Successful Tendering ENGINUITY TUTORIAL Copyright Virtual Management Simulations.

Slides:



Advertisements
Similar presentations
Managing The GLOBAL Business ENGINUITY 2014 Copyright Virtual Management Simulations.
Advertisements

ENGINUITY 2014 Learning How To Play
ENGINUITY 2014 COMPETITION REVIEW
ENGINUITY 2013 The Global Business Management Competition
Using within Higher Education
Presented by: Kathryn Hodges, NH
AN INVESTIGATION INTO THE EFFECTIVENESS OF PARTNERING IN PROMOTING HEALTH AND SAFETY MANAGEMENT ON CONSTRUCTION SITES Brian C Heath BSc, MSc, MRICS Directorate.
The Global Business Management Competition for the Construction Industry for the Construction Industry ENGINUITY 2015 Copyright Virtual Management Simulations.
MOSCOW SCHOOL OF MANAGEMENT SKOLKOVO The Law Project Balance between the State and Business in state procurement.
FOUNDATION BUSINESS SIMULATION
Implications of a contractor Failure. Implications of Contract Failure Costs –Lost Revenue –Poor Service Delivery –Cost and effort of ongoing risk mitigation.
Building Industry Game B.I.G. - Building oror Building/Heavy Associated Schools.
STRATEGIC MANAGEMENT ACCOUNTING Product Profitability Product costing has been a mainstay of cost and management accounting for many years. Very sophisticated.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 5 Risk and Return.
Enginuity ©Virtual Management Simulations Using on Company Graduate/Management Development Programmes.
ENGINUITY ©Virtual Management Simulations Using within Higher Education.
Overview ENGINUITY Copyright Virtual Management Simulations.
Factors Affecting The Share Price ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
CSO Observer Member of the Evaluation Committee. Civil Society Organization May have representation in the Evaluation Committee As a member of the Evaluation.
Calculating Key Performance Indicators ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Choosing between using Own or Subcontract Labour ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Completing Jobs Early ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Why do we need more housing? The East Midlands Regional Plan is still in force, which requires 510 houses to be built per annum between 2006 and 2026 Although.
P4 Advanced Investment Appraisal. 2 Section D: Acquisitions and Mergers D1. Acquisitions and mergers versus other growth strategies D2. Valuation for.
COMPETITION REVIEW ENGINUITY 2015 Copyright Virtual Management Simulations.
Making Project Manager Decisions ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Bidding Strategies. Outline of Presentation Markup Expected Profit Cost of Construction Maximizing Expected Profit Case 1: Single Known Competitor Case.
Income recognition. Exchange/Non-Exchange Transactions Income received or due to the University will either be part of an Exchange Transaction or a Non-Exchange.
Setting Staffing Levels for the Head Office, QHSE and Measurement Departments ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
PROCUREMENT General Overview of Procurement Process on Dublin Waste to Energy Project.
Making Procurement Decisions ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Trialling Copyright Virtual Management Simulations ENGINUITY.
Forming A Business Strategy ENGINUITY TUTORIAL Copyright Virtual Management Simulations.
Construction Professionals
© 2014 Cengage Learning. All Rights Reserved.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
TOTAL QUALITY MANAGEMENT
Managing The GLOBAL Business
Construction Professionals
Cost-Volume-Profit Analysis
The Participants Module
Topic: pricing of a public issue
Performance Measurement in Decentralized Organizations
K Andy Pricing Case Pricing Case.
Making Marketing Decisions
Auctions and Competitive Bidding
ENGINUITY 2017 COMPETITION REVIEW
AS Business Studies: Finance
Managing the account and winning new business
Making Financial Decisions
Choosing A Consultant Designer
(Building Information Modelling
Forming Client Relationships
To be able to understand the importance of Planning and having business objectives Misconceptions – Business planning & Business objectives, What is the.
ENGINUITY TUTORIAL Job Profit Copyright Virtual Management Simulations.
ENGINUITY 2016 COMPETITION REVIEW
Prosper 2013 Introduction Copyright Virtual Management Simulations.
ENGINUITY TUTORIAL Overdraft Limit
ENGINUITY 2018 COMPETITION REVIEW
Norfolk Constructing Excellence Awards 2016
ENGINUITY TUTORIAL Job Risk Copyright Virtual Management Simulations.
Structure Account Analysis Own Position Business Development
Making Labour Decisions
ENGINUITY TUTORIAL The Job Cycle
Maryland Online IEP System Instructional Series – PD Activity #8
Construction Professionals
MAZARS’ CONSULTING PRACTICE Helping your Business Venture Further
TNT-Company 42A Owners of Company 43A
Qualification in Clinical Procurement
BUSINESS FINANCE FOR EVERYONE Manufacturing – Sales
Presentation transcript:

Successful Tendering ENGINUITY TUTORIAL Copyright Virtual Management Simulations

Successful Tendering Based upon the company’s strategy for growth, a number of bids may be submitted in a period. Each one is processed in strict job number order. Each bid is awarded through competitive tendering, and at the time a bid is submitted to the client success in being awarded the contract depends upon a number of factors. Procurement Restrictions Company based procurement restrictions include :-  Number of jobs in progress If the company has too many job commitments, clients will reject a company’s bid because they feel that the company will not be able to manage further contracts efficiently.  Workload limitations Clients will not accept a bid from the company if they feel that the company does not have the resources (capital base) to complete the job. Job specific restrictions include :-  Client relationship As time passes clients may look to preferred bidders, and if the client relationship is not strong enough the client may refuse to accept the bid.  BIM experience For Design & Build jobs if BIM (Building Information Modelling) is being used for the job, the client will insist that the consultant chosen to produce the design has some BIM experience. Price The company’s bid being able to compete on price against rival bidders. We will look at each factor in turn.

Successful Tendering Procurement Restrictions: Number of Jobs in Progress The client will also reject a bid if the company’s number of jobs in progress exceeds the limit defined in the Industry information, feeling that the company is spreading its resources too thinly, which will affect the quality of any work progressed. In this example the limit is 10 jobs in progress. With 4 jobs already in progress at the beginning of the period, shown on the Job Progression Screen, the company can only win up to 6 jobs before the number of jobs limit takes affect. Key Point(s) The limit does not take account of any jobs that are likely to complete in the current period. The ongoing jobs limit is shown in the Industry information.

Successful Tendering Procurement Restriction: Workload Limitations The company’s initial workload at the beginning of the period, based upon the value of work still to be completed from the jobs in progress on the Job Progression Screen, is 15.9m. The company has bid for 3 jobs, but will the capital base support winning the additional jobs, and adding to the existing workload ? The Workload limitations show that company’s capital base of 4.1m can support future workload of up to 41m without any problems. The ‘future workload’ is defined as the company’s initial forward workload (before any jobs are progressed in the period), plus the value any jobs won in the period. We will investigate further what would happen if we were to win the additional work.

Successful Tendering The initial forward workload is 15.9m, and if the 3 bids were to be won the affect would be :-  Job 80: 10.2m (cumulative workload 26.1m)  Job 82: 9.2m (cumulative workload 35.3m)  Job 86: 8.0m (cumulative workload 43.3m) However, the workload limitations will not enable all 3 jobs to be won, since the cumulative forward workload cannot exceed the upper threshold of 41m. The following successful bidding combinations are possible :-  Jobs 80 and 82 could be secured since the cumulative workload would not exceed 41m, but then not job 86  If job 80 was not secured, jobs 82 and 86 could be secured  If neither jobs 80 or 82 were secured, then job 86 could be secured Successful bidding of course, depends on other factors other than just workload limitations, which will be discussed shortly. Key Point(s) In the example the values have been rounded to 1 decimal place. During processing there is no rounding, and all calculations work to exact numbers.

Successful Tendering To improve the company’s chances of avoiding the capital base workload limitations, the threshold can be raised for the current period by using more of the company’s cash reserves to increase the capital base. This is a decision to be made on the Financial Decisions Screen. The Industry information indicates the workload that can be supported based upon the size of the company’s capital base. In the example the workload cannot exceed 10 times the capital base, so an additional 245,759 of capital base will support 2.5m of further workload, which would be enough to support all 3 of the jobs bid for.

Successful Tendering Procurement Restrictions: Client Relationship As time passes clients may look to preferred bidders, and if the client relationship is not strong enough the client may refuse to accept the bid. In the example shown from period 7 onwards the relationship with Breeze Energy will need to be at least ‘fairly good’ for the client to accept the bid.

Successful Tendering Procurement Restrictions: BIM Experience For design & build jobs, if BIM (Building Information Modelling) is being used for the job, the client will insist that a consultant designer is chosen with some BIM experience. In the example shown for job 80 Waverley Creative Designs have been chosen because of their suitability for the job, and because they have some BIM experience.

Successful Tendering Competing on Price If the client does not immediately reject the company’s bid because of the procurement restrictions, then the decision as to whether or not they are awarded the job comes down to competing on price against rival bidders :-  In the early years, the competition comes from fictional rival companies, Each one has their own unique profile and bidding history, and a careful assessment of them is required to determine the appropriate level of margin.  In the later Years the competition comes from the other ‘human’ teams in the later years, with less certainty about possible bidding strategies, and hence setting the markup becomes far harder.

Successful Tendering Rival Bid Consider the following example in the Early Years. The most competitive (lowest) rival bid is as shown

Successful Tendering Rival Bid Low Bidding Low bidding If the company’s bid is too far below the most competitive rival bid, the client will reject the company’s bid on the grounds of low bidding, believing that the quality of the work will be undermined because the company cannot possibly complete the project without cutting costs.

Successful Tendering Rival Bid Low Bidding High Bidding High bidding If the company’s bid is above the rival bid, the client will reject the company’s bid due to high bidding.

Successful Tendering Rival Bid Low Bidding High Bidding Job Secured ‘Safe’ area If the company’s bid falls below the rival bid, but above the low bidding threshold, then the job will definitely be won.

Successful Tendering Rival Bid Low Bidding High Bidding Job Secured Client Relationship Client Relationship In the Later Years, when the teams compete ‘Head to Head’ against each other, client relationship becomes a factor where bids are within a % of the most competitive bid. This % range depends upon the job size.