POWER 1. After the preset time delay expire ATS will transfer to emergency power. ATS

BUILDING LOAD TOTAL LOAD IS 80% 1. All synchronized generators will share the load equally ATS

BUILDING LOAD 1. If the total load is reduced to 20% of the total capacity while the 2 generators are running ATS 2. The system will shut off the GCB # 2 3. Priority Genset # 1 will received the reduced load

BUILDING LOAD 1. Single generator is running and reached 70% of its rated capacity ATS 2. The system will start genset # 2 synchronized to online generator and share load equally

BUILDING LOAD 1. When normal power return, ATS will transfer power from emergency into normal power after a preset time delay ATS NORMAL POWER RETURNS START SIGNAL 2. System start from ATS will be remove and the genset will turn off after cool down timer expires

1. Before any attempt to start and parallel the generators, check that all generator paralleling circuit breaker are all in OFF position. Generator controller auto mode must be switch on. 2. Press MODE push button (SELECT SEMI-AUTO MODE) located on the front face of DEIF controller (G1 and G2) and then press START button the generator will start and ramp to rated voltage and frequency. Mode Button Start Button

3. Check if run and generator voltage LED illuminates, it means the generator is protected and ready. 4. Select the generator (G1 and G2) to be online first, then press CB CLOSE/OPEN button on the DEIF controller. The controller will automatically detects if it is a paralleling mode or a single mode CB Close/Open Button Run LED

5. To synchronize the second generator, press CB CLOSE/OPEN button on DEIF controller, the digital synchroscope will automatically display during synchronization time and then it will disappear after generator breaker closed. Available loads on the bus will automatically load share to the units online. Typically the load share percentage factor is 50 %. CB Close/Open Button

6. To stop the G1 and G2 press STOP button on DEIF controller to perform engine cooling down. When the preset cool down timer elapse the engine will automatically shutdown. Stop Button

GCB Fail to Close Probable Cause Circuit Breaker control CB tripped off GCB Closing relay defective (3XG) Circuit Breaker Spring Discharged Defective closing coil, de –energized Controller relay output defective GCB control transformer defective or no output Corrective Action Check GCB control circuit, reset control CB Replace defective closing relay Manually charged circuit breaker using manual handle Replace defective closing coil Replace or check defective under voltage trip coil Check controller input / output status

GCB Fail to Open Probable Cause GCB opening relay defective (3YG) Controller relay output defecting Control supply loose Defective tripping coil Corrective Action Manually open circuit breaker using manual button on circuit breaker Check CB opening control circuit (Refer to Wiring Diagram) Check controller input / output status

Fail to Synchronize Probable Cause Analog output from controller has too low output range Toho Electronic governor controller cannot regulate the voltage and frequency of incoming generator Speed Bias control not responding Voltage Bias control not responding Corrective Action Check controller analog output maximum settings Check and Calibrate speed bias control Check and calibrate voltage bias control

` Generator fail to start Probable Cause Fault and Alarm is active Defective generator run relay (4x) MGS controller not in auto Low Battery voltage Corrective Action Check and reset fault and alarm active Replace defective run relay Switch MGS controller to auto mode Check and replace battery Check automatic battery charger if operational or defective

Probable Cause Analog output from controller has too low output range Generator fuel lines and filter is clogged Generator governor control unable to accept speed bias signal Defective controller speed governor output Faulty control cable connection Corrective Action Check and calibrate speed bias control Replace clogged fuel filter Check and calibrate generator governor control system Check control cable connection Generator not able to take load at 100 %

Probable Cause Loose governor control sensing Loose control cable connection from Toho Electronic governor control Generator fuel filter clogged Corrective Action Check all control cable connection for possible loose ( Refer to Wiring Diagram ) Replace clogged fuel filter Check and calibrate governor control systems Generator speed unstable or hunting

AGC (DG) Alarm Flashing: Unacknowledged alarms present, Fixed: Acknowledged alarms present, No alarm: no LED light up Power: indicates auxiliary supply ON Self check OK: Indicates self check OK Alarm inh: Indicates alarm inhibit active LED is ON, After engine running LED is OFF. AUTO: Only LED ON at Auto mode RUN: LED ON at Generator running. LED ON: Generator Frequency and Voltage OK LED ON: Generator Breaker ON LED OFF: Generator Breaker OFF

AGC (DG) INFO: Shifts the display three lower lines to show the alarm list. BACK: jumps one step back ward in the menu JUMP: Enter a specific menu number selection START: Start of gen-set at Semi-auto/Manual STOP: Stop of gen-set at Semi-auto/Manual Only at SEMI-AUTO: Opens the GB, if it is closed. Closes (Sync:) the GB, if it is opened. LOG: Shifts the display three lower Lines to show the event and alarm list. VIEW: Shift the first line displaying in the setup Menus. Push 2 sec to switch to master display incase more than 1 display is connected. MODE: Changes the display menu line (line four) to mode Selection.

AGC (DG) Increases the value of set point (in the setup menu). In the daily use display, this button function is used for scrolling the second line displaying Of generator values. Moves the cursor left for manoeuvring in the menu SEL: Selects the underscored entry in the fourth line of the display, enter/select button for parameter setup and Acknowledge the alarm. Moves the cursor right for manoeuvring in the menu Decreases the value of set point (in the setup menu). In the daily use display, this button function is used for scrolling the second line displaying Of generator values.

AIR CIRCUIT BREAKER LEVER LOCK BUTTON CHARGING SPRING STATUS TRIP UNIT RACKING HANDLE BREAKER POSITIONING STATUS INDICATOR ON AND OFF BUTTON CRADLE BREAKER STATUS INDICATOR

Step : 1 Manual charging of ACB by cranking the lever at least “6 times”. DISCHARGEOFF

OFFCHARGE OK CLICK Step : 2 After cranking the charger Lever, The charging spring Mechanism is in charge position state.

. CHARGE OKOFF Step : 3 The Breaker is ready to close. Close the ACB by pressing the black push button ( on button )

ONDISCHARGE The ACB is in close position. Charging spring Indicator will switch from Charge to Discharge state.

ONDISCHARGE Step : 4 The Breaker is in close Position. To off the Breaker, Press the red pushbutton

OFFDISCHARGE The ACB is in Open position.

DRAW-OUT ACB STATUS INDICATOR RACKING HANDLE LOCK PUSH BUTTON FOR WITHDRAWING THE ACB BREAKER POSITION INDICATOR

LOCK BUTTON PUSH THE LOCK BUTTON OF THE ACB BEFORE DRAW-IN/ DRAW-OUT. Note :

DRAW-IN/DRAW- OUT OF ACB DRAW-IN/DRAW- OUT CYCLE OF ACB Pull-out the racking handle GREEN ARROW RACKING-IN THE ACB RED ARROW RACKING- OUT THE ACB

DRAW OUT BREAKER POSITION INDICATOR CONNECTED POSITION WITHDRAWN POSITION TEST POSITION

Note: Push the Draw-in/out lock mechanism before drawing in and out the breaker.

Pull-out the ACB PULLING IN AND OUT OF ACB Pull-IN the ACB GREEN ARROW DRAW-OUT THE ACB RED ARROW DRAW-IN THE ACB

MICROLOGIC TRIP UNIT 2.0A INDICATING LED’s LCD SCREEN KEYS LONG TIME DELAY LONG TIME SHORT TIME RESET BUTTON