The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Crab Cavities in IR1 and IR5 Some considerations on tunnel integration What will be the situation in the tunnel after the LHC IR Phase-1 Upgrade. What.
SAFETY FOLLOW-UP HL-LHC PROJECT WP17 – Infrastructures meeting S. La Mendola, Jose Gascon DGS/SEE 09 July 2015.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
PSB Main Power Supply Serge Pittet Jean-Paul Burnet, Karsten Kahle, Fulvio Boattini, Max Chamiot-Clerc TE-EPC Serge PITTET LIU-2011 Event, 25/11/2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Power converters implications for Booster Energy Upgrade Jean-Paul Burnet, Serge Pittet LIU day, TEEPC.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
1 Low-energy RHIC electron Cooler (LEReC) cost estimate December 2, 2014.
17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini & Michel Obrecht TE-EPC / EN-CV TEEPC.
Progress with POPS Jean-Paul Burnet TE/EPC IEFC workshop, Feb 2010.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Electrical Discharge Circuit for CNGS Horn & Reflector PH/DT1 Group Meeting, 23 October 2007 Gilles MAIRE PH/DT1-IC Section Leader.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
High Luminosity LHC (HL-LHC) and Crab Cavities Lucio Rossi CERN LHC Crab Cavity Worshop 15 Dec 2010.
Internal review of superconductor and magnet laboratories1 Status of LHC-TB Power Converters Hugues Thiesen TE-EPC.
TE-EPC Activities during LS2 V. Montabonnet on behalf of TE-EPC group.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Integration studies – Part 1 Inner triplet Y. Muttoni TS-ICC-LI 31 July 2008.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 Cold Powering New Baseline A.Ballarino 27/10/2015.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
1 S-FRS Magnet Test Bench SuperFRS Magnet Test Bench Power Converter Status H. Thiesen 13 May 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Design considerations for the FCC electrical network architecture FCC week 2016, Rome, April 2016 Davide Bozzini - CERN/EN/EL With the contribution.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
Warm cabling, cooling and ventilation L. Tavian, ATS-DO On behalf and under the controls of SWP17.2 and SWP17.3 Conceptual Design Review of the Magnet.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
POPS: Power for PS A novel 60 MW Pulsed Power System based on Capacitive Energy Storage Jean-Paul Burnet June 2010.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
TC CO July HCC report HCC report Summary of the tests of the LSS8L power converters in short-circuit F. Rodríguez-Mateos on behalf of R.Ballet-Thouble,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Report Technical Director Storage-Ring-Installation Completed
Update on the PSB Cooling and Ventilation Systems
Cryogenics storage and distribution
HL-LHC IT STRING and Series test of SC link
CLIC Civil Engineering & Infrastructure Working Group Meeting
Powering LHC magnets version 30/3/2007.
The HL-LHC Circuits: Global View and Open Questions
Power converters and circuits
Construction and Commissioning of Electronic Test Benches
Construction and Commissioning of Electronic Test Benches
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
WP4 RF equipment volume needs
Electrical and electronic systems projects
Cooling systems for HL-LHC (WP17.3)
The overall integration. Frozen situation 18/09/2015
WP3 Meeting – December the 10th 2015 H. Prin
Maintenance at ALBA facility: Strategy for the conventional services
Hardware Commissioning
ILO Industrial Opportunities Days, 6-7 June 2019
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement Power converter integration Power converters for HL-LHC WP 6b : Warm powering Jean-Paul Burnet, CERN TE-EPC

2 Content Introduction List of circuits Power converter types Power converter integration Infrastructure needed HL-LHC Technical infrastructure – 24 September 2015

3 Infrastructure for Power Converters All new power converters for HL-LHC (inner triplet and matching section) will be installed in new UR gallery. Power converters transform electricity from AC to DC to power magnets. Power converters are placed between the mains and the DFHM. Power converters needs: -Electricity -Cooling-water - control -Air conditioning Power converters shall be close to electrical switchboard and DHFM to minimized the cabling and limit the losses. HL-LHC Technical infrastructure – 24 September 2015

4 List of circuits for HL-LHC List of circuits for one IP side for inner triplet and matching section magnets. All IP side are identical. HL-LHC Technical infrastructure – 24 September 2015

5 List of power converters for HL-LHC List of power converters needed for the inner triplet and matching section magnets: HL-LHC Technical infrastructure – 24 September 2015

6 Power converter types The power converters will be of the same type as the present one. 2 new types will be developed but based on the same technology. Main Quadrupoles: 13kA/18VAtlas Toroid: 20.5kA/18VIndividual Quadrupoles: 6kA/8V 4-quadrant for correctors : ±600A/±10V4-quadrant for correctors : ±120A/±10V Same family 4-quadrant for correctors : ±200A/±10V ±2kA/±10V HL-LHC Technical infrastructure – 24 September 2015

7 Power converter underground integration The installation should be similar to a present UA. No mezzanine. Space for transport and installation. No rear access to racks. HL-LHC Technical infrastructure – 24 September 2015

8 Power converter size HL-LHC Technical infrastructure – 24 September 2015

9 Power converter integration All power converters will be installed in underground galleries, UR. The UR contains the power converters for both IP side. In total 86 power converters will be installed in this gallery. HL-LHC Technical infrastructure – 24 September 2015

10 Power converter underground integration Layout of the UR15, arrangement around the DFHM HL-LHC Technical infrastructure – 24 September 2015

11 Power converter underground integration Layout of the UR gallery. HL-LHC Technical infrastructure – 24 September 2015

12 Infrastructure needed -Electricity (400V) -UPS (400V) for control electronics -Classical DC cables (<1kA) -Water cooled cables (>1kA) -Water cooling for power converters and DC cables -Air conditioning -Ethernet (technical network) -Gateway for control FGC2 or FGC3 (worldfip or Ethernet) -PIC -BIC -WIFI HL-LHC Technical infrastructure – 24 September 2015

13 Power converter size The size of the power converter is based on the present one. Corresponding to 215 equivalent rack 19’’ inside the UR. HL-LHC Technical infrastructure – 24 September 2015

14 Electricity The list of AC sockets is presented below for one UR. HL-LHC Technical infrastructure – 24 September 2015

15 Water cooling for power converters The water flow needed for the power converter for one UR. without the water-cooled cables. HL-LHC Technical infrastructure – 24 September 2015

16 Losses in Air for power converters The air losses are presented below for one IP side. HL-LHC Technical infrastructure – 24 September 2015

17 Control infrastructure Additional racks are needed for the control infrastructure. -Gateway racks, 2 racks 19’’ -Calibration rack for high-precision measurement, 4 racks 19’’ HL-LHC Technical infrastructure – 24 September 2015

18 High voltage power supplies for crab cavities To power the crab-cavities, two options are possible depending of the power needed. Option 1: tetrode Option 2: IOT HL-LHC Technical infrastructure – 24 September 2015

19 High voltage power supplies for crab cavities Option tetrode: Each tetrode needs an HVPS. 8 tetrodes are placed in UA with its associated HVPS. HVPS rating: 200kVA, 10kV DC 4 racks 19’’ Water cooled Total power is 3.2 MW per IP. HL-LHC Technical infrastructure – 24 September 2015

20 High voltage power supplies for crab cavities Option tetrode: SR17 18 HVPS placed in SR spare converters. 4 racks 19’’ / HVPS Water cooled AC socket : 400A * 18 DC cable: 10kV / 10A * 18 UPS: 1kVA * 18 Air losses : 16 * 20kW + 40kW for test Water losses: 16 * 10kW + 40kW for test HL-LHC Technical infrastructure – 24 September 2015

21 High voltage power supplies for crab cavities Option IOT: IOT need 50kV DC power. The power converter technology is completely different and oil is need for insulation. In this case, the solution is to place the HVPS in surface. One HVPS for one IP side. HVPS rating: 2MVW, 50kV DC Total power is 4 MW per IP. Need surface building for racks and outdoor platform for oil transformers. HL-LHC Technical infrastructure – 24 September 2015

22 Summary All needs were communicated for the integration works and service groups. All is inside the model. HL-LHC Technical infrastructure – 24 September 2015