FCC Special Technologies WP The objective of this WP is to identify the challenges, the showstoppers and look towards opportunities for technology breakthroughs.

Slides:



Advertisements
Similar presentations
Talent Management at Kellogg
Advertisements

WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
From Research Prototype to Production
HL-LHC Quality management
MARIFISH (Era-Net) Programme – Sequencing of Activity Work Packages Jul-10 Implement communications strategy Jan-07Jul-09Jan-10Jul-07Jan-08Jul-08Jan-09.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Radiation Tolerant Electronics New Policy? Ph. Farthouat, CERN.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
R2E Report M. Brugger for the R2E Study Group RadWG Meeting, August 20 th 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Chapter 3 Strategic Information Systems Planning.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
FCC Special Technologies WP Task 11 Radiation Hardness Assurance TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Workshop summary Outline  Workshop’s aims  Highlights from the presentations (my selection!)  Costing Exercise – What we learnt  Summary - Roadmap.
WP2 (Detector development) Summary Gabriella Pugliese INFN – Politecnico of Bari.
R2E/Availability Workshop Report - RadWG October 22 nd 2014 R2E/Availability Workshop 2014 October th 2014 R2E/Availability Workshop RadWG - Brief.
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
1 st Consortium Management Team Meeting University of Belgrade 27 th -28 th November 2014 WP8 - Management Progress Presentation (month 1- 12) Prof. dr.
Bob Jones EGEE Technical Director
Continuous Improvement Project (A Guideline For Sponsors)
LHeC Coordination Meeting, 9 June 2017
Current IAASB Developments
EGEE Middleware Activities Overview
Radiation Hardness of Electronics in the FCC
CSP 25th November 2010 Technical agreement number 3: overview
The European Strategy for Particle Physics
Integrated Management System and Certification
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
WP8 – Improvement and equipment of irradiation beam lines
The ILC Control Work Packages
THE PROCESS OF EMBEDDED SYSTEM DEVELOPMENT
Ways to industry participation in CLIC 24th October, 2017
Chapter 18: Introduction to Assurance
Working for a detector project: A message from AIDA
Process of the 2nd update of the European Strategy for Particle Physics FCC week, 29 May 2017, Berlin Sijbrand de Jong, President of the CERN Council (slides.
Irradiation Facilities Questionnaire
Testing Plan Workshop Santa Cruz County BH
nuSTORM and the Physics Beyond Colliders workshop
GRANT – RECAPITALIZATION OF LIBRARY SERVICES SEPTEMBER 2009
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
How to Successfully Implement an Agile Project
2017 Safety Group 1 – 5 Year Program Timeline Guide
Overview of WMO Strategic Planning Initiative
Status of CO2 Cooling tests at CERN for Pixel phase 1
Amendment Invoice Task Force Progress Report
Strategic Plan Implementation July 18, 2018
1st HiLumi LHC / LARP Collaboration Meeting 2011 Nov 17th
Overview of SDG indicators - latest developments
Amendment Invoice Task Force Progress Report
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
General Assembly Meeting
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
The WIGOS Pre-Operational Phase
2016 Safety Group 1 – 5 Year Program Timeline Guide
2012 Safety Group 1 – 5 Year Program Timeline Guide
East Hall under construction
Radiation Working Group RADWG
Leverage effect of PAFs : experience from CAP integration
Presentation transcript:

FCC Special Technologies WP The objective of this WP is to identify the challenges, the showstoppers and look towards opportunities for technology breakthroughs. Indeed, this last argument will complement perfectly the Physic Cases to get an approval for the next step of the FCC Study. 22 June 20161M.Brugger & M.Capeans

FCC Special Technologies WP Task 11 Radiation Hardness Assurance (Oct’15 – Dec’18) RHA consists of all activities undertaken to ensure that the electronics and materials developed for FCC perform to their design specifications after exposure to the FCC radiation environment. RHA deals with environment definition, part selection, part testing, radiation tolerant design, and FCC subsystems requirements. TASK 1 Field conditions and radiation levels at FCC TASK 2 FCC Qualification Protocols TASK 3 Equipment needs for the accelerator, particle detectors and service systems TASK 4 State of the art and development efforts on radhard components for HL-LHC TASK 5 New Technologies: Radiation monitoring systems, Luminosity monitors, Radiation- hard sensors and readout for environmental monitoring (P, T, H) for detector and accelerator equipment, Interconnection technologies reliability, High density assemblies on PCB, New materials for electronics… 22 June 20162M.Brugger & M.Capeans

FCC Special Technologies WP Task 11 Radiation Hardness Assurance BACKGROUND WORK Task 1: Field conditions and radiation levels at FCC Task 2: Qualification Protocols: Define FCC qualification requirements (safety factors, sample size, procedures) for components and systems, including particle detectors and FE electronics. Evaluation of current irradiation facilities and testing infrastructure at CERN and available worldwide; proposal of upgrade programs for facilities at CERN, if needed. Task 3: Equipment needs for the accelerator, particle detectors and service systems. Identification of technologies used at FCC and radiation levels they will be exposed to: propose strategies for RHA taking into account maintenance, reliability and remote operation. Catalogue of critical equipment (technology, supplier, function, etc.) and possible common developments. Task 4: State of the art and development efforts on rad hard components for HL-LHC. Intensive work is ongoing in terms of radiation hardening of electronics, components, materials and detectors in the framework of R2E, RD50, RD51, RD53, presently with a main focus on HL-LHC. Cost optimization for electronic systems will most likely have to consider the use of components of the shelf (COTS), thus a respective early technology analysis will be key throughout the development process. Assuring the continuity of these research projects will guide us towards the FCC and assure that expertise in radiation testing/hardening is kept, testing facilities are kept operational and state-of-the-art as well as forefront development electronics is tested and radiation hardened at any point in time. Evaluate HL-LHC VS FCC needs, identify common versus specific developments. EXPERIMENTAL WORK Task 5: Technologies: define needed developments linked to technologies: wireless communication, miniaturization, optical transmission, compactness, on-chip optical/electrical, packaging, new materials… Example: i) establish a program to develop miniaturized prototypes, ii) develop prototypes, iii) test prototypes at irradiation facilities to define threshold for miniaturization with respect to radiation hardness Specific system development and qualification: Radiation monitoring systems (for detector and accelerator areas), Luminosity monitors, Radiation-hard sensors and readout for environmental monitoring (P, T, H) for detector and accelerator equipment, Interconnection technologies reliability, High density assemblies on PCB, New materials for electronics 22 June 20163M.Brugger & M.Capeans

Goal of today’s meeting 22 June 2016M.Brugger & M.Capeans4 Available informationActionWho Information about available resources Update about ongoing workProduce a status report for FCC mgtMar & Markus Review of deliverablesSet up priorities, Identify deliverables’ owners, review teams Set up regular task meetings All

Resources 22 June 2016M.Brugger & M.Capeans5 CategoryBudget (PM) June16Remaining months FELLOW3024 A.Infantino (from 1/2/16)0 PJAS306 m (1/1/16 – 30/7/16)23 PhD6036 G.Gorine EP-DT (from 1/11/15) 24 G.Borghello EP-ESE (from 1/8/16) 0 CategoryBudget (kCHF) FLUKA/TCAD/Spice model development50 Evaluation of irradiation and testing infrastructure requirements210 Development of a radiation tester60 Development of radiation sensor100 R&D on materials radiation damage50 470

Project Nov 2015 Task 1: Field conditions and radiation levels at FCC Resources: Selected Fellow candidate got delayed, started only as from February 1 st (hosted by EN) Progress: work started earlier using resources of the R2E project Task 2: Qualification Protocols and Facilities Resources: FCC Doctoral student started (G.Gorine, EP-DT) Evaluation of existing irradiation facilities and and adapting them for the FCC qualification program Development of integrated radiation sensor for high energy hadron and mixed rad environment for TID/DD/SEE measurements at FCC Task-3: Equipment needs Resources: PJAS being agreed Communication links and common building blocks -> linked to BE/CO (strategy requirements discussed) Interesting component identified (NDA with company signed) University collaboration established Ready for PJAS hiring procedure as from autumn 2016 Tasks 4/5: FCC Technologies and HL-LHC efforts Agreement with EP-ESE for FCC Doctoral Student in 2016 Committee (starting as PJAS asap) Compilation of available results on rad tolerant state-of-the art electronics Prediction of the radiation response of 65nm technology in a real accelerator environment Tests of 28nm transistors, FINFETs, miniaturization trends Other: Link to WP3 (3.4) -> Pieter van Trappen (iterated through RadWG and first tests to be prepared) November 20156M.Brugger & M.Capeans + Update by Ruben at FCC week in Rome, April t/438866/contributions/ /attachments/ / / _Radiation_Hardness_ of_Electronics_in_the_F CC.pdf

Work ahead/Deliverables 22 June 2016M.Brugger & M.Capeans7 FCC Task 11 DeliverablesMonth By end of TASK 1 Field conditions and radiation levels at FCC D1-1. Evaluation of FLUKA models’ needs (environment and effects)M6 Mar’16 D1-2. FLUKA tuning for FCC (operational/layout options/requirements)M12 Sep’16 D1-3. Agreement on FCC target radiation field/levelsM14 Nov’16 TASK 2 FCC Qualification Protocols D2-1. Define overall FCC qualification requirements as input to RHAM12 Sep’16 D2-2. Evaluation of current irradiation facilities and testing infrastructure M20 May’17 TASK 3 Equipment needs for the accelerator, detectors, service systems D3-1. Identification of technologies used at FCC with their expected radiation levels M14 Nov’16 D3-2. Catalogue of critical equipment (technology, supplier, function, etc.) M18 Mar’17 TASK 4 State of the art and development efforts on radhard components for HL-LHC D4.1 Evaluate HL-LHC VS FCC needs of rad hard componentsM20 May’17 TASK 5 New Technologies D5.1 Prototype status and definition of developments linked to technologies M20 May’17 D5.2 Radiation tester of advanced components/systemsM36 Sep’18 D5.3 Radiation sensorM40 Jan’19 The FCC study will produce a conceptual design report to be delivered in time for the next update of the European Strategy for Particle Physics, foreseen by 2018.