The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003.

Slides:



Advertisements
Similar presentations
André Augustinus 15 March 2003 DCS Workshop Safety Interlocks.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
André Augustinus 16 June 2003 DCS Workshop Safety.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
UNICOS-like system for interlocks II Workshop on PLC-based interlocks systems ITER, Dec 2014 Jeronimo ORTOLA VIDAL CERN Engineering Department, Industrial.
PM-RS / March Industrial CMC. PM-RS / March Industrial CMC III Where did it start? Where is it headed? Rittal supplies infrastructure for.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
DSS Advisory Board Christoph Schäfer Rack Safety System.
Robert Gomez-Reino on behalf of PH-CMD CERN group.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
High Sensitivity Smoke Detection
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
CERN Safety Alarm Monitoring Presented by Luigi Scibile ST division / MO group.
André Augustinus 16 September 2002 Safety issues.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
Controls-related R&D options Etienne CARLIER 18 th ABTEF meeting
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
JCOP Review, March 2003 D.R.Myers, IT-CO1 JCOP Review 2003 Architecture.
Chiller control system Lukasz Zwalinski – PH/DT.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
May 14, 2003The Detector Safety System for LHC Experiments1 Agenda 1) Minutes of last meeting 2) DSS Back End software progress by Giulio Morpurgo 3) DSS.
Configuration database status report Eric van Herwijnen September 29 th 2004 work done by: Lana Abadie Felix Schmidt-Eisenlohr.
The Software for the CERN Detector Safety System G. Morpurgo, R. B. Flockhart and S. Lüders, CERN IT/CO.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
60kW Thermosiphon control system
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
E.Sbrissa EP/TA3 - IC ATLAS EDR_MAG Magnet Project Fault analysis, QA & Failure rate.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Database Issues Peter Chochula 7 th DCS Workshop, June 16, 2003.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Programmable Logic Controller & Distributed Control System Yoon-Je Choi 17 th June 2006.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
PVSS an industrial tool for slow control
FPix DCS Subgroup Report
Maintain, Manage And Monitor Outdoor Systems Remotely
LBDS TSU & AS-I failure report (Sept. 2016)
NWU IT-ES/NWU IT-ELD Monitoring systems
Safety Systems for ALICE
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
Programmable Logic Controllers: I/O
DSS Front End Software Review
ATLAS MDT HV – LV Detector Control System (DCS)
CMS – The Detector Control System
How SCADA Systems Work?.
Magnet Safety System for NA61/Shine
Robert Gomez-Reino Garrido
Radiation- and Magnet field- Tolerant Power Supply System
The LHCb Run Control System
PLC / SCADA / HMI Controllers: Name : Muhammad Zunair Comsats University Date: 28-October-2018.
RF Local Protection System
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO RCS Review Meeting ― September 2 nd, 2003

September 2 nd, 2003“The Detector Safety System for LHC RCS Review2/15 Outline Experimental Safety The DSS Scope and Goal Functional Requirements & Experiments’ Needs Design and Architecture Status and Conclusions

September 2 nd, 2003“The Detector Safety System for LHC RCS Review3/15 The LHC experiments and their sites, e.g. (sub-)detectors, gas systems, magnets, power distribution, racks and crates will be the equipment to be acted upon directly by the control and safety systems. Technical Services provide power, water, gas (general services) and distribute them to the different locations (experiment services). In 2001, the experiments have realized, that some safety aspects are not covered by the CSS and DCS. The availability and reliability of a PC-based control system (DCS) does not seem to be sufficient to ensure proper equipment protection. The DSS was born. Sensors monitor the state of the equipment: temperature (equipment, ambient air, water), humidity, water-flow, gas / oxygen (sniffer sensors), status signals of the sub-detectors There are dedicated sensors for the different safety and control systems, but they are not duplicated. The safety for personnel is ensured by the CERN Safety System (CSS). It is required by law and conforms to relevant International, European, and National standards. It has its own sensors and reacts globally, i.e. on whole buildings or caverns. The DSS complements (but should not duplicate) CSS and DCS: “The DSS is a system to safeguard the experiment. As such, it acts to prevent damage to the experimental equipment when a serious fault situation is detected (e.g. temperature too high, water leak, bad sub-detector status…), inside or outside of the detector…” Experiment DCS General services: power, water Experiment services: power, water, gas Experiment: sub-detectors, racks, crates Sensors 3 Levels of Experiment Safety DCS sub-system C DCS sub-system B DCS sub-system A CSSDSS Water Leak Front-End / Hardware Layer Back-End / Supervisory Layer Trip Smoke, Gas Leak monitor control Level 3 (fatal) Level 2 (error) Level 1 (normal) The Detector Control System (DCS) is responsible for the overall monitoring and control of the detector. It might take corrective action to maintain normal operation. All DCS sub-systems are interconnected. The DSS is embedded in an Experiment’s DCS. Alarm conditions are exchanged with the CSS (hardwired). The DSS should improve the experiment’s efficiency by preventing situations leading to level-3-alarms (plus possibly to 2-3 weeks downtime) decreasing downtime due to failures …and should not costs too much ;-). The DSS can be considered as an “insurance policy”.

September 2 nd, 2003“The Detector Safety System for LHC RCS Review4/15 The DSS must be a standalone system, and be… highly reliable highly available as simple and robust as possible re-configurable by the GLIMOS and experiments’ safety experts self-checking for consistency The DSS Functional Requirements It must operate permanently and independently of the state of DCS and CSS. It must be able to take immediate actions to protect the equipment. The DSS functional requirements have been evaluated by the four LHC experiments in a joint working group.

September 2 nd, 2003“The Detector Safety System for LHC RCS Review5/15 Constraints for the DSS Easy integration… into the control system of the experiment of sub-detector safety systems of external information (from the LHC machine, gas systems, CSS, …) Adaptability… to the different needs of four experiments to the evolving experiment environments e.g. during their assembly, commissioning, operation and dismantling (a time-span of approx. 20 years) Maintainability… over the lifetime of the experiments The DSS is a common solution proposed for all four LHC experiments

September 2 nd, 2003“The Detector Safety System for LHC RCS Review6/15 Surface buildings Counting rooms Detector LHC Experiments’ Needs 200 to 800 analog and digital values to be monitored Several hundred digital actuators Geographically highly distributed system Sensors and actuators are located in the caverns as well as in several surface buildings

September 2 nd, 2003“The Detector Safety System for LHC RCS Review7/15 The Front-End will… be based strictly on industrial solutions, e.g. PLC technology for safety applications standard communication protocols (PROFIbus, Ethernet, OPC) material from the CERN store DSS Front-End Solution have its own sensors and actuators check and filter the sensors will always react immediately and automatically on fault conditions indicated by the sensors be on safe power (CERN safe power plus own UPS) After detailed discussons in the DSS Advisory Board,

September 2 nd, 2003“The Detector Safety System for LHC RCS Review8/15 Input: Sensors DSS cycle The DSS Cycle DSS Cycle (“OB1”): The DSS continuously monitors e.g. temperatures sensors, water flow, sub-detector status Output: Action (e.g. cutting off power ) T>T thres Input values are checked and compared to defined thresholds. Several conditions can be logically combined. Their fulfillment will produce an alarm. Actions are taken on a coarse level (e.g. cutting power to a rack row). AND Alarm End-of-Cycle Alarms will trigger defined actions. The relation between sensors, alarms and action is called the “Alarm/Action Matrix”.

September 2 nd, 2003“The Detector Safety System for LHC RCS Review9/15 After detailed discussons in the DSS Advisory Board, DSS Back-End Solution The DSS User Interface (Back-End) will… be based on the SCADA system “PVSS” and CERN’s JCOP Framework monitor and configure the Front-End allow a configuration of the relations between sensor values, alarms, and the actions performed in these cases (the “Alarm/Action Matrix”) define user access levels provide the user with comprehensible displays log alarm states, warnings, and related information in an Oracle database

September 2 nd, 2003“The Detector Safety System for LHC RCS Review10/15 Redundancy (optional, but required for the DSS): up to the level of I/O interfaces backup in case a power supply, CPU, Profibus failure modules have high MTBF (low failure rates). optical link between CPU modules step-by-step comparison inside the processing of the PLC cycle Back End: PVSS user interface for display logging modification of the Alarm/Action-Matrix Front-End (continued): max. 32 external crates based on S7-300 modules (limited due to redundancy) capable of handling the number of channels (inputs and outputs) as required located close to the sensors (<200m) I/O interfaces hot-swappable inputs and outputs use “positive safety” External crate: ET 200M Profibus adapter I/O interfaces redundant PS (extern) Front-End: uses a Siemens S7-400 station certified for Safety Integrity Level (SIL) 2 applications programmed through the Siemens STEP7 development environment implementation and processing of the DSS Front-End Software monitors itself CPU crate: redundant PS CPU 414-4H Ethernet adapter (CP 443-1) DSS Core Architecture Profibus DSS COM OPC Server PVSS CERN LAN OPC server: gateway to the Back-End (Windows XP) data distribution via Siemens OPC software redundant in the Front-End communication using the ISO protocol

September 2 nd, 2003“The Detector Safety System for LHC RCS Review11/15 Cavern Surface Shaft Optical Link DSS COM NTP Server CERN LAN CPUs are comfortably separated to minimize danger of accidental damage Experiment’s Configuration ET crates act as cable concentrators near sensors/actuators Connection of both CPUs to NTP. Synchronization is better than 20ms (J. Brahy, E. Veyruns CERN AB-CO). Redundant cables running through two cable paths. Spares for all cables are foreseen. PROFIbus Front-end Control Room Back-end CERN LAN Back-End situated in the control room.

September 2 nd, 2003“The Detector Safety System for LHC RCS Review12/15 Experiment’s Configuration Cavern Surface Shaft Optical Link PROFIbus DSS COM Front-end Control Room Back-end CERN LAN Functionality grouped into “ Detector Safety Units ” All DSUs are alike. Each DSU is responsible for a distinct geographic area. 2-4 DSUs typical, 16 DSUs maximal possible per experiment.

September 2 nd, 2003“The Detector Safety System for LHC RCS Review13/15 DSU Layout Patch Panel Terminals to connect sensors / actuators (max. 352 digital channels OR 120 analog channels; optimum is 224 digital PLUS 64 analog channels) Table / Drawer Control Room Panel, Gyro & Siren (not part of a DSU) External Crate with dedicated Monitoring Module 2 nd External Crate possible Ethernet Switch for DSS COM (in DSUs with CPU crate) CPU crate (in two DSUs) Redundant 24V Power Supplies & Distribution Modules Front-End Display OPC Server / Gateway (in one DSU) Uninterruptible Power Supply (UPS) 52 units standard LEP rack (here: 56U)

September 2 nd, 2003“The Detector Safety System for LHC RCS Review14/15 Status TaskStatusTarget Date Front-End softwareOperational Integration, commissioning, and test of the complete prototype Finished Back-End softwareOperational System ReviewJune 2003 Installation / commissioning for CMSIn progressSummer 2003 First operational DSS for CMSSeptember 2003 Installation / commissioning for LHCbAutumn/Fall 2003 First operational DSS for LHCbNovember 2003 First operational DSS for ALICEMarch 2004 First operational DSS for ATLASDecember 2004

September 2 nd, 2003“The Detector Safety System for LHC RCS Review15/15 Conclusion The design of the Detector Safety System, arrived at in consultation with the DSS Advisory Board, will consist of… a Front-End: Siemens S7-400 redundant PLC hardware PC based OPC server acting as a gateway a Back-End: PC based system with the PVSS user interface, using CERN’s JCOP Framework Oracle Database connection for data and configuration logging The first system will be installed at CMS this September For more details see :