PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model.

Slides:



Advertisements
Similar presentations
HORIZONTAL CONVERSION KIT 4PXC*U Upflow to Horizontal Left
Advertisements

Stable Rise – Fixed Bracket / Stationary Top Installation and Set Up Guide Jaymil Ergo & Office Solutions 150 Dow Street, Tower 4, Manchester, NH
Basic Refrigeration Cycle
Installation. Indoor Unit Installation Typical Installation.
MER/SUP 1 DOOR EVAPERATOR DRAIN PAN REPLACEMENT 1. Remove the (4) screws that secure the evaporator coil, using a 5/16” socket.
Mer/Sup. 2 & 3 Door Evaporator Coil Repositioning Procedure S. Starnes 7/11/03 1. Remove the 2 screws holding one end of the evaporator coil. (view shows.
Universal Holding Cabinet Two screws hold each side; four screws secure the top.
KLINGE’S NMR 262 Two Independent Systems Integrated into one Unit This Requires Special Features:  Total Redundancy of Refrigeration Components  Total.
"AIR COOLER" Heat Exchanger
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Installation. Indoor Unit Installation Typical Installation.
Introducing new life saving eco friendly product the ‘SOLATRON SOLAR AUTO VENT’ You will never enter a scorching car anymore! The SSAV vents out the hot.
AIR CONDITIONING (COOLING)
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
School Name Date Volunteer Name Electric Generator SEEDKIT Workshop.
Title: Corvette C5 Column Lock Bypass Originator: John Neese Date: 30 Jan 2005 Revision: Sheet: 1 of 6 Column Lock Bypass.
Learning, our way Examples of bad installation. CONTENT Installation related examples Installation related examples Application related examples Application.
RESIDENTIAL AIR HANDLERS
Installation. Indoor Unit Installation Typical Installation.
AR4702 (cover plate replacement) Remove existing cover plate by removing the 2 x screws fixed through the top of the plate into the chassis (Phillips screw.
PC Assemble & Disassemble Trey, Josh, Jin-young. Step1. Checking PC Before performing disassemble, make sure the PC is working properly.
Setting up the Ricoh C305 Press F5 to start the Presentation
Removing and Replacing the Battery Cover 1. Ensure the phone is turned off. 2. Press the Battery cover locker; lift the battery cover up and away from.
Candela Display Systems 3x2 Interactive Video Wall System.
SIP POU cooler Installation Guide. Getting Started The SIP 2000 can be easily installed in most POU coolers in just a few minutes. The tools needed are.
ASSEMBLING THE PCB – V3.914 Hold the PCB as shown below.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
Compressor Replacement – ODU
P:\ISO \Work Instructions\Assembly\Options\ARMADILLO SWEEPER OPTIONS\10X ARMADILLO SWEEPER OPTIONS MODEL: KIT-MFG-ENG SHDN DSL M&FS SWA.
STEP-1 Open the screw cap with some sharp pin point object. STEP-2 Unscrew all the screws with help of a “+” type screwdriver. STEP-3 Disengage all the.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Genuine N1. Conversion Installation manual LC 120 5D 2003
STEP 1: ASSEMBLE ANGLE PLATES
RE 4/3 RPC Pre-assembly manual 1. HCP case preparation
X-Spot Lamp Socket Replacement Procedure
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Bilge Pump Service Project Model Service Kit
"This document can not be used without Samsung's authorization"
MANUFACTURING PROCESS OF TRANSFORMERS
2012 Technical Service Advisor’s Meeting
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
Soxhlet Unit B Maintenance By: Shawna Brookes.
Step-by-step assembly instructions
STEP 1: ASSEMBLE ANGLE PLATES
Step-by-step assembly instructions
LIGHT COMMERCIAL 2014 TSA Meeting
Genuine N1. Conversion Installation manual LC
Step-by-step assembly instructions
CL4NX +Dispenser (KITTING MANUAL)
Step-by-step assembly instructions
6. Disassembly & Reassembly
Horizontal Installation Overview
Exploring the Magic of Electricity
MASATS Door Systems.
HYBRID COOKTOP.
Step-by-Step Assembly Instructions – Cube Version
Quality Bulletin Horizontal deployment S/No. Product Model
Removes these two screws that attach the Controller to the Hopper Box.
Making a simple steady hand game
Step 1:Disassemble battery case
Replacing TrueAir Thermostat with Ecobee SI
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
REPLACING ECONOMIZER ACTUATOR MODULE
Repair Guide SYM XT Series.
Fix your Fireplace SYM-B Series.
Presentation transcript:

PROBLEM STATEMENT: EXCESS ICE FORMATION IN FREEZER COMPARTMENT ( 190L FF BAN FACTORY) Brand NameVideocon,Kelvinator Defect Pictures Product NameREF Model Name 190LFF (ALL VID +KEL MODEL) Manufacturing2016 Production Problem Location MUMBAI(4),KOLKATA(1), BANGLORE (6) INDORE(1),SURAT(1) Problem Reported fromCustomer Location Defect Qty (nos.) Total 13 Qty reported All Across India,where product replacement is done ProblemExcess ice formation in freezer section Analysis & Action Problem reported : Excess ice formation in freezer section Earlier Model 190L FF was Dropped due to the capillary chocking, Earlier glass heater was used, now heater location got changed. Hence after feedback from field, Secondary Heated will be used in future production. Countermeasure : Temp.Counter Measure is given where the heater needs to be installed at the freezer section. Excess ice Formation in cooling Coil Additional heater needs to be used for problem solution

STEP 1 Countermeasure :Methodology for fixing Al. Foil Heater in 202 (190L FF) Models Remove screw of the front panel and take out the front panel assembly Disconnect the fan motor wire assembly and keep aside. STEP Just lift up the capillary and suction tube joint carefully Lift up evaporator from RHS side slightly upper side Lift up evaporator from LHS side slightly upper side Remove the evaporator outside to insert the Al. Heater inside the drain pan.

Methodology for fixing Al. Foil Heater in 202 (190L FF) Models. STEP Remove the peel off paper from the adhesion tape of Al. Heater Bend the Al. Heater in 90° angle Insert and paste the Al. Heater inside at drain pan Check the heater hole matching and paste Al. Tape at the top side STEP Press and refit the evaporator back to original position Align the evaporator from RHS side and check no gap to liner Align the evaporator from LHS side and fit properly Press the capillary and suction tube back to original position and check no gap Al. Foil Heater Al. Tape Al. Foil Heater Additional Part : SUB THERMO,190 FF,WIRE HARNESS,SERVICE ALUMINIUM FOIL HEATER,235L FF,R600A

Methodology for fixing Al. Foil Heater in 202 (190L FF) Models. STEP Take the sub wire assembly and connect all the connection as per the shown in picture All connections to be kept on accumulator to avoid HV fail due to wire cut touching to evaporator. Note: Check all the electrical connections for ensure no continuity 5.2 STEP Reconnect the fan motor connection as per picture Re fix the Front Panel properly and check if any fan sound END Al. Foil Heater Eva Heater 1 Eva Heater 2 Fuse Conn Wire Harness 5.1 Sub Wire Assembly