Presentation is loading. Please wait.

Presentation is loading. Please wait.

Construction and Commissioning of Electronic Test Benches

Similar presentations


Presentation on theme: "Construction and Commissioning of Electronic Test Benches"— Presentation transcript:

1 Construction and Commissioning of Electronic Test Benches
Medical RFQ 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

2 Index Overview My work Status Future 28th November 2016,
3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

3 Overview Constructing a compact 750 MHz Radio Frequency Quadrupole
It can accelerate a proton beam to 5 MeV in a lenght of 2 meters It is divided into 4 standardized modules of 500 mm RF power sources: 4 IOT (Inductive Output Tubes) HV-DC POWER SUPPLY CAPACITOR RF ON/OFF Drivers IOT HV Capacitor Charger Capacitor Bank Water Air 16A 200Hz 20µs Filament Focus Grid Ion Pump LVPS Control PLCs 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

4 Overview ) Anode: Close to GND Focus PS Capacitor Charger / HVPS
IOT: Inductive Output Tube Anode: Close to GND Focus PS INPUT RF e- OUTPUT RF Capacitor Charger / HVPS Capacitor e- e- e- Grid PS ) Cathode: -40 kV DC Ion Pump PS Filament PS 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

5 My work R + // C Low-Pass Filter
Desing and Simulation R + // C Low-Pass Filter Modify Resistance and Capacitor values Control Cards Body Current Card RFQ Medical 200 Hz – 20 µs Electrosys System 43 kHz et 127 kHz MATLAB 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

6 My work Assembly and Connection IOT Tube Flow Meters, Sensors…
Key Lock & Ground Swith Systems New Ion Pump Power Supplies 4 kV DC Full Wave Rectifier 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

7 My work Test HV Test: Isolation Level, HV Measurements…
28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

8 My work RFQ Drivers 28th November 2016,
3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

9 My work 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

10 My work Test Isolation Problem HV & Other Tests 28th November 2016,
3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

11 My work LVPS Problem Isolation Control Parts Everything -40 kV DC
ISOLATION TRANSFORMER 230/230 V, 15 kVA, 60 kV DC LVPS Problem Isolation Control Parts Everything -40 kV DC Reference Output Protection Cards 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

12 My work LVPS Only Output Floating System -40 kV DC Reference TVS
ISOLATION TRANSFORMER 230/230 V, 15 kVA, 60 kV DC LVPS Floating System Only Output -40 kV DC Reference TVS Improve Protection Cards 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

13 Status Now 14.11 21.11 28.11 05.12 12.12 19.12 RF Conditioning
Nominal Power: 400 kW 210 kW > 50 % Nominal Power Improving Test Bench Now Improvements: HV Plastic Rack, New Power Supplies, PLC Control, Cables, Connections… 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

14 Future Improving and Commissioning of Medical RFQ Test Bench Documentation of Medical RFQ Test Bench Optional Tasks Electrosys MHz, Philips & MHz Crab Cavity and MB-IOT Test Bench 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM

15 Construction and Commissioning of Electronic Test Benches
Medical RFQ 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ , CERN-BE-RF-PM CERN-BE-RF-PM CERN-BE-RF-PM


Download ppt "Construction and Commissioning of Electronic Test Benches"

Similar presentations


Ads by Google