PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session 3 21-23 Jan 2008.

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
MTTR, spare parts and stand- by policy for ATB equipments R. Losito AB/ATB 23th Jan ATC/ABOC Days 1.
Controls renovation WorkshopFE Software 1 Front-end software C.H.Sicard.
06/05/2004AB/CO TC RF controls issues Brief overview & status Requested from AB/CO Hardware, Timing, VME/FESA for LEIR, SPS, LHC Controls for LHC RF Power.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Linac-4 current situation and outlook U. Raich, F. Roncarolo, F. Zocca.
Status Report – Injection Working Group Working group to find strategy for more efficient start-up of injectors and associated facilities after long stops.
Controls for RF equipment AB/CO Review 22/9/2005 Andy Butterworth on behalf of AB/RF.
SPS re-commissioning with beam K. Cornelis PS-SPS days.
ATC / ABOC Days 23 Jan LHC injector Chain, E.A., Facilities. MTTR, spare parts and stand-by policy for BI equipments J.Tan AB/BI on behalf of BI.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Controls Issues Through the Backbone R. Steerenberg with help of many colleagues ATC – ABOC Days 23 January 2007 ATC – ABOC Days 23 January 2007.
Stephane Deghaye (AB/CO) The InCA project - S. Deghaye Accelerator Complex Controls Renovation Workshop Motivations & Objectives.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
Digital LLRF: achievements and LS1 plans M. E. Angoletta, A. Blas, A. Butterworth, A. Findlay, M. Jaussi, P. Leinonen, T. Levens, J. Molendijk, J. Sanchez.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
What’s Falling Apart in the Injector Chain ? PS/SPS Days January 2005.
The Minimum Workable LHC : Providers’ Commitments Summing-Up the following presentations: 1.ATB commitments and major issues [O. Aberle] 2.BI commitments.
Hardware Commissioning Review BDI Equipment
V4.
BE-CO YETS 2015/2016 Planned BE-CO tasks during the YETS 2015/2016
ABT-EC EYETS Activities 2nd reports
Accelerator Controls Renovation Project “ACCOR”
Update on BISW EYETS activities
Controls & software Andy Butterworth.
BE-CO Activities for LIU-CPS and LIU-SPS
J.-L. Sanchez Alvarez(PSB-EIC)
Summary of Session 6 ATC/ABOC days
Status and Plans for InCA
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Post-mortem of Experience with LEIR Controls
Instrumentation for SPS 2006 restart
BE-BI Software for LINAC4
M.Jonker CTC MPO-WG status
Installations, modifications, consolidation in 2005:
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
J. Uythoven for the MPE-MI & MS Teams
PS Machine Changes during the 2009 Shutdown
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
ABP/RTL Main RTL Activities for 2007/8:-
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008

Introduction Aim –Renovation of PS Complex controls to the AB/CO standard, compatible with the LHC – FESA, InCA Responsibilities –Simon Baird – Co-ordination –Stephane Deghaye – Application SW –Claude-Henri Sicard – Front-ends (HW & SW) –Hermann Schmickler (and his successor) – Providing resources (I.e. manpower and money) Must be done in close collaboration with equipment groups –What do the equipment groups have planned ?

AB/BI All new hardware uses FESA –But BI equipment needs a lot of specialised application programs… PS tune measurement – new BBQ –Test in 2008 (expert application exists?) –PSB tune measurement? Wire scanners – new electronics –Validation in 2008 in PSB, installation 2009 PS Orbit measurement – new system installed for 2008 start-up (parallel) –Test new application mid-2008

AB/BI Fast BCT’s – new electronics test at PSB –Replace old system in 2009 –Used by PSB Watchdog PS 6-turn transformer: to be replaced by 1000 turn device (expert use only) BLM’s nothing planned before 2010 LEIR ionization profile monitor? REX-ISOLDE, SEM-GRIDS, Experimental areas?

AB/PO Continue to use 1553 communication (>5 years) –Including all current renovation/consolidation work –CO is preparing a new PC-based 1553 controller From 2009 (main changes starting in 2010): –FGC3* for all renovation (starting with PSB multi-pole consolidation) and LINAC4. –FGC3 integration into OASIS –FESA for FGC3? (to be discussed) –Commercial RS-422 system for DC power converters Renovation of interlocks needs to be coordinated with AB/CO and AT/MEL (PSB Multi-poles…) * Function Generator Controller

AB/ATB Control of movable devices –Slits, stoppers, dumps etc… “PLC with motor controllers” solution –Ethernet CO communication with a FESA gateway (supplied by ATB) –Generic Controls (knobs, in/out etc.)

AB/BT Use CO/PO “1553” standard Septa –Movement – G64, but this is not ppm and local adjustment is possible –Possible FESA implementation in 2009/10 for PS electro- static septa? Kickers –MTE will use FESA –PSB distributor, extraction/recombination kickers and slow bumpers – FESA in 2009? –PS KFA – FESA in 2010? Other kickers 2011? –LEIR, AD, ISOLDE?

AB/RF New PS transverse damper ready for 2008 start-up using FESA PS & PSB digital beam control and feedback – pilot project for 2010 Cavity control – G64/1553 “for several years” PS “RF 200 MHz matrix” –Replaced by GFAs –New application for 2008 start-up (Using existing “PS equipment module”) LINAC2 & 3: common PLC front-ends “could move to FESA”

Conclusions There will not be an overnight PS Controls “big bang”, but there is already plenty to do in 2008 CO (Stephane & Claude-Henri) will evaluate –Implications for CO of the work proposed by equipment groups –Estimate if CO can meet these demands? Interaction with Equipment Groups to produce a realistic planning This may mean… –Changing Equipment Group priorities? –Reducing Controls effort in other areas?