Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October 2015 8/9 October 2015TSS: TPC Assembly1.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Click on this image to open the full PDF document.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
19.Dez Volker Prahl Space frame endplate. 1 1 WPM 186, Volker Prahl Guide ring necessary HV-Connector.
Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
October 22, 2003H.J. Krebs1 LST Mechanical Design Review Mechanical Installation Preparation H. James Krebs October 21, 2003.
General idea of a couple of check rod system and adjustments
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
The STAR HFT PXL system is designed to be inserted in situ. Is housed in 2 large frame aligned with rails inside Inner Detector Support. Inserted from.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
1 GLD Surface Assembly Y. Sugimoto KEK
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
M. Gilchriese Sectors, Rings, Frame Assembly and Installation July 18.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
ILD requirement for assembly space and time 2015/11/3 Yasuhiro 1.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
ICARUS Collaboration Meeting Dec A. Scaramelli.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Mu2e Mu2e Remote Handling Review Comparisons: Costs, Risks & Maintainability Ryan Schultz Deputy L3 Manager Target Station 3/3/2015.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
An idea of ILD general assembly plan 2015/10/8 Yasuhiro Integration Meeting 1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Development of a low material endplate for LP1 and ILD Dan Peterson, Cornell At previous meetings, , showed the carbon fiber molded.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
EUDET HCAL prototype; mechanics Felix Sefkow Work by K.Gadow, K.Kschioneck CALIC collaboration meeting Daegu, Korea, February 20, 2009.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Discussion for the LP endplate
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
2016/9/30 Yasuhiro Infra/CFS mini-ws
STRAW TRACKER SYSTEM CAD STATUS :
Update on Pavia MM mechanical prototype
Solenoid Yoke Door-Barrel Connection
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Development of a low material endplate for LP1 and ILD
INSTALLATION SEQUENCE
Current Site Status at IP Preliminary survey of campus
Update of experimental hall in Japanese mountain site
Requirements of the support mechanics
Far Detector Activities Late 2017 – Early 2018
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Toward the final design of a TPC for the ILD detector
Dan Peterson: News on Advanced Endplate Mechanics
TPC Development at Cornell
Detector hall in mountain regions
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
TEC assembly and commissioning at Lyon
DS20k Integration Workshop
Presentation transcript:

Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1

Outline Some basic considerations Horizontal / vertical TPC assembly (in the AH?) A first shot at the various possible TPC project plans TPC insertion in the DH 8/9 October 2015TSS: TPC Assembly2

Some basic assumptions – all to be argued No (long) transport of full TPC, field cage or fully equipped end- plates  need to assemble TPC at IP campus  Our assumption here: TPC assembly in the AH. Compatible with Yasuhiro’s overall plan assuming realistic TPC time scales?  Then space in AH necessary  Do it in research office building? But then where full TPC system test (gas!)?  No TPC assembly in DH. No TPC assembly in DH – sufficient space and possibility to work in parallel with yoke construction, but probably bad timeslot? Current scenario therefore:  Horizontal or vertical assembly in AH hall (exact position tbd)  Space requirement: 100 m 2 (probably 60 m 2 enough, but some contingency), plus storage space (for modules) and test area for modules  Field cage delivered in one or two big pieces and assembled in AH  Necessity to create grey-room / ISO7 characteristics around TPC assembly place 8/9 October 2015TSS: TPC Assembly3

Location in AH (from Yasuhiro’s yoke assembly plan) Questions:  Grey-room quality after delivery of field cage and mounted end-plates?  Position of large door? TPC Assembly horizontal - long Door position? 8/9 October 2015TSS: TPC Assembly4 Obsolete after yesterday’s discussion?

Location in AH (from Yasuhiro’s yoke assembly plan) TPC Assembly horizontal - long Possible TPC assembly area approx. 25×8 m 2 (half the length also ok, greyroom / ISO7 needed) 8/9 October 2015TSS: TPC Assembly5 Obsolete after yesterday’s discussion?

8/9 October 2015TSS: TPC Assembly6 Endplate frame Field-cage in cradle Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly7 Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly8 Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly9 Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly10 Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly11 Vertical procedure in a few steps

8/9 October 2015TSS: TPC Assembly12 Then  Cleaning of field cage  Construction of grey/clean room around TPC field cage (ISO 7)  Equipping of end-plates with tested modules using robot (petal-like structures in EP quadrant holes).  System test (in AH) Vertical procedure in a few steps

Horizontal procedure in a few steps Note: – Greyroom / ISO7 with stable T and FFUs needed from start. – Access to greyroom through sliding gate with air lock – Assumption that field cage self-supporting and first EP equipment Length min. 12 m Width min. 6 m 8/9 October 2015TSS: TPC Assembly13 Trolley with self-supporting thorn (load 100 kg, sideview) Platforms for inner vessel and field cage: (re)movable

Horizontal procedure in a few steps End-plate structures on trolleys and beginning of end-plate equipping (R); supporting star on inner-vessel platform 8/9 October 2015TSS: TPC Assembly14

Horizontal procedure in a few steps Field-cage assembly 8/9 October 2015TSS: TPC Assembly15

Horizontal procedure in a few steps Marriage of field-cage and end-plate R 8/9 October 2015TSS: TPC Assembly16

Horizontal procedure in a few steps Set-up of inner vessel with cathode (“sail”) 8/9 October 2015TSS: TPC Assembly17

Horizontal procedure in a few steps Marriage of inner vessel with cathode and field cage 8/9 October 2015TSS: TPC Assembly18

Horizontal procedure in a few steps Marriage of inner vessel with cathode and field cage 8/9 October 2015TSS: TPC Assembly19 Alternative: First fixing of inner vessel in field cage, then installation / spanning of cathode.

Horizontal procedure in a few steps Marriage of inner vessel with cathode and field cage. Fixing the supporting “star” supporting the inner vessel and the sail 8/9 October 2015TSS: TPC Assembly20

Horizontal procedure in a few steps Removing inner-vessel platform and finalisation of end-plate L 8/9 October 2015TSS: TPC Assembly21

Horizontal procedure in a few steps Inserting end-plate L: approaching the field cage … 8/9 October 2015TSS: TPC Assembly22

Horizontal procedure in a few steps Inserting end-plate L: approaching the field cage, supporting the inner vessel and removing the supporting star, … 8/9 October 2015TSS: TPC Assembly23

Horizontal procedure in a few steps Inserting end-plate L: approaching the field cage, supporting the inner vessel + removing the supporting star, pushing in end-plate L 8/9 October 2015TSS: TPC Assembly24

Horizontal procedure in a few steps 8/9 October 2015TSS: TPC Assembly25 Ready

Alternative horizontal procedure Assumptions: Similar as before, but …  EP equipment at the end with robot  Question of overall time planning (end-plate equipment the most time- consuming item 8/9 October 2015TSS: TPC Assembly26

Vertical procedure – time estimate 8/9 October 2015TSS: TPC Assembly27

Horizontal procedure – time estimate 8/9 October 2015TSS: TPC Assembly28

TPC insertion – mechanism? Rails Space? 8/9 October 2015TSS: TPC Assembly29

8/9 October 2015TSS: TPC Assembly30

Rail 8/9 October 2015TSS: TPC Assembly31

8/9 October 2015TSS: TPC Assembly32

8/9 October 2015TSS: TPC Assembly33

8/9 October 2015TSS: TPC Assembly34

8/9 October 2015TSS: TPC Assembly35

Carbon bands 8/9 October 2015TSS: TPC Assembly36

Carbon bands  How many?  Size?  How about longitudinal strain? 8/9 October 2015TSS: TPC Assembly37

8/9 October 2015TSS: TPC Assembly38

Veeeeery preliminary conclusions 8/9 October 2015TSS: TPC Assembly39 Currently, more in favour of vertical assembly:  Space requirements  Time requirements  Ease of access / logistics  … But many steps need thorough planning, and many engineering solutions are still missing.  Also for insertion of TPC into ILD, and for mounting and suspension Nevertheless – best current guess:  Assembly requires one year after delivery of field cage  Space requirements: 100 m 2 (ISO 7 / greyroom quality)  Plus space for module storage and testing, plus services

Some near-future steps 8/9 October 2015TSS: TPC Assembly40 Continue to work on the models, assumptions and their consequences  Principal procedures, needs and requirements  Some important topics:  Support of TPC in ILC?  Prevention of longitudinal movement?  Cathode design?  End-plate design?  Space and infrastructure in DH (gas, power, electronic hut etc.) To be decided soon: Where to assemble TPC?  AH or research office building?  If research office building, then still full TPC system test before lowering in AH? Draw on previous experience  Specifically ALICE  meeting in November at CERN Get in touch with global integration efforts  Hope to intensify contact to Yasuhiro