Version of document: 1.02 Software Version CBox: v3.8.0 or later Option Tilt Bucket Implementation Language: English.

Slides:



Advertisements
Similar presentations
Introduction to Using Hot Potatoes. Select the Hot potatoes option from the Start: Programs: menu as shown.
Advertisements

Using the Degree Works Planner. Click on the Planner tab in the students Degree Works account.
CHAPTER 7 ANGLE MEASUREMENT
Microsoft Word 2010 Lesson 1: Introduction to Word.
Header and footer basics Add page numbers, date, and more Think of page formatting in a book. The book title is at the top of one page, the chapter title.
LABORATORY OF APPLIED THERMODYNAMICS ARISTOTLE UNIVERSITY THESSALONIKI SCHOOL OF ENGINEERING DEPT. OF MECHANICAL ENGINEERING Dimitrios Gkatzoflias
Health and Wellness for all Arizonans Bureau of EMS and Trauma System Secure, Encrypted, On-Line EMS Services System 2015 Training Programs System Instruction.
Updating an installation with Windows® Embedded Developer Update. Windows and Microsoft are registered trademarks, All rights reversed. KRAK LLC © 2011.
Add contacts and prospects and link contacts to clients and case files. A new generation of practice management software Follow the on-screen instructions.
Organization Reports (OR1) Electronic Submission User Guide.
Word processing June 2013.
Using the “Setup Assistant” to configure your new Mac Personalizing your new Mac.
CDF CADWEB San Luis Obispo Unit Overview and Instructions.
An Introduction to Designing and Executing Workflows with Taverna Katy Wolstencroft University of Manchester.
1 of 2 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Paragraph Formatting Lesson 4.
Daretolearn.org Creating and Applying Labels Archiving.
An Introduction to Designing and Executing Workflows with Taverna Aleksandra Pawlik materials by: Katy Wolstencroft University of Manchester.
CIS—100 Chapter 7—Headers and Footers 1. Chapter Objectives 2 After successful completion this chapter you should be able to:  Add page numbers.  Add.
 When you receive a new you will be shown a highlighted in yellow box where your can be found  To open your new just double click.
#7 Useful Reports AUXOP Progress February In order to view AUXDATA reports, you must have a pdf reader program installed on your computer. Adobe’s.
Installing SAS 1. Requirements If you do not have an old copy of SAS installed on your computer, go directly to Slide 6. Make sure you have uninstalled.
Edit text and revise your documents Make changes to your document Documents get changed. You may make changes as you type, or after you finish the document.
Renesas Technology America Inc. 1 SKP8CMINI Tutorial 2 Creating A New Project Using HEW.
Page Layout You can quickly and easily format the entire document to give it a professional and modern look by applying a document theme. A document theme.
® IBM Software Group © 2009 IBM CorporationLast Update: 5/27/2009 Setup Guide for the RUI EGL Distance Learning Course RBD v7.5.1 Workstation.
SQL SERVER 2008 Installation Guide A Step by Step Guide Prepared by Hassan Tariq.
CTCT 3D Paving Training 3D UI, Configuration & Use March 2010 Phil Jackson CTCT Training Manager.
MICROSOFT WORD PRESENTATION. Word Processing  Software that is designed for the entry, editing, and printing of documents.  Windows Version = Microsoft.
PhotoShop Creative Suite 3 Chapter 1 The Work Area.
Here is a small example of the puzzle you will be completing today. You will start in the top left corner, and end at the bottom right using 3 different.
Dimitris Gkatzoflias EMISIA S.A. Thessaloniki Dimitris Gkatzoflias EMISIA S.A.
Perform a complete mail merge Lesson 14 By the end of this lesson you will be able to complete the following: Use the Mail Merge Wizard to perform a basic.
Version of the document: 1.01 Software Version CBox: v3.7.1 Hardware Version CBox: C5 Remote Access Configuration Client Language: English.
Version of document: 2.02 Software CBox: v3 User Manual Application Examples Language: English.
How To Add The uTorrent To The Kaspersky Firewall 2017.
How to work with the Laser Receiver
INTRO to PIXLR.com.
COPERT 4 – Quick Start Instructions
Computer Literacy BASICS
Setting Defaults in Microsoft Word for Accessibility
QUICK START GUIDE TO ONLINE TESTING
Setting up Categories, Grading Preferences and Entering Grades
LED Display Verification of Functionality
Going Green By Ima Librarian
How to insert a clipart into a doCument
Single Sample Registration
Radio Quality Indication
T_C_N_L_G_ E D I D I E O Y O H I E B J I R E A A W.
Saving, Modifying page, grammar & spell checking, and printing
Fusion 360 Concrete Tea light Holder Tutorial
Setup Guide - DeviceNet Communication AC1314 with RSNetworx
How to Fix Brother Printer Offline Status with Free Brother Printer Support? VISIT WEBSITE.
Mastering Autodesk Revit MEP 2016 CHAPTER 19: Creating Equipment
How to Submit Google Docs to the Homework Drop Box
HP ALM Test Lab Module To protect the confidential and proprietary information included in this material, it may not be disclosed or provided to any third.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
What’s New? What’s Changed?
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
EVENT TITLE Time, Date Location
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing arrow to the right on.
Click to edit title TO ADD NEW SLIDE LAYOUTS: Make sure you have the ‘Home’ tab selected at the top of the PowerPoint screen and click the down facing.
RapidFinder Analysis Software How-To Guide
Chapter 8 Using Document Collaboration and Integration Tools
Presentation transcript:

Version of document: 1.02 Software Version CBox: v3.8.0 or later Option Tilt Bucket Implementation Language: English

Goal of the document 1.Requirements 2.Setup of the sensors a)With the triangle mount b)Without the triangle mount (setup « free ») 3.Calibration at a new machine 4.Calibration at an existing machine 5.Machine Parameters

RequirementsRequirements Tilt Bucket Kit, that contains: Tilt Bucket Kit, that contains: – 2 mini-sensors – 2 support plates – 1 « triangle » mount – Glue pads and cleaning pads A tilt bucket on the machine; either a stand- alone or a tilt quickage, such as Engcon, Powertilt or equivalent A tilt bucket on the machine; either a stand- alone or a tilt quickage, such as Engcon, Powertilt or equivalent

Setup of the sensors Install the triangle holder on the lower part of the tilt axis as shown on these pictures: Install the triangle holder on the lower part of the tilt axis as shown on these pictures: On a tilt bucket On a compact quick link device  The triangle holder may be setup in ANY position and orientation! On a quick link tilt device

Setup of the sensors If there is no space available to setup the triangle holder, it is possible to install the 2 mini sensors without it, strongly following the following rules: If there is no space available to setup the triangle holder, it is possible to install the 2 mini sensors without it, strongly following the following rules: 1°) The planes of the two sensors must be perpendicular to each other 2°) The longer sides of the sensor’s base plates must remain collinear 3°) The “bumps” with the radio antennas underneath should be placed on the same side 4°) Tilt A should not be mixed-up with Tilt B

Setup of the sensors 1°) The planes of the two sensors must be perpendicular to each other:

Setup of the sensors 2°) The longer sides of the sensor’s base plates must remain collinear: Tilt A Tilt B

Setup of the sensors 3°) The “bumps” with the radio antennas underneath should be placed on the same side Tilt B Tilt A

Setup of the sensors 4°) Tilt A should not be mixed-up with Tilt B. The following rules shall be applied to install the sensors: a)Choose one of the two plates and imagine an arrow from the "ears" and going towards the blade spring. b)On the second plate, imagine an arrow from the back of the plate to the top of the plate.  The two arrows are in the same direction, then plat e a) is for the Tilt B.  If the two arrows are opposite, then plate a) is for the Tilt A. a) b)

Setup of the sensors Some examples of a free setup: Tilt B Tilt A Tilt B Tilt A Tilt B Tilt A

Calibration on a new machine Perform a complete machine calibration: Perform a complete machine calibration:

Calibration on a new machine Select the machine’s configuration: Select the machine’s configuration: - Tilt Bucket: - Quick Link Tilt:

Calibration on a new machine Continue by following the instructions on the screen: Continue by following the instructions on the screen: 1.Open/close the bucket to horizontally level the tilt axis. 2.THEN tilt the bucket left/right to horizontally level the bucket blade. 3.FINALLY click on « Next » 1.Slowly close the bucket appx ° 2.THEN again control & correct the bucket blade horizontal level. 3.FINALLY click on « Next » Continue with the rest of the procedure...

Calibration on a new machine To add more buckets after the first calibration: To add more buckets after the first calibration: – If only the bucket was tilting (NO quick link tilt), you will still have the choice between tilt bucket or “standard bucket”. – With a previous calibrated quick link tilt, all added buckets after will be tilt buckets. Note: Don't forget to measure & dial-in the width of each new bucket by going to the machine parameters.

Calibration at an existing machine To add support for tilt on an already calibrated machine, select an already calibrated bucket and go in “System Settings» To add support for tilt on an already calibrated machine, select an already calibrated bucket and go in “System Settings» -Select "Calibration Tilt bucket“, If the actually attached and selected bucket has his own tilt mechanism. When you will select this bucket, the tilt function will be available. -Choose "Calibration Quick Link Tilt" if it is an Engcon, Powertilt or equivalent system. All registered buckets will have the tilt function.

Machine Parameters -On the tab 'Buckets', the “Tilt" option is unchecked. -On the tab 'Options', the "Quick Link Tilt" option is unchecked. 1.No tilt available Note: The Tilt Calibration is not available in manual mode. See previous chapter to launch a calibration of the Tilt of a machine part.

Machine Parameters -On the tab 'Buckets', the “Tilt" option is checked. -On the tab 'Options', the "Quick Link Tilt" option is unchecked 2.Tilt on bucket(s) Note: To redo the tilt calibration of this bucket, remove the corresponding tilt Calibration by UN-checking the ‘Tilt Bucket' box, then rerun a tilt calibration.

Machine Parameters -On the tab 'Buckets', the “Tilt" option is checked. -On the tab 'Options', the "Quick Link Tilt" option is checked 2.Quick Link Tilt Note: Disabling the "Quick Link Tilt" option removes the tilt calibration for all buckets.