K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.

Slides:



Advertisements
Similar presentations
Levolors New Size-In-Store Blind Cutting Machine.
Advertisements

1 P720 PRINTER CLEANING PROCEDURES. 2 Printer Cleaning Instructions u For the P720 to Operate Properly It Is Important to Keep the Printer Clean and Free.
Expand Media Wall & Podium Case Training Video’s & Instructions.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
Optical Manufacturing Solutions 1 Probe Assembly.
Click on this image to open the full PDF document.
Cylinders and Actuators
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
Procedures during Tracker Connection WPA meeting 3 rd December 2007, Michael Eppard, CERN Installation sequence Manpower needs for installation work.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
G.Barber 28 Oct Construction/Refurbishment Of The Tracker Prototype Contents:- Welcome Back Plans Layout Things to be addressed New Schematic.
Takashi Matsushita Imperial College T. Matsushita 1 Engineering (Mechanical) Geoff Barber.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
Tracker Refurbishment. What was done… Over the past 3-4 months Trackers 1 and 2 have been refurbished. What does this mean? The trackers were removed.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
G. Barber Sci-Fi Tracker Progress Ral 28 Oct Progress On The Design Of The Full Tracker Contents:- Recap of New Station Layout Version 2.5 Version.
Dmitry Gudkov BE-RF-PM CLIC Module Working Group Engineering design of the adjustable supporting system for DBQ.
COFFERDAMS UWSH MANUAL CHAPTER 16 Cofferdam Design.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
G.Barber: Sci-Fi Mechanical Design - Tracker Meeting Cern 29 March Latest thoughts on Mechanical Design Contents:- Revised Fibre Pitch Fibre Optic.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
Final Tracker Connection Map Version 1 1 Connection Mapping for the Final Mice Trackers Geoff Barber November 2005 TM – 03 Jul 06 TM – 21 Jul 06.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
G.Barber Mice Tracker Integration Harbin Jan Mice Tracker Integration Installation requirements & Procedure.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
G.Barber Mice Tracker Mechanical Progress Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment of Tracker.
IOPtiMate™ OT-135P2 Technical Training – Part I System Description, Installation & Operation IOP (07)
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Installation Walkthrough Image Guide
STEP 1: ASSEMBLE ANGLE PLATES
Planning for Proto-DUNE PD Installation and Cabling at CERN
Copyright © 2016 by The S.E.A. Group
Service channels between Tracker and PP1
- CT INSTALLATION PROCEDURE OVERVIEW -
MICE Partial Return Yoke Mechanical Design
Installation step 4. (3 days)
DESCRIPTION AND GUIDE TO OPERATIONS
Far Detector Activities Late 2017 – Early 2018
Rod adaptors for module tests Module positioning studies
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Additional Upstream Coil Shielding
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Additional Upstream Coil Shielding
Cryomodule Assembly Plan
Step-by-step assembly instructions
Gattini Detector Installation
Step-by-step assembly instructions
Setting up of EVMs & VVPATs
Presentation transcript:

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware Requirements Alignment of Tracker Installation Procedure

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 2 Tracker 1 Status Tracker 1 is at present sitting in R8 at the Rutherford Lab. It is in the cosmic ray support frame in the vertical position. The frame was designed to allow the tracker to be installed in the horizontal position and then to be rotated to the position shown to optimise cosmic ray numbers. A value added to this is that we can use the same frame rotated to the horizontal to install the tracker into the beam line prior to the solenoids arriving should this be needed.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 3 Tracker 1 Status (cont) Tracker 1 is fully ‘fibred up’. This proved a bit of a challenge as the fibres did not attach to the station at consecutive connectors. As with all similar tasks the first 20 bundles were easy the last 5 were not. They are held in place using a ring of plastic pipe on brackets (a) and attached using double sided velcro ribbon (b). The velcro is wrapped around the bundles soft side in to protect the fibres and is also used where fibre bundles cross each other. (a) (b)

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 4 Tracker 1 Status (cont) To protect the fibres from damage during the installation of the lead absorber equipment tracker 1 is fitted with a carbon fibre tube internally. This tube (c) is just discernable in the photograph. The alignment feet are not yet fitted but are now ready when the tracker comes out of the tube. The mast extension brackets are also ready to be fitted. (c)

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 5 Tracker 2 Status All the stations for tracker 2 are ready to be assembled. We still require the space frames to be fabricated and this takes approximately 1 day per frame (4 frames). All the component parts for the frames are ready. We are not pressing to hard at this time because the tracker is not yet required and there are other urgent calls on the workshop time.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 6 Fibre Support Masts The fibre support masts are ready to be assembled. They consist of the aluminium components on the left. They are fitted with lengths of carbon fibre tubes. There is a rubber membrane at position ‘x’ to stop any off axis movement of the mast during installation being transferred as stress into the tracker. ‘x’

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 7 Alignment of Tracker The tracker sits on 4 adjustable feet two at the front two at the rear and is held down by a spring loaded foot at the 12 o’clock position. This aligns the axis of both tracker and solenoid The tracker is aligned in Z and Phi by pulling a locating block into a Vee which is located using dowels to the patch panel. All components are manufactured

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 8 Further Hardware Requirements The patch panel needs to have ‘o’rings to seal the patch panel to the solenoid and to seal the patch panel cover also the bulkhead connectors. The fibre support masts need to be assembled (all components available). Space frames for tracker 2 need bonding. Magnetic field sensors, we have plates and brackets but not the sensors or the power/signal feed throughs. Trellis * to support the external fibre bundles between the patch panel and the cryo’s. Manufacture of the installation channel. * * These to be produced from extruded section which will allow for ‘insitu’ modifications

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 9 Installation ‘Cartoon’ The following sequence shows the stages of installation for the tracker into the solenoid. This makes use of the installation mast All of this work will take place in a large black tent specially acquired for Mice.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 1 of Installation The patch panel is fitted and sealed to the solenoid. Hopefully at this stage we can test the seals using cover plates.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 2 of Installation An installation channel is fitted in front of the solenoid and aligned. This will allow us to safely insert the tracker, supporting it all of the way to its final position

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 3 of Installation The tracker, complete with the light guide support structure is lifted onto the installation cradle. The light guide support structure is to ensure that no damaging forces are exerted on the fibres. Covers will be fitted during transit.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 4 of Installation The tracker is then slide into its pre- determined position inside the bore of the solenoid. This position will already have had the ‘tracker target’ fitted, surveyed and removed. This will allow us to position the tracker, which will also have been surveyed, to the correct alignment.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 5 of Installation With the tracker in position and secure the light guides can now be carefully re-routed to their final position in the patch panel and the seals fitted. If the external light guides are not to be attached immediately then light tight/protection covers will remain fitted.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 6 of Installation The light guides can then be secured to stop any damage and a shield (not shown) fitted to stop any damage occurring when the diffuser is installed. The Light guide support structure is now removed.

K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb Stage 7 of Installation The patch panel cover is fitted and sealed to the patch panel. If we are not ready to fit the diffuser mechanism then a cover plate will be attached.