LHC Post Mortem Workshop - 1, CERN, 16-17 January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.

Slides:



Advertisements
Similar presentations
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automatic POWERING EVENT Analysis Adam, Arek, Gert-Jan, Ivan, Knud, Hubert, Markus, Nikolai, Nikolay,
Advertisements

Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Rapid Application Development Environment based on LabVIEW A. Raimondo (AB/CO) ATC/ABOC Days, January 2008.
TE/MPE/MI OP section meeting 29 th September 2009 HCC 2009 Frequently Asked Questions 0v1 M. Zerlauth.
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
TE-MPE-EP, RD, 06-Dec QPS Data Transmission after LS1 R. Denz, TE-MPE-EP TIMBER PM WinCC OA Tsunami warning:
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
MPE Review – June 2, 2015 A. Erokhin, TE-MPE-EE Upgrade, IST and Powering tests of the Upgrade, IST and Powering tests of the 600A Energy Extraction Systems.
 Software Tools for MPS Kajetan Fuchsberger MPP Workshop, 2013, Annecy Many thanks for input from M. Zerlauth, J. Wenninger, R. Schmidt, G. Kruk, V. Baggiolini,
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
Magnetic Measurement Systems for the LHC Dipole Assembly Companies A. Rijllart, J. Billan, J. Garcia-Perez, D. Giloteaux, A. Raimondo, V. Remondino, H.
AT Control Forum First Meeting. Introduction  The AT Controls FORUM :  Is responsible for coordination of the overall strategy for controls activities.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
OVERVIEW OF THE NEW FEATURES PVSS SCADA SYSTEMS USED DURING HCC MP3 - Frédéric BERNARD.
MA PM performance, Adriaan Rijllart Post Mortem data handling and performance Adriaan Rijllart, Beno î t Pannetier, Boris Khomenko, Greg Kruk,
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
DIAMON Project Project Definition and Specifications Based on input from the AB/CO Section leaders.
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
QPS high level controls LabView tools, an overview.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
HWC Review – Sequencer Vito Baggiolini AB/CO, with the team: Carlos Castillo, Daniele Raffo, Roman Gorbonosov.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Industrial Control Engineering ADE Rapid Application Development Environment.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
 Automation Strategies for LHC System Tests and Re-Commissioning after LS1 Kajetan Fuchsberger TE-MPE LS1 Workshop On behalf of the TE-MPE-MS Software.
ADE Alessandro Raimondo (ICE/MTA) ICE workshop, 23 th April 2009.
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
1 Cryogenics Instrumentation & Controls Commissioning for the LHC AB/CO viewpoint Enrique Blanco AB/CO IS.
AB-CO Review, 23 September 2005 L. Walckiers AT-MTM p. 1 Project description  To maintain for LHC completion  Magnet Rescue Activities [MAR]  Support.
 TE-MPE-PE Clean code workshop – R.Heil, M.Koza, K.Krol Introduction to the MPE software process Raphaela Heil TE-MPE-PE Clean code workshop - 9 th July.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
(Access system for HWC)
The Distributed Application Debugger (DAD)
LHC Beam Commissioning Meeting V. Kain & R. Alemany
A monitoring system for the beam-based feedbacks in the LHC
Data providers Volume & Type of Analysis Kickers
DRY RUNS 2015 Status and program of the Dry Runs in 2015
FCT and CERN Portuguese Trainee Programme Report
R. Denz, A. Gomez Alonso, AT-MEL-PM
Alarms in relation to PM
SCADA for Remote Industrial Plant
MP3 Review Software tools
How do we tackle the extended requirements?
J. Uythoven for the MPE-MI & MS Teams
The Control System For LHC Hardware Commissioning
Powering from short circuit tests up to nominal
Magnet Safety System for NA61/Shine
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Machine Protection System Commissioning plans
LHC BLM Software audit June 2008.
Planning next release of GAUDI
Review of hardware commissioning
Presentation transcript:

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual systems analysis applications B Khomenko, E Michel, B Pannetier, A Raimondo, H Reymond, A Rijllart 1.Introduction 2.Automatic analysis for the HWC 3.Manual analysis for experts 4.Status of the applications 5.Conclusions

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 2/52) AB-CO Measurement & Analysis 1. Introduction

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 3/52) AB-CO Measurement & Analysis 1. Introduction Three main clients are already involved with the PM analysis: - AT-MEL for the surface & tunnel HWC of the Quench Protection Systems - AB-CO-MI for the HWC of the Power Interlock Systems - AB-PO for the HWC of the Power Converters installed in the LHC

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 4/52) AB-CO Measurement & Analysis 1. Introduction Following several periodical meetings and specifications related to the SACEC and GLOBAL ANALYSIS, 2 types of tools have been developed by our section: - Automated analysis tools used via the Sequencer for the HWC - Dedicated applications for the experts (based on the same analysis)

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 5/52) AB-CO Measurement & Analysis 2. Automatic analysis for the HWC

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 6/52) AB-CO Measurement & Analysis 2. Automatic analysis for the HWC In the framework of the Hardware Commissioning, a test manager application has been developed (AB/CO-AP): the SEQUENCER - It gives the possibility to set & execute sequence of steps - Each sequence consists of a set of instructions - The instructions allow status read & real actions on the QPS, PIC & PC systems in the LHC tunnel

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 7/52) AB-CO Measurement & Analysis 2.1 Architecture of the systems

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 8/52) AB-CO Measurement & Analysis 2.2 Sequence of a test When a test is launched by the SEQUENCER: - Instructions & parameters are sent on the equipments according to the test (short circuit, interlock, powering to nominal) - Test data are sent to the PM Automatic Analysis (localization, test type, circuit name…) - When PM files are available, they are read from the PM server, and analysis are started - Then status (OK / FAILED) is returned by the PMAA to the Sequencer - According to the result, the next step will be executed or not

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 9/52) AB-CO Measurement & Analysis 2.3 Draft panel of the PM Automatic Analysis Circuit Name Step Name Result of the analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 10/52) AB-CO Measurement & Analysis 2.4 Sequence of the PM Automatic Analysis From the PMAA side: - A loader is waiting for the PM files on the PM server, according to the test data (circuit name…) - When a PM file is available, the specific analysis is executed and the result is returned to the Sequencer - When the results from the 3 analysis are generated: IF all is OK, a new test can be launched ELSE manual analysis should be done by an expert

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 11/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer - The software developed for the Sequencer is going to be integrated in the LHC-SEQUENCER (general sequencer for LHC physics & hardware) - The “old” Sequencer application will still be used for the long test (i.e. Dry Run) - PIC1, PIC2 tests will be managed via the LHC-SEQUENCER Should be available mid February/March Interaction with PMAA must be redesigned

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 12/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer LHC-SEQUENCER CMW PM analysis Test data Test data Analysis results Analysis results

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 13/52) AB-CO Measurement & Analysis 2.5 Actual status of the Sequencer - In case of problems at the beginning, oral communication between 2 operators is still foreseen LHC SEQUENCER PM ANALYSIS

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 14/52) AB-CO Measurement & Analysis 3. Manual analysis for experts

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 15/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 16/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 17/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 18/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 19/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 20/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 21/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis QPS data Post Mortem Server

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 22/52) AB-CO Measurement & Analysis 3.1 QPS Expert Analysis The QPS expert application can be used: - Magnet protection systems validation during reception phase - HWC of the systems installed in the tunnel

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 23/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 24/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis Automatic pattern analysis (i.e. Powering Failure, Discharge) Time selection & Display of 3 events

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 25/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis Logging LHC Ref DB PIC data Tunnel areas PIC systems Circuits

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 26/52) AB-CO Measurement & Analysis 3.2 PIC Expert Analysis The PIC expert application has been used during Dry Run in UA83 The automatic pattern recognition will be useful for the offline analysis during HWC in sector 7-8

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 27/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 28/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 29/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 30/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 31/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 32/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 33/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 34/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 35/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 36/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 37/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 38/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 39/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 40/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 41/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 42/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 Hz buffer

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 43/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 KHz buffer

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 44/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis 1 KHz buffer 50 Hz buffer

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 45/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 46/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 47/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis LHC Ref DB PC data Tunnel areas Converters types Powering sub circuit Post Mortem Server

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 48/52) AB-CO Measurement & Analysis 3.3 PC Expert Analysis The PC expert application is used for the HWC of the Power Converters

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 49/52) AB-CO Measurement & Analysis 4. Status of the applications

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 50/52) AB-CO Measurement & Analysis 4. Status of the applications - The communication method between PMAA & the new LHC- SEQUENCER has to be changed with CMW subscribe - Several parameters are still missing in the AA (i.e. limits, delay between signals, ranges …) - Specific views must be integrated to help experts during HWC (i.e. logical signals for PC, …)

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 51/52) AB-CO Measurement & Analysis 5. Conclusions

LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 52/52) AB-CO Measurement & Analysis 5. Conclusions - Analysis blocs can be easily re-used for new clients - Existing browsing structure can be adapted to new requests - Merge of the browsing or extraction tools for all clients could be possible - We are open to all the specifications