INCOSE MBSE Biomedical Working Group/Drug Delivery Model Project Overview: – Involve BWG members in the use of MBSE and expand the application beyond defense.

Slides:



Advertisements
Similar presentations
Project Quality Plans Gillian Sandilands Director of Quality
Advertisements

Demystifying Construction Lecture 10 : Course Recap & Assessment Exercise Created by Antony Wood, School of the Built Environment, University of Nottingham.
Steven Corns Ajay Thukral Jack Stein
(Insert Title of Project Here) Kickoff Meeting (Month Date, Year)
UNCLASSIFIED 1 Enterprise Architecture Career Path Working Group Walt Okon Senior Architect Engineer Architecture & Infrastructure Directorate Office of.
Sixth Annual Meeting March 12, :00am to 4:00pm Crowne Plaza National Airport Arlington, VA INTERMACS Annual Meeting March 2012.
Software life cycle processes Purpose n A new international standard (ISO/IEC 12207:1995(E) that –establishes a common framework for software life cycle.
The Computer Science Course at Omar Al-Mukhtar University, Libya The Computer Science Course at Omar Al-Mukhtar University, Libya User-Centered Design.
NASA Software Productivity Consortium NASA Office of Safety and Mission Assurance Software Assurance Symposium September 5, 2002 Robert Ling Johnson Space.
EVOLUTION OF AIR FORCE ENVIRONMENTAL PROTECTION Thomas Russell, P.E. U.S. Air Force Center for Environmental Excellence Partnership for Peace Conference,
ASQ’s Quality Body of Knowledge (QBOK ® ) An Overview Presented by Christine Robinson at the ASQ Illiana Section Conference on January 21, 2011.
Lean and (Prepared for) Mean: Application Security Program Essentials Philip J. Beyer - Texas Education Agency John B. Dickson.
Roles and Responsibilities
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
4.2 Develop Project Management Plan
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Regulatory Affairs Personnel Training and Qualification (RA T&Q) Overview.
Safety concept and scope for WP Controls Fabian Moser February 5, 2010.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Developing responsible and ethical laboratory animal care and use programs which benefit the well being of animals while mutually working together with.
Second Annual Japan CDISC Group (JCG) Meeting 28 January 2004 Julie Evans Director, Technical Services.
Introduction to PSMO Process Safety Management for Operations.
NASA Software Productivity Consortium Affiliation NASA Office of Safety and Mission Assurance Software Assurance Symposium September 5, 2001 Cynthia Calhoun.
Standards Certification Education & Training Publishing Conferences & Exhibits 1Copyright © 2006 ISA ISA-SP99: Security for Industrial Automation and Control.
Governor’s Grant Conference Grant Writing Basics.
Guidelines: Prepare at most 20 slides Headwords, no sentences A title for every slide Contents Title Overview Background Approach Summary.
Health and Safety Executive ONR Regulatory Core Training and Competence Competence of Human Resources for Regulatory Bodies Presentation to IAEA Steering.
ISA99 - Industrial Automation and Controls Systems Security
Chairs/co-chairs: David Kaslow / Graham Edwards INCOSE Web page: Number of Members: Approx 160 Number.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
Federal Enterprise Architecture (FEA) Architecture Plus Meeting December 4, 2007 Kshemendra Paul (Acting) Chief Architect.
Strategic Objective 4 To promote the exchange of experiences and regulatory knowledge between NRAs inside and outside PANDRH“ Lessons learned from international.
Rural & Regional Water Business Expenditure Review Briefing for Businesses 4 October 2005.
1 Copyright © 2014 by Lockheed Martin Corporation SE Use Cases SysML Roadmap Activity John Watson Lockheed Martin 6/17/2014.
1 Integration of Process Initiatives And Assessments Common Process Framework Integration of Management System Standards and Initiatives (QMS/CMMI/Lean/PMBP)
© 2015 IHS. ALL RIGHTS RESERVED. Genstar Capital Acquires IHS Operational Excellence & Risk Management Business Ensuring the Success of Global EMIS Projects.
Standards Certification Education & Training Publishing Conferences & Exhibits 1 Copyright © ISA, All Rights reserved ISA99 - Industrial Automation and.
Task 9:Fusion Power Plant Studies Status & Planned Activities
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Workshop INCOSE MBSE Initiative Methods and Metrics Activity John C. Watson.
Roles and Responsibilities
Supporting quality devices
INCOSE Usability Working Group
Preventing Medical Device Recalls
INCOSE IW 2014 MBSE Workshop January 25-26, 2014
INCOSE MBSE Model Management Working Group
Systems Engineering Workflow Use Cases Activity SysML Roadmap Activity
Dumps Questions
CMGT 445 MASTER Perfect Education/ cmgt445master.com.
Raytheon Parts Management
HSE Case: Risk Based Approach.
Project Integration Project integration management processes :
MOSH Leading Practices Adoption System
A Collaboration of: Objectives:
The Strategic Information Technology Formulation
VDM++ Tutorial Architecture.
MHSC RESEARCH PROJECTS UPDATE
MHSC RESEARCH PROJECTS UPDATE
BioMedBridges – Work Packages 2 & 12
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Delivery of Solutions Information Management
Summary & Objectives Format
INCOSE IW 2014 Town Hall January 27, 2014
Part B of CMF: Metadata, Standards Concepts and Models Jana Meliskova
INCOSE Digital Artifacts Challenge Team
Atefeh Sadeghzadeh Control engineer – Target safety and control
The Road to Improved Quality Management
Systems Engineering Workflow Use Cases Activity SysML Roadmap Activity
(Insert Title of Project Here) Kickoff Meeting
ISACA IN 2019 Robin Lyons WHAT’S NEXT, NOW Technical Research Manager
Presentation transcript:

INCOSE MBSE Biomedical Working Group/Drug Delivery Model Project Overview: – Involve BWG members in the use of MBSE and expand the application beyond defense and aerospace industry related projects. – To develop a framework or template that can be used to accelerate the development and approval of biomedical devices. – Investigate the integration of risk and issues with regulatory environment. Milestones for the year: – Elaborate on the model to provide a method to start a more specific project that could be applied to a detailed analysis for a specific device. – Incorporate Risk and Regulatory environment into framework Include engineering technical risks and business risks Expand model to include enterprise level views – Establish methods for introducing safety assurance within the established architecture. Focus on patient impact from failures – Prepare a conference paper describing the process for submission to the INCOSE annual conference in – Prepare a briefing to be presented at the 2014 IW.

INCOSE MBSE Biomedical Working Group/Drug Delivery Model Recent Accomplishments: – MBSE short course for working group members. – Preliminary framework created. – Wiki site updated to share information on progress How do members get involved: – Subject Matter Experts in device development are required to review the model (anyone with Pharma experience would also be greatly appreciated!) – Review the MBSE initiative and target goals of MBSE approaches: Integration of models and data Executable architectures Trade studies associated with software and hardware specific models – Willingness to meet with group bi-weekly to review model (online and offline) will help! – Contact a MBSE initiative member in the BWG Steven Corns Sandy Friedenthal Jack Stein Ajay Thukral

Objectives – 2013 Reference Model Library : Standards & Guidelines Risk Assessment Case Study: Generic Pump Publications