Status of the design integration strategy and installation design January 2016 on.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Accelerator Integration Design Integration Group [DIG] Apr. 2015
Requirements Structure and Status for NCFE
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Design Office meeting Design office meeting.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Alain FRANCE for the ESS RFQ Team at CEA Saclay
Requirements Engineering for the Accelerator Eugene Tanke Systems Engineer Workshop on Requirements Conformance for SRF.
Critical Points Layouts For Storage Ring and Beamlines Ken Chow March 14, 2014.
Work to Date Analysis Work –Random Vibration Analysis of RICH2 Structure PSD data from LEP Tunnel (Including affect of large ventilation system) Excitations.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
RAPID WORKFLOW DEVELOPMENT AND DEPLOYMENT DESIGNING FOR DEVELOPERS.
CERN Methodology document 1 Use of CERN CAD Exchange tool Process and rules for exchange of CAD files by using CERN CAD Exchange tool. Prepared by : B.
FP 420 Connection Cryostat Design and Integration Keith Potter, Jaak Lippmaa, Guido Ryckwaert, Benoit Florin, Thierry Renaglia, Thierry Colombet, Shrikant.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
ELENA LAYOUT MACHINE status. Stephane Maridor/ ELENA collaboration ELENA – LAYOUT machine WHO WE ARE ? HOW IT WORKS ? STATUS of ELENA LAYOUT MACHINE ACCESS.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Integration Drawing Exchange Solution [IDES] Mar. 2015
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
NA62 Organisation of the work - proposal 2/24/20161PD/DT/PO-MH.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
ESS Bunker A concept for a common beamline interface. ISIS Engineering Group, February 2015 For illustration purposes a conceptual CAD model of the VOR.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
PLM-documentation management plans & status Henrik Lindblad Group Leader PLM & Process support Oct 16, 2014.
ESS wire scanner Benjamin Cheymol
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
WP2 : Collaborative tools Leandro Fernandez ICS Division November 26, 2014.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
PRELIMINARY VERSION Mechanical integration in the ESS Accelerator tunnel HENRY PRZYBILSKI.
Status of the 3D model and updates from the IKC models May 2015
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Overview of CATIA V5.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
Two-beam module layout
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Cryomodule test stand at ESS site
LBNF CAD models, Drawings and Component list
Alignment methods developed for the validation of the thermal and mechanical behavior of the Two Beam Test Modules for the CLIC project Hélène MAINAUD.
CATIA Design Requirements applied to Handling & Transport at CERN 26th CATIA Forum Jean-Louis GRENARD on Behalf of EN-HE design office 18-May-2017.
Warm structure requirements :
Test stand preparation and EMR "live" data summaries
ESS – RF checks up to cavity operation readiness in tunnel
Optimisation of the FETS RFQ
FAIR magnets fiducialisation WP 7.5
Overview of CATIA V5.
SPOKE Cavities frequency preparation plan and RF control procedures
Safety, reliability and maintainability
Mechanical Engineering & Technology (MET)
Mechanical Engineering & Technology (MET) section workshop
The Mechanical Engineering & Technology (MET)
as a prototype for Super c-tau factory
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
How Do We Define Acceptance of a Cryomodule? - A Discussion
Mounting & Alignment Malcolm Guthrie
Status of the ESS High Power RF Systems
Work Unit AIK 11.2 CDR of the CDS-SL Quality
General Overview of WP 12 ESS Vacuum System
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

Status of the design integration strategy and installation design January on behalf of DIG

Reporting in JIRA: CAD drawings 2 Preferably at least one CAD-able user from each IKC can have access and visit our reporting pages: DIG-DR ( ) now becomes obsolete and substituted by Frequently Used ESS #’s 2D-drawings in progress -Warm linac interface drawings: defined -Cold linac interface drawings: in progress -Installation maps: next step

Reporting in JIRA: CAD Inventory 3 The inventory of the CAD model for the accelerator is now summarized under a link: Inventory is reported per tunnel section with one of the following statuses: Current goal is to reach for all tunnel sections the level of: Each tunnel section contains sub-systems: Your feedback on the inventory status is needed

Integration strategy 4 “Strategy for the engineering integration of the ESS accelerator“ 49_final.pdf?version=2&modificationDate= &api=v2 “IKC 3D model guidelines” - ESS /valid  References for warm linac interface drawings included

Strategy for the engineering integration of the ESS accelerator 5 2. LinacLego 3. CHESS 1. DOORS Atlassian tool suite 4. CATIA 5. JIRA 6. Wiki

Strategy for the engineering integration of the ESS accelerator 6 2. LinacLego 3. CHESS 1. DOORS Atlassian tool suite 4. CATIA 5. JIRA 6. Wiki

Strategy for the engineering integration of the ESS accelerator 7 LEBTISRC RFQDTLSPKMBL etc… SPK-01 … SPK-02SPK-03SPK-13 SPK-02-LWUSPK-02-CM SECTION CELL SLOT BEAMLINE ELEMENTS SPK-02-LWU-QH01, SPK-02-LWU-QH02, … Level of exchange for the CAD files between IKC-ESS

[cell] SPK-1 [slot] SPK-CM-1 [End Point] SPK-LWU-1 Beam line [slot] SPK-LWU-2 SPK-CM-1 SPK-LWU-2 Beam line Strategy for the engineering integration of the ESS accelerator

Export CAD model structure - 3D model export structure: Product (assembly) at the top level Skeleton part IKC delivery unit A dedicated axis system is needed on all above mentioned insertion points CAD Integration reference points Geometrical points Mechanical points IN, OUT, MID of the slot on the beam plane Installation points e.g. support interface points Operation points centerpoints of interfaces e.g. flanges Optical points START, EXIT, MID of the lattice/optics reqs based on LinacLego (on the beam plane) Reference points Fiducial and alignment points IKC 3D model guidelines - ESS

ESS 10